Inspection and Approval of Asphalt Mix Design Laboratories

Similar documents
Inspection and Acceptance of Asphalt Mix Design Laboratories

Aug 17, 2001 LAB MANUAL MAXIMUM SPECIFIC GRAVITY (RICE VOIDS TEST) OF PAVING MIXTURES AASHTO Designation T 209 (Mn/DOT Modified))

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

METHOD OF TEST FOR THEORETICAL MAXIMUM RELATIVE DENSITY OF BITUMINOUS PAVING MIXTURES LS-264 R27 ASTM D2041/D2041M

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST

IN-PLACE DENSITY WAQTC FOP AASHTO T 209 (16)

INTERNATIONAL SLURRY SURFACING ASSOCIATION TECHNICAL BULLETIN. 800 Roosevelt Road, Building C-312, Glen Ellyn, IL 60137

DETERMINING OPTIMUM RESIDUAL ASPHALT CONTENT (RAC) FOR POLYMER-MODIFIED SLURRY SEAL (MICROSURFACING) MIXTURES

ASPHALT PLANT LEVEL 1

BULK SPECIFIC GRAVITY AND UNIT WEIGHT OF COMPACTED HOT MIX ASPHALT (HMA) (Kansas Test Method KT-15)

ASPHALT WAQTC FOP AASHTO T 209 (12)

Tex-227-F, Theoretical Maximum Specific Gravity of Bituminous Mixtures

Commonwealth of Pennsylvania PA Test Method No. 742 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for

Tex-206-F, Compacting Specimens Using the Texas Gyratory Compactor (TGC)

COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for

Florida Method of Test for MEASUREMENT OF WATER PERMEABILITY OF COMPACTED ASPHALT PAVING MIXTURES

OHD L-47. Guidelines for Resolving Differences in Test Results

Chapter 37 Tex-241-F, Superpave Gyratory Compacting of Test Specimens of Bituminous Mixtures

Method of Test for Sieve Analysis

Virginia Calibration Methods

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

Limerock Bearing Ratio Technician Training Course

ASPHALT PLANT LEVEL 1

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

Tex-616-J, Construction Fabrics

Tex-207-F, Determining Density of Compacted Bituminous Mixtures

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

OHD L-43 METHOD OF TEST FOR DETERMINING RUTTING SUSCEPTIBILITY USING THE ASPHALT PAVEMENT ANALYZER

Method of Test for Flat & Elongated Particles

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE

Soil Aggregate *Nominal Maximum Minimum Weight No. of Splits to Obtain Designation Sieve Size of Particle of Sample, Ibs Portion for Test

Use Part II for absorptive mixtures that have more than 2.0 percent water absorption.

K-STATE GRAIN QUALITY RESEARCH PROGRAM STANDARD OPERATING PROCEDURES

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL

Apr 16, 2010 LAB MANUAL 1810

Method of Making and Curing Concrete Specimens in the Field for Compression and Flexural Tests

IA ASPHALT EVAULATION PERFORMANCE EVAULATION

Asphalt Mixture Quality Acceptance

TxDOT Project : Material Design and Testing Methods for Home Made and Containerized Cold Mix

2014 PennDOT Gmm Verification Program

TEST FOR STABILOMETER VALUE OF BITUMINOUS MIXTURES

Density of Granular Material by Modified Sand-Cone Method for Thin Layers

State of Nevada Department of Transportation Materials Division METHOD OF TEST FOR SAND EQUIVALENT

Measurements. Metric System

Oct 1, 2002 LAB MANUAL SPECIFIC GRAVITY & ABSORPTION of FINE AGGREGATE AASHTO Designation T 84 (Mn/DOT Modified)

DETERMINING DENSITY OF COMPACTED BITUMINOUS MIXTURES

Density of Soils and/or Granular Material In-place by the Sand-Cone Method

Hot Mix Asphalt (HMA) Quality Assurance

Asphalt Mixture Quality Assurance

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

Jan 10, 2002 LAB MANUAL

Service Call: Vacuum Prevention System Testing on Category A and B Aerial Devices. Tools Required: 1. Atmospheric Vent Test Set (P/N )

Assembly drawing and the names of features

AIR CONTENT OF FRESHLY MIXED CONCRETE BY THE PRESSURE METHOD (Kansas Test Method KT-18)

Tex-416-A, Air Content of Freshly-Mixed Concrete by the Pressure Method

PRE LABORATORY ASSIGNMENT: Lab Section Score: /10 READ THE LAB TEXT BEFORE ATTEMPTING THESE PROBLEMS!

Standard Test Method for Capillary-Moisture Relationships for Fine-Textured Soils by Pressure-Membrane Apparatus 1

Air permeance of paper and paperboard (Sheffield method)

DETERMINING DENSITY OF COMPACTED BITUMINOUS MIXTURES

tel: fax: web:

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

AGGREGATE INFORMATION

Lab Session #4 AN Physical Properties

Tex-207, Determining Density of Compacted Bituminous Mixtures

R: The Ideal Gas Constant Pre-Lab Assignment

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Schedule of Requirements THERMODYNAMICS LABORATORY- CHEMICAL ENGINEERING DEPARTMENT

ASPHALT PAVEMENT ANALYZER (APA)

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

ISO 9597 INTERNATIONAL STANDARD. Cement Test methods Determination of setting time and soundness

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

Vacuum Pycnometer BM705. Impact Test Equipment Ltd & User Guide. User Guide

In Place Density Determination of Asphalt Concrete by the Coring Method

ASTM D86 - Procedural Outline

Hot Mix Asphalt (HMA) Quality Assurance

Test Method for Measurement of Stability and Resistance to Compaction, Vertical and Lateral Displacement of Multilayered Fine Aggregate Cold Mixes

Standard Test Method for Vicat Softening Temperature of Plastics 1

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z TROXLER ELECTRONICS LABORATORIES, INC. James Pratt Phone:

MILITARY SPECIFICATION POWDER, BLACK

An Urgent Bulletin from CSA Group

OP CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST

POLYMER TEST KIT (CLAPPER METHOD) OFI PART No

Technical Procedure for General Laboratory Equipment

SUPERPAVE MIX DESIGN. Superpave Mix Design 1

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

TECHNICAL NOTE. October 23, Procedures for Verifying Temperature Calibration

EXPERIMENT 8 Ideal Gas Law: Molecular Weight of a Vapor

Binks SG-2 Plus TM 2 QT. PRESSURE CUPS Model No (Standard) Model No (with OscillatingAgitator)

Standard Test Procedures Manual

CHM 100 / Introductory Laboratory Experiment (r10) 1/11

Test pumps. Pressure sources. Good reasons for proper and reliable calibration

Standard Operating Manual

AUTOMATIC HOSE TEST UNIT, TYPE SPU

6200 Isoperibol Calorimeter Model Number: 6200

Missouri University of Science & Technology. MoDOT TENSILE STRENGTH RATIO (TSR) TRAINING/CERTIFICATION COURSE

Piped Air SCBA Refilling System Standard

Experiment 13 Molar Mass of a Gas. Purpose. Background. PV = nrt

OPERATOR S MANUAL Ar-Gone Weld Gas Analyzer

Transcription:

Supplemental Technical Specification for Inspection and Approval of Asphalt Mix Design Laboratories SCDOT Designation: SC-M-405 (06/07) 1. SCOPE 1.1 This method covers the process for inspection and approval of asphalt mix design laboratories for use in designing asphalt mixtures for SCDOT projects. This method is not a safety inspection. The Contractor is responsible for maintaining the safety requirements for the asphalt mix design labs. 2. REFERENCED DOCUMENTS 2.1 SCDOT Standard Specifications 2.1.1 Division 300, Division 400 2.2 AASHTO Standards 2.2.1 T 245, T 312, PP 19, R 18 2.3 SCDOT Test Methods SC-T-66, SC-T-68, SC-T-70, SC-T-83 3. REQUIREMENTS FOR ALL MIX DESIGN LABORATORIES 3.1 Ensure that the building is made and designed for use as either a laboratory or office that has been converted to serve as a laboratory. The minimum allowable laboratory floor space is 250 square feet. Under no circumstances will a tractor trailer or any other cargo type trailer be acceptable. All laboratories must also have two working doors for safety access. 3.2 Provide all required mix design laboratory equipment listed on the Mix Design checklist, SCDOT Form SC-M-405A. 3.3 Calibrate the required mix design laboratory equipment according to AASHTO R 18, using SCDOT checking, verification, and calibration procedures. Make available all equipment calibration records and keep them in an organized manual in the mix design laboratory. 3.4 Equip the laboratory with windows, doors and ventilation systems that function properly and maintain the ambient air temperature between 65 o F and 80 o F 3.5 Notify the Asphalt Materials Engineer, in writing, when the mix design laboratory is ready for initial inspection. 3.6 A representative of the Asphalt Materials Engineer will perform an inspection and verify that the laboratory complies with current standard specifications, and the attached checklist. During the inspection, ensure that a Quality Control Manager or representative is present to certify that all equipment is present and that by signing Form SC-M-405A, 1

they are guarantying that all equipment will remain in the laboratory and will be calibrated or verified as required by AASHTO R 18. 3.7 Upon meeting all requirements for approval, a yearly approval decal will be placed at a suitable location inside the mix design laboratory. If at anytime all requirements are not met, the approval may be revoked. 2

Asphalt Mix Design Laboratory checklist Attachment to SC M-405 (06/07) I. CONTRACTOR INFORMATION: Asphalt Contractor: Location: Contractor's Representative: Contractor's Signature: Date Inspected: Inspected by: Next Inspection Due Date: SCDOT Cert. # II. LAB STRUCTURE YES or NO Size and type of structure: Floor space (min. 250 sq ft.) Height Width Type of Structure Is sufficient water available for all tests? Is sufficient and satisfactory furniture for office work provided? Are satisfactory electric lighting and electric outlets provided? Are suitable worktables and/or benches provided? Are locks provided for the windows and doors? Is there sufficient ventilation from solvents and other chemicals if applicable? Is the laboratory equipped so that the temperature inside the laboratory can be maintained between 65 80 F? 3

III. EQUIPMENT 1. Gyratory Compactor (meeting requirements of AASHTO T 312) including calibration kit (pressure / angle / height / rotation), and an extractor jack. a) Four (4) Compaction Molds b) Printer for printing heights of specimens c) 6 ITS Tensile Strength Head d) 6 Compression Mold Breaking Head e) Curing pans for specimens that meet AASHTO PP 19 (capable of spreading the mixture at maximum of 2 deep) f) Gyratory specimen protection disk 6 diameter g) Garden spade minimum 2 wide h) Flat spade ¾ wide and 6 long 2. Complete Marshall Apparatus: a) Automatic Compaction Hammer (meeting AASHTO T 245) b) (12) Compaction Molds c) 4 Compaction Mold Breaking Head d) 4 ITS - Tensile Breaking Head e) Marshall Specimen Protection Paper Disc. No. 4 f) Hot Plate g) Sand bath for Marshall Hammer h) Extractor jack assembly - hydraulic type for extruding specimens 3. 4. Compression and Testing Machine must have recorder to measure stability and flowmin. capacity of 10,000 lbs. capable of testing 4 or 6 specimens. Hot water bath capable of maintaining a constant temperature of 140 F ± 1.8 F (60 ± 1 C) throughout the entire volume of the bath. Water bath meeting testing standards specified in SC-T-66 and SC-T-70. 5. Cold water bath equipped with a water circulator capable of maintaining a constant temperature of 77 F ± 1.8 F (25 ± 1 C) throughout the entire volume of the bath. Water bath should meet the testing standards specified in SC-T-68 and SC-T-70. Ensure that bath has a cradle or a suitable hook for weighing immersed specimens. 6. Maximum Gravity Equipment (Ref. SC-T-83): a) Vacuum pump capable of pulling a vacuum of less than 30mm Hg from daily atmospheric pressure within 2 minutes of beginning the test. b) Pycnometer or metal container having a capacity of at least 2,000 ml c) Container with a cover fitted with a rubber gasket and a hose connection. Hose opening is covered with a small piece of No. 200 wire sieve mesh. d) At least one (1) liter flask or desiccator to be used as a water vapor trap e) Gauge and manometer (digital or mercury) installed in line to monitor vacuum. f) Kraft brown paper, or equivalent, for preparation of sample approximately 3 x 3 7. Double-walled convection laboratory oven with an inside volume of at least 2.5 cubic feet. This oven should be capable of maintaining a temperature of 230 F ± 9 F (110 C± 4.4 C) - Drying Oven. 8. Double-walled-thermostatic-controlled-forced-air laboratory oven with a minimum inside volume of 5.0 cubic feet. Oven is capable of maintaining a temperature of 295 F ± 5 F (146 C ± 2.5 C) Mold Oven. 4

9. Double-walled-thermostatic-controlled-forced-air laboratory oven with a minimum inside volume of 12.0 cubic feet. Oven is capable of maintaining a temperature of 350 F ± 5 F (176 C ± 3 C) Heating Oven. 10. Sample splitter with a minimum of eight chutes with minimum of (3) splitter pans. Fine Aggregate 11. Sample splitter with a minimum of (8) chutes, each 2 wide with minimum of (3) splitter pans. Coarse Aggregate 12. Large motor-driven shaker complete with screens of suitable sizes. (Gilson TS-1, TM-1 or equivalent) 13. Following sieves required for the large shaker: 1½, 1, ¾, ½, #4, #8 and bottom pan 14. 8 or 12 sieve shaker. (Ro-Tap design or Mary-Ann style) - Must have a tapping device 15. Following sieves required for the shaker: 1, ¾, ½, 3/8, #4, #8, #30, #100, #200 and bottom pan 16. Suitable Sieve Brushes at least one brass or steel and one nylon 17. One (1) Wash #200 sieve with protective #16 or #8 sieve along with sampling pans / pots needed to perform washed gradations 18. Calipers capable of measuring up to 6 or 150mm and accurate to (0.001 or 0.01mm). 19. Two (2) calibrated timers 20. Two (2) 12 kg electronic balances accurate to 0.1 grams. 21. Thermometers a) 140 F Mercury Thermometer (such as a ASTM 20F or ASTM 45F NIST traceable) b) 77 F Mercury Thermometer (such as a ASTM 17F or ASTM 47F NIST traceable) c) 300 F Thermometer (Mercury or Thermocouple- NIST traceable) 22. Water Softener (i.e. Calgon without oil beads) 23. Bowls or pans for batching aggregates minimum of 10 24. Graduated cylinder or beaker for accurately adding water to batched samples with Hydrated Lime 25. Dispensing pot for heating asphalt binder or tongs to distribute binder 26. Mechanical Mixer 12 quarts or larger or bucket mixer 27. OGFC draindown basket necessary for OGFC designs 28. Insulated gloves 5

29. Penetrating Oil 30. Cloth Towel Water absorbent for bulk specific gravity specimens V. CALIBRATION RECORDS YES OR NO 1. Calibration records available in the lab? 2. Calibration records kept neat and legible and according to SC-Verification or Check procedures? 3. Equipment calibrations up to date? a) Marshall Hammers? b) Gyratory compactor? c) Molds (Marshall and Gyratory)? d) Heating Ovens? e) Water Baths? f) Timers? g) Vacuum System? h) Thermometers? i) Sieves? j) Sieve Shakers? k) Stability Machine? REMARKS: Form SC-M-405A 6