Upgrade to smart motorway Junctions 3 to 12

Similar documents
M1 Smart Motorways Junctions 32 to 35a

Upgrade to smart motorway Junctions 2 to 4

Highways England Creative GFD18_0125. Welcome. Upgrade to smart motorway junctions 3 to 12

Upgrade to smart motorway Junctions 13 to 16

M20. Upgrade to smart motorway Junctions 3 to 5

M23. Upgrade to smart motorway Junctions 8 to 10

Proposed smart motorway Junctions 2 to 4

Know your smart motorways M60/M62, Greater Manchester

Smart motorway. M6 junctions 16 to 19

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX]

Welcome. Smart motorway M6 junctions 13 to 15 public information exhibition. Highways England Creative BHM18_0060_RHK

M6 Junction 10 Public Consultation

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

M25 junction 28 improvement scheme. Have your say

A30 Chiverton to Carland Cross Moving forward: The application

M6 junction 16 to 19 Smart motorway project newsletter

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

A52 Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition

M6 J7 Rushall Canal: Essential Repair Work Briefing

M6 Junctions 16 to 19 smart motorway project

A27 East of Lewes improvement scheme Have your say

Improving journeys to the South West The case for the A303/A358 corridor

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Safe roads, reliable journeys, informed travellers. The economic assessment of Managed Motorways - All lanes running Interim Advice Note 164/12

Smart motorways: all lane running on the M25. Guidance for EEAST crews

CUERDEN TRANSPORT PROPOSALS

The Delivery Hub health, safety and environment Raising the bar 19 Noise The Delivery hub health, safety and Version environment

M6 Junction 13 to 15 Smart Motorway Variable Mandatory Speed Limits (VMSL) Summary of Statutory Instrument consultation responses March 2018

M1 J28-31, M1 J31-32 and M1 J32-35a smart motorways Summary of Consultation Responses

Managed Motorways Experience from the UK

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Know Your TRAFFIC SIGNS. Official Edition. London: TSO

Incidents and roadworks

CAMBRIDGE SOUTH WEST PARK & RIDE

Tackling congestion by making better use of England s motorways and trunk roads

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY

Guildford Borough (Draft)

KC Scout Kansas City s Bi-State Transportation Management Center

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

INTERIM ADVICE NOTE 188/16

I-25 South Gap Project Monument to Castle Rock

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

DRAFT INTERIM ADVICE NOTE 150/17

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015

Motorways (autobahns) Abandoned motorway projects. New roads schemes according to the 2030 Federal Transport Infrastructure Plan

Queensferry Crossing and Forth Road Bridge Users Guide

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Health & Safety Standard Procedure. Pedestrian and vehicle safety in schools

MARKHOUSE ROAD IMPROVEMENTS

Smart Motorways (all lane running and hard shoulder running)

4. Guided Bus Explained

KC Scout Kansas City s Bi-State Transportation Management Center

Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial. Rob Douglas-Jones Tim Segedin, Edin Ltd.

USE OF SPEED AND RED LIGHT CAMERAS FOR TRAFFIC ENFORCEMENT: GUIDANCE ON DEPLOYMENT, VISIBILITY AND SIGNING

ROAD SIGNS IN THE CZECH REPUBLIC.

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.

STADIUM London demonstration - Olympics 2012

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

INTERIM ADVICE NOTE 144/16 DIRECTIONAL SIGNS ON MOTORWAY AND ALL-PURPOSE TRUNK ROADS GRADE SEPARATED JUNCTIONS

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

A63. Castle Street improvements Princes Quay Bridge and Roger Millward Way

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

TRAFFIC ADVISORY LEAFLET

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

Tackling congestion by making better use of England s motorways and trunk roads

INTERIM ADVICE NOTE 93/07 DRIVER LOCATION SIGNS INTERIM PERFORMANCE SPECIFICATION

Report to Cabinet. 18 May 2016

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations

London Safety Camera Partnership

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Foreword. Getting to the heart of smart Road user experiences of smart motorways

A34 Safety Review. Project Summary

Guide to travelling to and around Panmure April 2013

AT403.1 Ancient monument Note 3 amended P500 Basic triangle New size 1800mm added

Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7.

London s Bus Priority

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

Solution to the problem of traffic congestion around Newport

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3.

Roads and public rights of way

Smart motorways all lane running GD04 assessment report

Park & Ride Implications for TRICS Users. TRICS UGM, June 2009

Managed Motorway Compliance Support. Hard Shoulder Abuse Final Report. December 2012

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Transcription:

Upgrade to smart motorway Junctions 3 to 12 Information exhibitions July 2018

About smart motorways Smart motorways are a technology All lane running driven approach to the use of our motorways, increasing capacity and relieving congestion while maintaining safety. Smart motorways help make journey times more reliable, at less cost than traditional widening schemes, meaning better value for the tax payer. The hard shoulder will be permanently converted into a traffi c lane. Drivers should obey all signs, including speed limits and lane closure instructions and should not stop on the motorway except in an emergency. Emergency areas traffic monitoring radar detector message signs emergency areas new gantries new signals new CCTV cameras Key features of a smart motorway There will be highly visible include: emergency areas. Variable mandatory speed limits Speed limits will be set to smooth traffi c fl ows. The limits will be clearly displayed on overhead gantries and roadside signs. Signs will be used to inform drivers of conditions on the There will be an emergency telephone in each emergency area. This will connect you to Highways England s Regional Control Centres and will pinpoint your location. concrete barriers under carriageway ducts technology ducting signs speed limit enforcement camera lower noise surfacing network and when variable speed limits are in place. It is important for drivers to understand the different types of technology and features used on smart motorways

junctions 3 to 12 Key changes to the motorway The is the main strategic route All lane running Bridge works between London, the west of England and Wales. It connects people, communities and businesses, carrying on average 130,000 vehicles per day and is prone to congestion. Highways England will be improving the between junction 3 at Hayes and junction 12 at Theale by upgrading it to a smart motorway. This means there will be: An additional lane for traffi c increasing capacity to reduce congestion. More technology on the road to smooth fl ows and manage incidents. More reliable journeys. The junctions 3 to 12 project has received planning permission through the Development Consent Order (DCO) process. Following a statutory consultation, it was granted consent in September 2016. Since then we have been working on detailed design and Between junctions 3 and 12 the hard shoulder will be converted to a traffi c lane, so that there are four lanes available for use by road users. Between junctions 4 and 4b, there will be fi ve lanes. Where a hard shoulder does not currently exist, the motorway will be adapted to create a minimum of four lanes. The barrier in the central reservation will be replaced by a new concrete barrier. Through junction running This enables a consistent number of lanes to pass through the junction, reducing the need to change lane for vehicles staying on the motorway. Through-junction running will be in place at junctions 4, 5, 6, 7, 8/9 and 11 and at the Reading motorway service area. To accommodate the new smart motorway: 11 bridges carrying local traffi c over the motorway will need demolition and replacement. 4 bridges that carry the motorway over roads, railways and rivers will need widening. 2 subways under the motorway will also need lengthening. Emergency areas There will be new high visibility emergency areas between junctions 3 and 12. Places of relative safety will be every 1.12 miles on average and no more than 1.6 miles apart. If you are driving at 60mph you will pass one approximately once a minute. planning construction. Work on the motorway will start in summer 2018 and is expected to be completed in spring 2022.

When will the work start? This is the longest smart motorway project in England to date (51km, 32 miles). To minimise disruption to our customers we will need to work on different stages at different times. Our current intention for the phasing of construction, is to start at junctions 8 to 9 and progress west towards junction 10. In tandem we will start work on four bridges between junctions 8 to 9 and junction 7. The more complex section of the scheme, progressing east from junctions 8 to 9 towards junction 3, will be started in May 2019. 11 12 12 Theale 4 lane smart motorway 5 lane smart motorway Through junction running No through junction running Reading 11 A3290 A33 A33 Twyford 10 Wokingham A404 Maidenhead A308(M) A404(M) 8/9 A329(M) Bracknell A332 6 7 0 Slough Windsor Egham M3 5 M25 A40 M25 A308 M25 A40 Hillingdon Hayes 4b 4 3 Heathrow Airport A30 Feltham M3 Weybridge Southall A308 A4 A316 A40 Hounslow Ealing N A406 London Surbiton Camberley A3 A243 GFD18_0125 Crown copyright and database rights 2018 OS 100030649 Motorway Link J12-11 J11-10 J10-8/9 J8/9-6 J6-5 J5-4b J4b - 3 Start May 20 May 20 Sept 18 May 19 1 Dec 19 Oct 19 Jan 20 Finish Feb 22 Jan 22 May 20 Dec 21 Mar 22 Mar 22 Mar 22 Notes: 1. Mobilisation work to 4 structures in junctions 8/9-7 link will also start in late autumn 2018. Timetable subject to governance, funding approval and discharge of the DCO. Progress updates will be provided on the Highways England website throughout the delivery.

What to do if you break down Safety, red sign and incidents If you need to stop in an emergency on a smart motorway: Use an emergency area and the emergency telephone. If you can, leave the motorway at a motorway service area, or the next junction. If you have to stop in a live lane: Put your hazard warning lights on to help other drivers see you and help our control room staff spot you on CCTV. If you are in the left hand lane and it is safe to do so, exit the vehicle via the left hand door. Wait behind the barrier if possible. If you cannot exit the vehicle, do not feel it is safe to do so or there is no other place of relative safety, remain in the vehicle. Keep your seat belt on and dial 999. We use a red symbol to show that a lane is closed because of an incident or people working on the road: This provides access for emergency services. You will see red symbols on a gantry sign over the motorway or on a gantry sign at the side of the motorway. Driving in a lane with a red symbol is dangerous and drivers must not use it. Incident management is controlled by teams in our control centres: Incidents will be detected by traffi c sensors, CCTV or calls from the public. The control centre will set signs to protect incidents and clear an access route for emergency vehicles. Control centre staff will monitor traffi c conditions throughout each incident, ensure signs are set to manage traffi c, and will reopen lanes as soon as it is safe to do so. As soon as Highways England is alerted, our Regional Control Centre will close lanes to protect you and your vehicle until help arrives.

Considerate construction We will need to set up a number of construction compounds along the. During construction, narrow lanes and reduced speed restrictions will be put in place to create a smooth and safe fl ow of traffi c through the works and to protect workers. Additionally, traffi c management barriers will be needed. Three narrow lanes will be available for road users during peak hours. Wherever possible, noisier works will be undertaken during daytime hours to reduce disturbance. Core working hours will be from 08:00 to 19:00 on weekdays (excluding bank holidays) and from 07:00 to 16:00 on Saturdays. There will be temporary closures of the carriageway and slip roads at night on some occasions. In these instances the closure will be advertised, and advance warning signs and clearly signed diversions will be put in place. Bridge works Much of the was originally built as a two-lane dual carriageway, and has been upgraded over the years. Eleven bridges over the motorway need to be replaced to make room for a new lane where there is no existing hard shoulder. To limit local disruption, new bridges will be built next to the existing ones, before the old one is demolished. However, where there is not enough space for this, some bridges will be demolished fi rst, then a new bridge built in the same place. Where the motorway passes over, for example, the River Thames at Bray and the railway line to Windsor, we will need to widen structures to support the new smart motorway. Some weekend closures will be required for bridge works. Full details will be communicated and posted on our web page well in advance. Find out more You can fi nd out more about the plans for junctions 3 to 12 at these exhibitions. Highways England and the design and construction teams will be available to discuss the scheme and answer your questions. Drop by to meet the team* Venue Date Time Holyport War Memorial Hall, Holyport, Maidenhead. SL6 2NA Sindlesham Court, Sindlesham, Wokingham. RG41 5EA Dorney Village Hall, Dorney Reach, Maidenhead. SL6 0DS Theale Village Hall, Theale, Reading. RG7 5AS The Nicholsons Centre, Nicholsons Lane, Maidenhead. SL6 1LB The Oracle Shopping Centre, Reading. RG1 2AG Our contact details Phone: 0300 123 5000 Email: J3to12SmartMotorways@ highwaysengland.co.uk Saturday 07/07/2018 Wednesday 11/07/2018 Thursday 12/07/2018 Friday 13/07/2018 Monday 16/07/2018 Thursday 19/07/2018 Mailing Address: J3-12 Smart Motorway Highways England 5 St Philip s Place Birmingham B3 2PW 10:00-13:00 15:00-20:00 14:00-19:00 15:00-20:00 14:00-19:00 09:00-20:00 *July 2018 exhibitions are taking place around junctions 7 to 12 where construction on this scheme will start. Further engagement will take place around junctions 3 to 7 in due course. Project web page: www.highwaysengland.co.uk/ m4j3to12

If you need help accessing this or any other Highways England information, please call 0300 123 5000 and we will help you. Crown copyright 2018. You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/ write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email psi@nationalarchives.gsi.gov.uk. This document is also available on our website at www.highwaysengland.co.uk If you have any enquiries about this publication email info@highwaysengland.co.uk or call 0300 123 5000*. Please quote the Highways England publications code PR30/18. Highways England creative job number GFD18_0125. *Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fi xed line or payphone. Calls may be recorded or monitored. Printed on paper from well-managed forests and other controlled sources. Registered offi ce Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 Visit us online at www.gov.uk/government/collections/ smart-motorways