ASSET ASSET IDENTIFICATION SIGNAGE

Similar documents
SECTION 12 ROAD MARKINGS AND DELINEATION

CONSTRUCTION SPECIFICATION

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2

SECTION 12 ROAD MARKINGS AND DELINEATION

Railroad Inspection Procedure Manual

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew

Access requests to County streets and roadways are processed through one of the following methods:

Appendix C. Bicycle Route Signage

A5.1 Permitted activities

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

Work Zone Traffic Safety

GUIDELINE: Roadside Worksites

(This page left intentionally blank)

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

land transport road assets

Driveway Design Criteria

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:

guide to a phased approach TRIPP

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY

T A B L E OF C O N T E N T S

land transport road assets

(HIGHWAY GEOMETRIC DESIGN -1)

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

CHAPTER 1 STANDARD PRACTICES

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

B741 - TEMPORARY CONCRETE BARRIERS - OPSS 741

FIRE & LIFE SAFETY STANDARD

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

MUNICIPALITY OF ANCHORAGE Traffic Department MEMORANDUM

SECTION 5 DELINEATION AND HAZARD MARKERS

VISUAL AIDS FOR DENOTING OBSTACLES

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

General References Definitions. (1) Design Guidance. (2) Supporting Information

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS

DRAFT OPERATIONAL RESPONSIBILITY FOR PUBLIC ROADS IN WESTERN AUSTRALIA DRAFT VERSION 2

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

STATEMENT of POLICY and PROCEDURE

KERBWAY CONTENTS. Note: AutoCAD.dwg files, K1 to F1, may be downloaded from maxq.com.au.

2C-3 Placement of Warning Signs

PART 2. SIGNS Chapter 2N. EMERGENCY MANAGEMENT SIGNING

TRAFFIC ACCOMMODATION IN WORK AREAS

TGSI Tactile Ground Surface Indicators

INDEX. Geometric Design Guide for Canadian Roads INDEX

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

APPENDIX B1. CROSS-REFERENCE GUIDE TO THE OHIO REVISED CODE

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

10.0 CURB EXTENSIONS GUIDELINE

Roadway Design Manual

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

Errata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

Geometric designs for Safe Highways. Dr. Manoj M. Asst. Professor Department of Civil Engineering IIT Delhi

Review of Guidelines for Cycleway Safety Fencing

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Chapter 8 (2009) - Summary of key changes

Traffic Management Guidelines for Structure Rehabilitation Projects

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

Shared Use Path Design

DATABASE HEALTH INDEX - DASHBOARD

MUTCD Part 6: Temporary Traffic Control

Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book

TECHNICAL BULLETIN Ministry of Transportation

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Off-Road Facilities Part 1: Shared Use Path Design

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

California Manual on Uniform Traffic Control Devices

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION TRAFFIC REGULATIONS

Appendix F: Wayfinding Protocol and Best Practices

Topic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY

Shortening or omitting a pedestrian change interval when transitioning into preemption

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

South Carolina Department of Transportation. Engineering Directive

Signs. signs, signals and road markings. in this chapter

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

Auckland Transport Code of Practice 2013

TILLAMOOK COUNTY PUBLIC WORKS DEPARTMENT 503 Marolf Loop, Tillamook, OR (503) TDD-NONVOICE

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Sharrow Markings. Best Practice Guidance Note. February 2016

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation

Transcription:

PART PART E E: ASSET ASSET IDENTIFICATION SIGNAGE Manual No. SM051 E-1

7 ASSET IDENTIFICATION SIGN DESIGN AND PLACEMENT General The location referencing system does not include asset identification. However, asset identification is critical for maintenance personnel and for the overweight permit system. Therefore, this chapter specifies the two types of asset identification signs along with their purpose, numbering and placement. In this Chapter The topics in this chapter are listed below: Topic Page General Specification E - 3 BIS Structure Number Signs Details E - 4 Typical Placement of BIS Structure Numbers E - 5 Small Culvert Marker Sign Details E - 6 Typical Placement of Small Culvert Marker E - 7 Manual No. SM051 E-2

7.1 General Specification Introduction The specific details of the asset identification signs and there placement are given in the following sections however, for general information on: Lettering Colouring and Safety see Section 3.1 General Specifications Manual No. SM051 E-3

7.2 Bridge Information System (BIS) Structure Number Sign Details Sign Text a b c d AI-BIS-B 50 C 75 C 325 300 100 25 AI-BIS-C 50 C 75 C 325 300 100 25 AI-BIS-T 50 C 75 C 325 300 100 25 AI-BIS-B Bridge Purpose: Displaying the Bridge Information System (BIS) structure number is primarily to ensure the identification of the bridge, large culverts and tunnels so they can be clearly matched to the overweight permits. Numbering: Bridges, large culverts and tunnels are to be given a unique Structure Number based on the approximate displacement, to the nearest 100m, from the RS (RAPID Approach). AI-BIS-C Culvert For example: RS 232 + 8.24km = Bridge 2402 RS 232 + 11.56km = Bridge 2436 RS 262 + 11.52km = Bridge 2735 The same structure number shall be recorded in the bridge structural inventory and on route data sheets.. Location: BIS structure number signs are located at each end of all bridges maintained by Transit New Zealand. Sign: BIS structure number sign plates and posts shall comply with the physical requirements of the materials specification in the Road Safety Manufacturers Association Standard for the Manufacture and Maintenance of Traffic Signs. An acceptable solution would be: AI-BIS-T Tunnel 2.5mm thick grade NS4 (5251-H34) aluminium, Powder coated (non-reflective), and fitted to a 100x100 Class H4 treated timber post, primed and finished with high gloss white paint. These signs are single sided. Manual No. SM051 E-4

7.3 Typical Placement of BIS Structure Numbers Bridge and Large Culvert Placement: Mounting shall be on the left-hand side of the roadway as viewed by approaching traffic, with the sign at right angles to the road centreline. The sign shall be located on the post supporting the bridge or large culvert name sign (if there is one), on the bridge end post, or on a post of its own, in that order of precedence. The sign shall be within 5 metres of the end of the bridge or culvert barrier and outside of the window shown in Figure 7.1 Bridge Signage Envelope. The upper edge of the sign shall not be above 800 mm above the ground within 5.5 metres of the bridge centreline to allow clearance for overweight and over dimension vehicles.. Figure 7.1 Bridge Signage Envelope Tunnel Placement: Mounting shall be on the left-hand side of the roadway as viewed by approaching traffic, with the sign at right angles to the road centreline. The sign shall be located on the outside wall of the tunnel or a post immediately before it in that preference order. The upper edge of the sign shall not higher than 800 mm above the ground. Manual No. SM051 E-5

7.4 Small Culvert Marker Sign Details Sign Text Width Height AI-SC > 75 C 50-100 500-900 Purpose: Culverts are marked so that maintenance personnel can readily locate them. The culverts which are to be marked and recorded are those which transport stormwater or natural water from a normal water course from one side of the highway to the other. They do not include the urban drainage system, such as pipes leading from sumps to collector systems. The maintenance of those is a local authority responsibility and there is no need for these to be included in the Transit New Zealand culvert inventory. Numbering: Culverts shall be numbered consecutively between reference stations. Additional culverts placed later shall be decimalised, e.g. 6.1, 6.2, etc. AI-SC For aesthetic reasons in urban kerbed situations the number need not be painted on the kerb. Instead the exact location and the number of the culvert shall be recorded so that it can be included in the State Highway culvert inventory in the RAMM system. Although culverts under those circumstances need not have their number painted on the road they will have to be numbered in the inventory system. Hence the number of culverts needs to be taken into account to ensure that the correct number is shown on culvert markers once clear of the kerbed situation. Post: Posts shall meet the material requirements specified in Transit New Zealand specification M/14. Wooden posts shall meet the dimensional requirements in Transit New Zealand specification M/14 with the exception of the length, which shall be, such that the post when firmly installed is not less than 500mm or more than 900mm above existing ground level. Non-wooden posts shall have a uniform width dimension of between 50mm and 100mm and the length requirement shall be as for the wooden posts. Post Colour: Culvert marker posts need not be painted but when painted a single colour is preferred. The colour shall be chosen to ensure that the culvert marker cannot be mistaken for an edge marker post. Vivid colours shall be avoided and not reflector is to be attached. Manual No. SM051 E-6

7.5 Typical Placement of Small Culvert Marker Small Culvert Marker Placement: Culvert marker posts are placed above each culvert on the true left side of the carriageway. Facing the direction of increasing route distance. In exceptional circumstances where it is not possible to install or maintain a culvert marker post an alternative method of marking may be submitted to the Transit New Zealand Regional Office for approval. Culvert marker posts shall not be closer to the edge of the trafficable highway than edge marker posts and wherever possible shall be placed at that end of the culvert in such a way to be readily seen from a vehicle. Where a culvert runs at an acute angle to the centre line of the highway an additional culvert marker post may be used on the opposite side of the highway to indicate the general line of the culvert. In urban kerbed situations it is not practical to install and maintain culvert marker posts. In such cases a culvert may be marked with a 50-mm wide 200 mm long painted line on the top and face of the kerb. Manual No. SM051 E-7

This page intentionally blank Manual No. SM051 E-8