Pressure Vessel Program

Similar documents
SOP #: Pressure Vessels

Procedure: Pressure equipment safety

PRESSURE SYSTEMS POLICY

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

STS 650 PRESSURE EQUIPMENT

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Hazardous Energy Control

PRESSURE RELIEF DEVICES. Table of Contents

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

29 SERIES - SAFETY VALVE

Cal Poly Eye Wash and Safety Shower Inspection Program June 20, 2018

Approved Code of Practice for. Pressure Equipment. (Excluding Boilers)

Standard Pneumatic Test Procedure Requirements for Piping Systems

Pressure Relief Device Investigation Testing Lessons Learned

PURPOSE OF THE POLICY

Event Time Event Name Meeting Room Sunday, January Monday, January

SERIES SAFETY VALVE

1. The Middletown Public Schools will have defibrillators in each school building.

Australian/New Zealand Standard

MSC Guidelines for Pressure Vessels

GAS SAFETY Information Bulletin

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

MSC Guidelines for Compressed Air Systems

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

AED Program 2017 January 2017

PIP PNE00012 Piping Examination and Leak Test Guide

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

Environmental Health & Safety Policy & Procedure #35

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

September 2018 Pressure Test

RUPTURE HAZARD OF PRESSURE VESSELS

High-Pressure Boiler Inspection Procedures: A Complete Checklist

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

v. Size shall be specified on drawings.

THE PRESSURE NEWS GASKET FAILURE DURING HYDROSTATIC TEST IN THIS ISSUE: OVERPRESSURE PROTECTION FOR FIRE PROTECTION SYSTEMS SPRINKLER TANKS

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

Hazard Communication Program

Hazard Communication Program

ASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Standards of Practice Emergency Shower/Eyewash Installation, Use, Testing & Maintenance

RESPIRABLE CRYSTALLINE SILICA PROGRAM July 2018

Guidelines for Pressure Boundary Bolted Flange Joint Assembly

Firearms Record Keeping Policy

Lock Out/Tag Out Control of Hazardous Energy

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Standards of Practice Personal Protective Equipment

ES&H Manual Pressure and Vacuum Systems Safety Supplement

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS

Ammonia Purge Near Miss. Jason Clarke, Gulf Power Co.

University of Cincinnati. Radiation Safety Committee Operations Guidelines Statement of Policy (RSC Guidelines) RSC Guidelines (revision 5)

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

York Adams USBC Association Operations Manual Page 8-1

Title: Hazard Communication Right to Know Program Effective Date: 5/88 Revision: 12/14 Number of Pages: 7

EVT * -Pro Electronic Valve Tester

Pressure Vessel Design

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Title: Benzene Awareness Effective Date: 11/14/2014 Control Number: THG_0037 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

Emergency Response Policy

Emergency Eyewash & Shower Testing Program

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER EL PASO

Model C Pipe Line Strainer 6, 8 & 10 Inch (DN150, DN200 & DN250) 250 psi (17,2) General Description. Technical Data. Page of 6 MAY, 2006 TFP1644

OPERATING PROCEDURES

ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah

RULES PUBLICATION NO. 119/P

Sample Lockout/Tagout Policy

Dow s New Practice for Locating Temporary Portable Buildings. P. Partridge 9/29/05 UNRESTRICTED - May be shared with anyone Slide 1

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp.

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Transport of gas tanks for motor vehicles

LOCKOUT/TAGOUT PLAN August 2015

Control of Hazardous Energy Lockout / Tagout Program

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

LOCKOUT SYSTEM AND POLICIES

HAZARD COMMUNICATION PROGRAM

RELIEF VALVES IN PARALLEL

SAFETY AUDITS: WHAT TO LOOK FOR TO ENSURE YOUR BUILDING IS REALLY SAFE. Presented by:

Compressed Gases and Cryogens

Lockout/Tagout - Control of Hazardous Energy Program

UNIFIED FACILITIES CRITERIA (UFC)

Written Programs Listing

UNIFIED FACILITIES CRITERIA (UFC) CANCELLED OPERATIONS AND MAINTENANCE: INSPECTION AND CERTIFICATION OF BOILERS AND UNFIRED PRESSURE VESSELS

CSU Channel Islands Lead Operations and Maintenance Program

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

UNIFIED FACILITIES CRITERIA (UFC) CANCELLED OPERATIONS AND MAINTENANCE: INSPECTION AND CERTIFICATION OF BOILERS AND UNFIRED PRESSURE VESSELS

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

DEPOT LEVEL MAINTENANCE OF THE PROPELLANT HANDLERS ENSEMBLE


RiskTopics. Lockout/Tagout October 2017

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Gettysburg College. Energy Control Program

Effective Date: 24-April-2017 Version: 6 Page: 1 of 8 TITLE: SAF-370, PERSONAL PROTECTIVE EQUIPMENT GUIDELINES. Table of Contents

BCGA GUIDANCE NOTE 17

ASSE International Product (Seal) Listing Program

Transcription:

Pressure Vessel Program 1. PURPOSE 1.1 This program provides guidance to University employees that work with or are responsible for pressure vessels. Conformance to this Program aids the University in ensuring that pressure vessels are properly registered, routinely inspected and do not present a hazard. This procedure also helps ensure an up to date inventory of pressure vessels at University facilities. 2. SCOPE 2.1 This procedure applies to all University owned property (including off site properties) that utilize pressure vessels. It does not include residential style water heaters less than 50 gallons in size. 2.1.1 The pressure vessel procedure is not intended to identify means and methods for maintenance, inspection, or testing by University personnel. This service is provided by the University s property carrier and outside contractors. 3. DEFINITIONS 3.1 Pressure Vessel - A container larger than 5 gallons designed to hold liquid or gas at pressure above 15 psi or temperatures above 210 degrees F. 3.2 Valve, Pressure-Temperature Relief An automatic relief device actuated the static pressure upstream of the valve or by the temperature of the fluid. Primary maximum temperature setting is 210 degrees F. 4. RESPONSIBILITIES 4.1 The Facilities Design and Operations Department (FDO) shall be responsible to manage the maintenance and repair of pressure vessels. FDO shall manage the pressure vessels per the requirements set forth in the ASME Boiler and Pressure Vessel Code (BPVC) and FM Global DS 12-1. 4.1.1 FDO shall direct the contract for jurisdictional pressure Page 1 of 6

vessel inspection and testing with the University s property carrier (FM Global). FDO shall also direct the pressure vessel preventive maintenance program with a certified contractor. The contractor shall be directed to utilize ASME BPVC standards along with FM Global DS 12-1 standards. 4.1.2 FDO shall maintain the list of all University pressure vessels and modify (add to/subtract from) accordingly. 4.1.3 FDO shall work directly with the University s property carrier to ensure compliance with insurance requirements. 4.1.4 FDO shall manage the state boiler pressure vessel program including pressure vessel registrations, data maintenance and fees. 4.1.5 FDO shall serve as the University s technical representative for pressure vessels with regulatory agencies. 4.1.6 FDO shall develop and or maintain a pressure vessel data management program to track pressure vessels meeting the criteria of the program. The pressure vessel data management program shall be used to ensure that the pressure vessels are properly tracked, managed, inspected and maintained. 4.2 Maintenance Department 4.2.1 Shall provide day to day management of the pressure vessel program. 4.2.1 Shall maintain all records include pressure vessel inventory, State inspection forms, notifications and etc. 4.2.2 Shall schedule all inspections with property carrier. 4.2.3 Shall schedule, order and approve maintenance work with the outside Contractor. 4.2.4 Shall submit payment for the state registration fee. 4.2.5 Shall review the outside contractor s contract on an annual basis. 4.2.6 Shall ensure that new pressure vessels are properly registered. 4.2.7 Shall notify RMS of changes to procedures, contracts or inventory on a semi-annual basis. 4.3 The Risk Management & Safety Department shall: 4.3.1 Update the pressure vessel program as necessary. Page 2 of 6

4.3.2 Audit the program to determine the effectiveness of the pressure vessel procedure. 4.3.3 Facilitate communication of FDO and the University s insurance carrier. 4.3.4 Notify FDO upon the identification of unregistered or unplated pressure vessels found during inspections or surveys. 4.3.5 Work with Procurement Services to ensure that FDO is notified when pressure vessels are purchased. 4.4 Departments with pressure vessels 4.1.1 Shall notify Procurement Services when they wish to obtain a pressure vessel. See Appendix A. 4.4.1 Shall not create or build their own pressure vessel, nor contract directly for the construction of a pressure vessel without Procurement Services knowledge and FDO approval. 4.4.2 Shall notify FDO of pressure vessels in their lab, facility, building or department utilizing the google doc pressure vessel compliance checklist Appendix B. 5. GENERAL REQUIREMENTS OF PRESSURE VESSELS 5.1 Pressure vessel inspections are provided by the University s Property Carrier based on ASME and FM Global pressure vessel standards. 5.2 FDO maintains a contract with a certified contractor to provide repair, maintenance and testing services on pressure vessels owned by the University. These services are not provided by University personnel. Maintenance staff shall not exercise safety valves. 5.3 If your department owns a pressure vessel, you shall contact FDO every three years for routine maintenance. 5.4 Power Plant safety valves for unfired pressure vessels are replaced by Plant personnel every five years (per FM Global DS 12-1). The procedure is maintained at the Power Plant. 5.5 Power Plant safety valves for fired pressure vessels are removed Page 3 of 6

every three years (per FM Global DS 12-1) and provided to an outside contractor for recertification. This procedure is maintained by the Power Plant. 6. RECORD KEEPING 6.1 The Maintenance Department shall be maintain all records related to the identification, tracking, maintenance, service, registration, and inspection of pressure vessels. 6.2 RMS shall maintain all records related to program audits. 7. AUDIT AND REVIEW 7.1 On an annual basis, RMS will conduct an audit of the Pressure Vessel Program to determine compliance with and effectiveness of the program. This will be a paperwork review. 8. RESOURCES 8.1 American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (BPVC); Sections I, IV, VI, VII, X, XII, CSD-1and PCC-2. 8.2 FM Global Data Sheet DS 12-1 8.3 OSHA STD 01-10-001 Page 4 of 6

PRESSURE VESSELS APPENDIX A 1. A department, laboratory, principal investigator or facility may identify a need for, or a desire to obtain a pressure vessel, or may find one in a space. Should that occur, the following steps shall be taken. 1.1 Finding a pressure vessel. 1.1.1 Contact the Maintenance Department to ensure that the pressure vessel is listed on the Maintenance Department inventory. 1.1.2 The Maintenance Department shall determine the status of the vessel and if any additional inspection or testing is warranted. 1.2 Obtaining a pressure vessel. 1.2.1 Pressure vessels may not be fabricated (onsite or offsite) unless the work is performed by a qualified contractor with plans properly stamped by a professional engineer licensed to practice in the State of Indiana and meeting the ASME standard requirements. 1.2.2 Contact the maintenance coordinator for your building to discuss the application and obtain their input. 1.2.3. Should the vessel be available for purchase from a supplier, an order shall be placed with Procurement Services. The pressure vessel shall meet the design requirements set forth by the ASME Boiler and Pressure Vessel Code (BPVC). 1.2.5 Should the vessel require custom fabrication, the request shall be submitted through the University s AIM system. 1.2.5 Installation of the pressure vessel shall be performed by a contractor licensed for that type of work. 1.2.6 When the vessel has been installed and prior to use, the responsible party shall inform the Maintenance Department and the vessel shall be placed on the University s pressure vessel list and schedule for routine inspection. 1.2.7 Approvals for the purchase of pressure vessels or the approval for the building of a pressure vessel shall be made by the Maintenance Department. Page 5 of 6

Page 6 of 6