MA MARINE ACCIDENT INVESTIGATION REPORT

Similar documents
MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT

Unit 18 LEAVING THE DOCK

MARINE ACCIDENT INVESTIGATION REPORT

Class B Accident Report. Melilla 201 Man Overboard

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT

M/V SE CERULEAN 9V9934

MARINE ACCIDENT INVESTIGATION REPORT

Anchor and Anchor Cable Losses. Athens, Greece, 2 nd February 2018 Capt. Simon Rapley

OSAKA MARTIS USER MANUAL TABLE OF CONTENTS

Function: Navigation at the support level

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT

Injury during mooring operation

Simplified report of safety investigation

KANMON KAIKYO VESSEL TRAFFIC SERVICE CENTER KANMON MARTIS USER MANUAL TABLE OF CONTENTS Ⅱ OPERATIONAL CONCEPT OF THE "KANMON MARTIS" 1

Seamanship. A braided line comprises a core of braided or stranded threads covered with a sheath. The center or core of the line gives strength.

Japan Transport Safety Board

Roles: Presentation Questions:

NAUTICAL TERMINOLOGY

Cargo and hull damage while at anchor in heavy weather

AA AIRCRAFT ACCIDENT INVESTIGATION REPORT. Setouchi SEAPLANES Inc. J A 0 2 T G

Mooring and unmooring

Sailing Instructions. International Dragon Class Edinburgh Cup Friday 29 June - Saturday 7 July Racing Tuesday 3 - Friday 6 July

National Transportation Safety Board

NAVIGATION AND SEAMANSHIP Secure vessel at mooring, anchor, and berth

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS

Appendix 11-B Anchor Handling Systems, Set Up and Handling

Summary Report. Grounding Twofold Bay. 20 July 2006

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener

TERMAP S.A. Terminales Marítimas Patagónicas Sociedad Anónima

National Maritime Center

MARINE ACCIDENT INVESTIGATION REPORT

National Maritime Center

Chapter 2. Before You Get Underway. Copyright Coast Guard Auxiliary Association, Inc.

AIRCRAFT ACCIDENT INVESTIGATION REPORT

ROUND-THE-SOUND RACE July 21, 2018

RESULTS FROM PARACHUTE SEA ANCHOR DRAG TESTS FOR A SPACE CAPSULE, Jan. 10, 2013

2 NOTICES TO COMPETITORS Notices to competitors will be posted on the official notice board of the host club and/or their websites.

National Maritime Center

VESSEL EQUIPMENT LIST CLASS 1E

Sailing Instructions

C C S Technical Information

IMO ANCHORING, MOORING AND TOWING EQUIPMENT. Submitted by the Republic of Korea

National Maritime Center

MA MARINE ACCIDENT INVESTIGATION REPORT

GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE

Mentoring in the USCG Auxiliary Boat Crew Program Coxswain Mentoring Template

SAFETY INVESTIGATION REPORT

National Maritime Center

Colvic Watson 28 "Lady Rachel"

Accident Report. Failure of No. 2 Crane Tasman Mariner. 20 September 2005 Class B

Stevpris installation

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container

A1.1.5 It is assumed that under normal circumstances a ship uses only one bow anchor and chain cable at a time.

SAFETY BULLETIN. SB1/2015 July 2015 M A RINE A C C I DENT INVES TIG A T ION BR A NCH. Figure 1: Zarga alongside South Hook LNG terminal

INTERIM REPORT INTO THE FATAL INCIDENT ON-BOARD FV CU NA MARA APPROXIMATELY 130 NAUTICAL MILES WEST OF SLEA HEAD ON 30th JUNE 2016.

Rule 26 - Fishing vessels

Iate Clube do Rio de Janeiro

Deckhand Crew. Deckhand Crew Responsibilities

OPERATIONAL CHECK LIST

BoatWasher Swede, , MS Float

This guidance is based on the Risk Assessment approved by the Management Committee under the Club s Health & Safety Policy.

THE MOORING OF OIL CARRIERS AT SINGLE POINT MOORINGS

Competency Framework for Advanced Deckhand-Fishing. Competency Framework for Advanced Deckhand-Fishing

SS&S Chapter 8 Instructor Guide

How to Operate the MYC Support Boats and Equipment

Jeanneau Sun Odyssey 39 DS. Price: 89,995

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

National Maritime Center

Pilotage Directions 2017

Barge Dutch Barge. Medway United Kingdom. 125,000 inc Vat. Spits barge for sale

THE COMMONWEALTH OF THE BAHAMAS. M.v. Skandi Skansen IMO Number: Official Number:

Intermediate Cruising Standard (ASA 104)

ROUND-THE-ISLAND RACE July 21, 2018

X-03 EMERGENCY TOWING ARRANGEMENTS

Balmain Sailing Club Friday Twilight Series Sailing Instructions. Yachts & Dinghies

Class B Accident Report. Legacy Grounding

National Transportation Safety Board

Accident Report. San Constanzo Flooding approximately 35 miles east of Gisborne on 18 January 2004

Notes on Wire Landings Along Hamakua Coast on the Island of Hawaii

Accident Report. Para 1 & Lightning One Collision on Lake Wakatipu on 14 July 2004

Interim Investigation Report pertaining to the investigation report 71/17. Very Serious Marine Casualty

National Maritime Center

NOTICE TO SHIPPING #1 NIAGARA REGION WELLAND CANAL GENERAL INSTRUCTIONS 1. HOLDING POSITION - 'HEAD OF THE LOCK'

Standard Operating Procedure

Mooring Balls Explained A checklist for a secure mooring

Place a rope coil here

CR 914 Class Rules. Revised July 15, 2000 See also CR-914 Class Rule Interpretations

LHYC Safety Boat Instructions

Adams 10 Metre Class 2019 Australian Championship. 25, 26, 27 & 28 January 2019

Transcription:

MA2013-4 MARINE ACCIDENT INVESTIGATION REPORT April 26, 2013

The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan Transport Safety Board is to determine the causes of an accident and damage incidental to such an accident, thereby preventing future accidents and reducing damage. It is not the purpose of the investigation to apportion blame or liability. Norihiro Goto Chairman, Japan Transport Safety Board Note: This report is a translation of the Japanese original investigation report. The text in Japanese shall prevail in the interpretation of the report.

MARINE ACCIDENT INVESTIGATION REPORT March 7, 2013 Adopted by the Japan Transport Safety Board Member Tetsuo Yokoyama Member Kuniaki Shoji Member Mina Nemoto Accident Type Injury of crew members Date and Time At around 1700 hours (local time, UTC+9 hours) on November 15, 2011. Location Process and Progress of the Investigation Factual Information Vessel type and name, Gross Tonnage, Vessel number, Owner, etc. L B D, Hull material, Engine, Output, Date of launch, etc. Crew Information In the northwestern waters of Tsunoshima, Shimonoseki City, Yamaguchi Prefecture, Japan. At around 312 true bearing, 10.2 nautical miles from Tsunoshima Light House (Approximately 34 28.1 N., 130 41.3 E.) (1) Set up of the Accident Investigation The Japan Transport Safety Board appointed an investigator-in-charge from Moji Office and one other investigator to investigate this accident on November 16, 2011. (2) Comments from parties relevant to the cause of accident Comments on the draft report were invited from parties relevant to the cause of the accident. (3) Comments from the flag State Comments on the draft report were invited from the flag State of a cargo ship, CABRERA. A Cargo ship CABRERA (registered in Republic of Malta), 24,210 tons, 9537977 (IMO No.), CABRERA SHIPPING A/S (hereinafter referred to as Company A ) 180.000 m 29.986 m 14.700 m, Steel, Diesel engine, 7,500 kw, November 4, 2011 (Delivered) B Tugboat Harukaze, 178 tons, 136401, Harukaze Kaiun Co., Ltd. 39.22 m 9.80 m 4.90 m, Steel, Diesel engine 2 units, 2,942 kw (total), October 1997 A Master A (Chinese) Male, 39 years old Documentary proof of application for an endorsement under STCW regulation I/10 for master (issued by Republic of Malta) Date of issue: October 20, 2011 (Valid until January 19, 2012) Officer A (chief officer) (Chinese) Male, 39 years old Documentary proof of application for an endorsement under STCW regulation I/10 for officer (issued by Republic of Malta) Date of issue: October 20, 2011-1 -

Injuries to Persons Damage to the Vessels Events Leading to the Accident (Valid until January 19, 2012) Ordinary Seaman A 1 (Chinese) Male, 30 years old Ordinary Seaman A 2 (Chinese) Male, 24 years old B Master B Male, 35 years old Fifth grade maritime officer (navigation) Date of issue: May 29, 2000 Date of revalidation: May 19, 2010 Date of expiry: May 28, 2015 Officer B (Vessel B first officer) Male, 25 years old Third grade maritime officer (navigation) Date of issue: May 22, 2006 Date of revalidation: April 15, 2011 Date of expiry: May 21, 2016 A Serious injury; One person (the ordinary seaman A 1 ), Light injury; One person (the ordinary seaman A 2 ) B None A None B None Vessel A, manned by the master A, officer A, ordinary seaman A 1, ordinary seaman A 2 and 19 other crew members, was built in a shipbuilding yard in Nantong Port, Jiangsu Province, People s Republic of China and delivered to Company A on November 4, 2011, after which she was originally scheduled to bound for Commonwealth of Australia, but the destination was changed to Japan. Vessel A departed Nantong Port on the 11 th, and bounded for Fukuyama Port via Kanmon Strait. In order to adjust the time of entry at Fukuyama Port, Vessel A started drifting from about 2000 hours on the 12 th on the high seas in the northwestern waters of Tsunoshima with her bow heading almost east. At about 0100 hours on the 15 th, while Vessel A was staying adrift at approximately 34 45.2 N, 130 26.9 E, a rope of parachute type sea anchor of a fishing vessel engaged in squid fishing got entangled with her propellers and rudder, rendering her to be unable to sail. An arrangement was made for Vessel A to be towed by Vessel B, so she was waiting for Vessel B arranged by Company A to arrive while she continued to stay adrift with the patrol boats of Japan Coast Guard. As Vessel B arrived at about 1600 hours, the master A called Vessel B on VHF radio phone (16-channel) in order to discuss how to make fast the towing rope, but there was no response from Vessel B. The officer A, ordinary seaman A 1 and ordinary seaman A 2 as well as 6 other crew members were on standby on the forecastle deck of Vessel A to engage in the mooring operation of the towing rope. The master A decided to entrust the officer A with the discussion on the mooring operation of the towing rope with Vessel B. - 2 -

The numbers and designations of bollards mounted at the forecastle deck of Vessel A are as shown in the chart below Bollard Equipment and Designations, and their locations are as indicated in the figure below, Excerpt from Emergency Towing Equipment Manual. No. on Figure Number equipped Designations below are used in this report Emergency Towing 1 2 Bow bollard Bollards Mooring Bollard 2 1 Starboard bollard (starboard) Mooring Bollard (port) 3 1 Port bollard Bollard Equipment and Designations 3Port bollard Towing rope Bow mooring hole 1Bow bollards 2Starboard bollard Excerpt from Emergency Towing Equipment Manual Vessel A had a practice to use the bow bollard when being towed. Following the Emergency Towing Equipment Manual of Vessel A, the officer A intended to take the towing rope of Vessel B from the bow mooring hole (hereinafter referred to as bow hole ) and to moor it at the bow bollard, so he decided to lower a rope to pick up the towing rope (hereinafter referred to as pickup rope ) down onto Vessel B, tie 2 heaving lines of Vessel B with the pickup rope, and then tie the heaving lines with 2 pendant wires to bring them to the forecastle deck of Vessel A, so as to moor the pendant wire at the bow bollard. The entire mooring operation of the towing rope was conducted by tying each rope and wire in order as follows: Vessel A pickup rope heaving lines pendant wires buffer rope towing rope Vessel B - 3 -

(See Figure below Schematic of Towing Rope ) Heaving lines Pendant wires Buffer rope Towing wire Vessel A Vessel B Schematic of Towing Rope At about 1630 hours the crew of Vessel A lowered the edge of the pickup rope (one rope) down onto the stern of Vessel B. The eye- (ring-) shaped edge of the 2 heaving lines of Vessel B were tied with the pickup rope at the edges put together. The crew of Vessel A gave the pickup rope via the bow hole and the bow bollard in order and then hove it at the warping end of the starboard mooring winch. The Vessel A was instructed by the Vessel B that the 2 pendant wires were to be taken separately on the starboard side and port side, and thus they moored temporarily the eye of the first pendant wire which was sent earlier by using the rope stopper (hereinafter referred to as stopper ), brought up the second pendant wire and temporarily moored it at the bow metal ware by using the shackle, and then untied the pickup rope to separate the two heaving lines into one to be moored at the starboard side and the other at the port side. In order to moor the first pendant wire s eye at the starboard bollard, the Vessel A tried to wind the heaving line leading to the said wire with the warping end of the starboard mooring winch, but the stopper which was temporarily moored could not be separated from the pendant wire, and therefore they cut off the stopper apart with a saw and started to wind up the wire. Then the crew of Vessel A started to wind up the pickup rope tied with the heaving line of the second pendant wire with the warping end of the port mooring winch. When the pendant wire s eye being wound up with warping end of the starboard mooring winch came to a position to be moored at the bollard, but the eye s diameter was smaller than that of the bollard, so the Vessel A decided to pass the pendant wire around the bollard and to attach a shackle to the wire s eye. (See Figure next, Towing Rope Arrangement and Assumed Status of Pendant Wire Locking ) - 4 -

*Second pendant wire: Locked temporarily at metal wire (chain stopper) with a shackle Heaving line Pendant wire Bow hole Hatch Bow bollards Starboard mooring winch *First pendant wire: Moored temporarily at bollard with a stopper Windlass Port mooring winch Warping end Starboard bollard : indicates bollard Towing Rope Arrangement The heaving line and the pendant wire being wound with the warping end of the starboard mooring winch were in contact with the corner of the hatch located towards starboard bow of the forecastle deck. Starboard bollards Pendant wire Shackle Eye Assumed Status of Pendant Wire Locking The ordinary seaman A 1 was standing right side of the starboard bollard with a backup stopper to replace the cut-off stopper, and the ordinary seaman A 2 was standing about 1 m away from the bow, while they were taking the stopper to the starboard bollard in order to moor the pendant wire temporarily at the said starboard, when, at about 17 00 hours, the heaving line was broken, and the pendant wire hit the lower leg of the ordinary seaman A 1 and A 2, knocking both of them down screaming. (See following Photo Stopper, and Figures Example of Use of Stopper, and Location of the ordinary seaman A 1 and ordinary seaman A 2 at Time of Accident ) - 5 -

Stopper Bollard Example of Use of Stopper Stopper The ordinary seaman A 2 The ordinary seaman A 1 Location of the ordinary seaman A 1 and ordinary seaman A 2 at Time of Accident The crew of Vessel A who were engaged in the mooring operation of the towing rope at the forecastle deck heard the scream and ran to the ordinary seaman A 1 and ordinary seaman A 2, and the officer A reported to the master A about the accident and then the master A requested Japan Coast Guard for rescue. The crew working with the port mooring winch left the equipment so the pickup rope and heaving line that were being wound up with the port drum continued to be winched up as the eye of the pendant wire was temporarily moored at the metal ware since, so the heaving line was broken and fell onto the sea surface. Vessel B, manned by the master B and 4 other crew members, arrived at the drifting location of Vessel A at about 1555 hours. The master B received a call from the master A on VHF radio phone (16-channel) but he did not understand the language spoken, so he was maneuvering the bow of Vessel B heading southeast while keeping the oscillation caused by the waves to a minimum level so as to maintain the location near the bow of Vessel A. The towing rope of Vessel B consisted of a buffer rope connected with a shackle to a towing wire wound at the Vessel B drum, which is then shackled to the two pendant wires. (See Schematic of Towing Rope above) - 6 -

Weather and Sea Conditions The Vessel B normally required the heaving line to be given to the towed vessel to be tied with a pendant wire, and then, in order to reduce the centrifugal whirling of the towed vessel, to provide two pendant wires both to port and starboard to be passed through fairleads separately on the port and starboard sides at the bow section of the towed vessel to be moored at a port as well as starboard bollard. As the Vessel A was heaving two heaving lines from the bow hole, the officer B tried to give them an instruction with gestures; to separate the two heaving lines to port and starboard, heave them through fairleads on the port and starboard sides at the bow section separately, separate the two pendant wires to port and starboard and to moor them separately at the port bollard and starboard bollard on Vessel A, but the crew of Vessel A did not understand it. The workers of Vessel B floated the buffer rope on the seawater and coiled the two pendant wires on the stern deck, and then stayed away from the stern to stand by at the bow while watching the heaving line to be hove to the forecastle deck of Vessel A. As the two heaving lines of Vessel A were different in length, the eyes of the pendant wires tied to each heaving line were hove one at a time with time gap from the bow hole of Vessel A. As one of the pendant wires fell onto the sea surface and the crew of Vessel A who were previously looking down from the bow disappeared at about 1700 hours, the workers of Vessel B imagined something unexpected had happened, and then at about 1710 hours, the other pendant wire which was hanging from the bow hole of Vessel A also came falling down. The Vessel B was notified from a patrol boat securing the area that crew members of Vessel A were injured, and they therefore recovered the two pendant wires which had fell down with a crane. The eye of one of the recovered pendant wires had a piece of the stopper of Vessel A attached to it. After injured the ordinary seaman A 1 was lifted up and transferred to the hospital by helicopter, the Vessel B brought her bow close to the bow of Vessel A to give a mooring rope to Vessel A, and then towed Vessel A sternway to Mutsure Hakuchi in the western seas of Shimonoseki City. The ordinary seaman A 1 suffered serious injuries such as open fracture of his left shinbone shaft, whereas the ordinary seaman A 2 sustained bruise on his left foot, respectively. Next day on the 16 th, the Vessel A removed the cable of the parachute type sea anchor that got entangled at Mutsure Hakuchi. Weather condition: Weather - Fine Wind direction - North Wind speed - about 14 to 15 m/s Visibility Fair - 7 -

Other Information Analysis Sea condition: Wave height about 2.5 m Vessel A was equipped with red-colored metal ware that was welded and fixed towards the front of bow bollard, which was used for temporarily mooring the towing rope. The specifications of the towing ropes of Vessel B were as follows: Towing wire: About 56 mm in diameter and about 600 m in length Buffer rope: About 100 mm in diameter and about 50 m, made of polyethylene Pendant wire: About 46 mm in diameter and about 30 m Heaving line: One about 33 mm in diameter and about 45 m, the other about 30 m in length made of synthetic fibers The Vessel B crew recognized scratch damage to the heaving line that was recovered after the accident. Vessel B has been using the heaving line that was broken in this accident since its launch in October 1997. Vessel B was shaking up and down about 2 to 3 meters due to the waves. Involvement of crew A: Applicable, B: Applicable Involvement of hull and engine, etc A: Not applicable, B: Not applicable Involvement of weather and sea conditions A: Applicable, B: Applicable Analysis of findings 1. It is probable that Vessel A was towed by Vessel B to Mutsure Hakuchi in order to remove the rope of the parachute type sea anchor of a fishing boat that became entangled in the northwestern waters of Tsunoshima while she was drifting. 2. It is probable that while the Vessel A was working on the mooring of the towing rope with Vessel B in the northwestern waters of Tsunoshima, they tried to moor temporarily the pendant wire, which were picked up by heaving line rolled by warping end of the starboard mooring winch, with the starboard bollard. when the heaving line was broken and thus the pendant wire hit and injured the lower legs of the two ordinary seamen working there. 3. It is probable that the heaving line was broken due to the reasons below, but the cause could - 8 -

Probable Cause Actions Required not be clarified as no one witnessed the situation wherein the said line was broken. It is possible that when Vessel B was oscillating up and down due to the waves, breaking load over the capacity was imposed on the heaving line. It is possible that the breaking load capacity of the heaving line had been weakened since it had been passed for about 14 years since the vessel s launch. It is possible that the heaving line was passed through the bow hole, instead of the starboard fairlead as planned by the Vessel B, and therefore when it was wound up with the warping end of the starboard mooring winch, it came in contact with the hatch corner in front of the starboard forecastle deck, which thus impaired the line strength. It is probable that this accident took place while the Vessel A was working on the mooring of the towing rope with Vessel B in the northwestern waters of Tsunoshima, they tried to moor temporarily the pendant wire, which were picked up by heaving line rolled by warping end of the starboard mooring winch, with the starboard bollard and attached the stopper to the said bollard, when the heaving line was broken and thus the pendant wire hit and injured the lower legs of Ordinary Seaman A 1 and Ordinary Seaman A 2 working there. The following are possible measures to prevent the recurrence of similar accidents: When engaging in mooring operation of towing ropes, crews of a towing boat and a towed vessel shall have full discussion on mooring method and safe towing method by giving consideration to the arrangement of mooring equipment of the towed vessel as well as using a mooring schematic, etc. It is advisable to inspect the towing rope properly and replace it with a new rope as needed. When taking a stopper, care shall be taken not to impose load on a rope of low breaking strength and to secure safety of crew members. The crew members shall engage in the work in a safe location in case the towing rope is broken. The operation leader shall always keep in mind the behavior of the crew members so that they do not enter the danger area. The operators of equipment machines shall not leave their assigned position except for compelling reasons such as approaching danger, and in the event of leaving the machines in operation, such - 9 -

machines shall be stopped or rendered idle, which then shall be reported to the operation leader. - 10 -