Secondary Aluminum NESHAP 40 CFR Part 63 Subpart RRR. Example Malfunction Plan for Plant ABC

Similar documents
Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

O&M MANUAL HIGHLIGHTS

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Hazardous Energy Control

Control of Hazardous Energy Lockout / Tagout Program

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

AMERICAN AVENUE LANDFILL KERMAN, CA

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

LOCKOUT/TAGOUT PLAN August 2015

Lock Out/Tag Out Control of Hazardous Energy

Control of Hazardous Energy. Environmental Health and Safety

Lockout Tagout Program

Gettysburg College. Energy Control Program

Isolation and Lockout

Title: Benzene Awareness Effective Date: 11/14/2014 Control Number: THG_0037 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

H. Control of Hazardous Energy: Lockout/Tag Out

University of Vermont Department of Physical Plant Burlington, Vermont

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

Walking-Working Surfaces and Personal Protective Equipment (Fall Protection. Systems) for General Industry; Approval of Collections of Information

LO/TO LOCKOUT/TAGOUT PROGRAM

Health, Safety, Security and Environment

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

THE UNIVERSITY OF NORTH CAROLINA

1. The Middletown Public Schools will have defibrillators in each school building.

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

Cabinet. 1.0 POLICY It is the policy of Calvin College to comply with the MIOSHA Respiratory Protection Standard Part 451.

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

Public. Water Supply Emergency Response Plan For The. Village of Clayton Water Treatment Facility. Public Water System I.D. No.

Ohio EPA. Division of Air Pollution Control. Engineering Guide #78. (also known as DSIWM Guidance Document #1001 and #1002)

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

Facilities Management

Sample Lockout/Tagout Policy

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

Lockout/Tagout - Control of Hazardous Energy Program

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

Lockout / Tag out Program

Lockout/Tagout Safety Policy

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

Confined Space Entry Program

Lockout Tagout Program

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

CONTINUING REVIEW 3/7/2016

230-LOCKOUT/TAGOUT PROGRAM

Occupational Safety Next Review Date: 12/30/18. Scope: University Wide Original Creation Date: 1998

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

UNIVERSITY OF TENNESSEE GRADUATE SCHOOL OF MEDICINE INSTITUTIONAL REVIEW BOARD CONTINUING REVIEW AND REAPPROVAL OF RESEARCH

Proposed Uniform Standards for Equipment Leaks

Swimming Pools only* b) rescue procedures

Delaware State University

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS

LOCKOUT/TAGOUT PROGRAM

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

CalARP Checklist Summary of Violations Program Level 3 Facilities

HAZARDOUS INCIDENT SITE SAFETY PLAN

EMA, Inc. SITE SAFETY PLAN

Article 203 Self-Contained Breathing Apparatus (SCBA)

Once Printed This Document May No Longer Be Current

Occupant Emergency Plan. OEP Guide. Supplement 3: OEP Template

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

Minnesota Rules, Chapter 4732 X-ray Revision

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

OPERATING PROCEDURES

PRINTED COPY IS NOT CONTROLLED Page 1 of 22

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Emergency Preparedness Developing the Plan

Section 6. Inspection, Evaluation and Testing. (as applicable to APSA tank facilities)

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

IRB MEETING ADMINISTRATION

WORKING ALONE PROGRAM

Elements of a Lockout/Tagout Program OSHA

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

Title: Hazard Communication Right to Know Program Effective Date: 5/88 Revision: 12/14 Number of Pages: 7

LOCKOUT / TAGOUT PROGRAM

Management Plan for Lockout Tagout (LOTO) ISD #535

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

FAQs: Confined Spaces in Residential Construction

Mine Dust Management Plan

Control of Hazardous Energy Program (Lockout/Tagout)

NAVSEA STANDARD ITEM

ABSTRACT PLANT FILES SHOULD BE REVIEWED PERIODICALLY TO ASSURE COMPLIANCE. IF A PROBLEM EXISTS, PLEASE NOTIFY THE TACA SAFETY COMMITTEE.

UNIVERSITY OF TENNESSEE HEALTH SCIENCE CENTER INSTITUTIONAL REVIEW BOARD CONTINUING REVIEW OF RESEARCH

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Safe Operating Procedure

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

LOCKOUT/TAGOUT PROGRAM

General Duty Clause. Section 112(r)(1) of CAA. Chris Rascher, EPA Region 1

HAZARD COMMUNICATION Plan Globally Harmonized System

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Transcription:

Secondary Aluminum NESHAP 40 CFR Part 63 Subpart RRR Example Malfunction Plan for Plant ABC Final April 3, 2003 This is an example of one way to write a malfunction plan. Citations to Federal requirements found in Title 40 of the Code of Federal Regulations (CFR) are provided for reference, as applicable. Information Transfer and Program Integration Division Office of Air Quality Planning Standards U.S. Environmental Protection Agency Research Triangle Park, NC 27711

Table of Contents 1 Important Message to Readers 2 About Malfunction Plans 2-1 Regulatory Overview 2-2 Defining Malfunctions 2-3 Types of Potential Malfunctions 3 What Do I Report to the State/EPA When There Is a Malfunction? 4 Malfunction Plan Checklist 5 Sample 5-1 Malfunction Plan Overview and Approval 5-2 Important Phone Numbers 5-3 Malfunction of Monitoring System Components: Monitoring Equipment, Data Acquisition 5-4 Catastrophic Events: Fire, Lightening, Weather, and Other Acts of God 5-5 Loss of Utilities: Power, Gas, Water, etc. (as applicable to facility equipment) 5-6 Sudden and Unavoidable Failure of Equipment (not due to poor operation or maintenance) 5-7 What to Record for a Malfunction Event 5-8 Who to Notify in Case of a Malfunction 5-9 Plant ABC Malfunction Report Form 2

1 Important Message to Readers The Secondary Aluminum NESHAP (40 CFR, Subpart RRR, 63.1500-1520), requires that affected facilities develop and implement a written Malfunction Plan, as part of a Startup, Shutdown, and Malfunction Plan (SSM Plan) that meets the requirements of 63.1516(a) of Subpart RRR and 63.6(e)(3) of Subpart A, General Provisions for the National Emissions Standards for Hazardous Air Pollutants (NESHAP). This document is intended to provide an example of the type of information that could be included in a facility Malfunction Plan. It does not address Startup and Shutdown Plans, however, that sources also must have for their process equipment. You are required to develop a Malfunction Plan if you operate secondary aluminum process equipment or air pollution control and monitoring equipment. ( 63.6(e)(3)). Facilities subject to Subpart RRR may differ from the example Malfunction Plan shown here because of the types of equipment and processes at their facility. Each facility also may differ in the procedures it uses to identify and respond to malfunction events. For these reasons, the example Malfunction Plan should be treated only as an illustration that may be useful to facilities as a starting point for developing Malfunction Plans that are plant-specific. The example Malfunction Plan provided here is for information purposes only. It should not be used for regulatory interpretation or enforcement purposes. 3

2 About Malfunction Plans 2-1 Regulatory Overview 2-2 Defining Malfunctions 2-3 Types of Potential Malfunctions 4

2-1 Regulatory Overview The general regulatory requirements cited below are addressed in our plan [Note: The NESHAP General Provisions are currently undergoing revisions which may change these requirements]: 63.6(e)(3) of Subpart A, General Provisions and 63.1516(a) of Subpart RRR requires that we develop and implement a Startup, Shutdown, and Malfunction Plan for operations used to comply with the Secondary Aluminum NESHAP ( 63.1516, 63.6(e)(3)). This Malfunction Plan is intended to meet the Malfunction Part of these Federal requirements for Plant ABC operations. 63.1516(a)(2) and 63.6(e)(3) of Subpart A, General Provisions, requires Plant ABC to describe what corrective action we will take if a malfunction occurs at an affected process, air pollution control or monitoring equipment. In addition to the requirements to develop and implement a written Malfunction Plan, we are also required to ( 63.1516(a) and 63.6(e)(3)(vii)): Keep records of any malfunction event that occurs and keep records of the actions we took to minimize emissions during the event. Submit reports if procedures we took during the event are not consistent with the procedures we put in the plan and excess emissions occurred. Revised the Malfunction Plan if a malfunction occurs that has not been described here or procedures for corrective action have not been adequately described. Update the plan if requested by EPA or the appropriate State or Local Air Pollution Control Authority. 5

2-2 Defining Malfunctions Plant ABC may experience malfunction events. Please be aware that our operators may use a different definition of the term malfunction than the regulatory definition. Regulatory Definition of Malfunction The General Provisions define a malfunction as: Any sudden, infrequent, and not reasonably preventable failure of air pollution control and monitoring equipment, process equipment, or a process to operate in a normal or usual manner. Equipment and control device failures that are caused in part by poor maintenance or careless operation are not malfunctions ( 63.2). [Note: The NESHAP General Provisions are currently undergoing revisions which may change this definition] A true malfunction must have a reasonable potential to cause an exceedance in emissions or operating parameter. Plant ABC also has a separate plan for routine maintenance of our process equipment and control devices covered under the Secondary Aluminum NESHAP that is called our Operating, Monitoring, and Maintenance Plan (OM&M). According to our OM&M plan, routine maintenance operations must be performed in accordance with the equipment manufacturer s specifications and recommendations, as well as the procedures specific to Plant ABC that are detailed in our OM&M plan. 6

2-3 Types of Potential Malfunctions The following is a list of malfunction events covered by the example Malfunction Plan included here: Failure of monitoring system components (for example, monitoring equipment, data acquisition equipment); Catastrophic events (for example, fire, lightening, extreme weather/storms, flood, earthquake, meteors, and other acts of god); Loss of utilities (for example, power, gas, water, as applicable to equipment); and Sudden and unavoidable failure of control or process equipment, not due to poor operation or maintenance. 7

3 What Do I Report to the State/EPA When There is a Malfunction? If the actions taken during the malfunction were consistent with this Malfunction Plan, we will state this fact in our semiannual excess emissions report (due within 60 days following the end of each 6-month period) with the following information included ( 63.10(d)(5)(i)): Certifying signature of the owner/operator or other responsible official; Statement that the actions taken during the malfunction were consistent with the Malfunction Plan; The number, duration, and a brief description of malfunction that occurred during the reporting period ( 63.10(d)(5)(i)) or a copy of a malfunction report form that includes this information (see Section 5-7 for an example form); Whether any excess emissions and/or parameter monitoring exceedances are believed to have occurred during the malfunction ( 63.10(d)(5)(ii)); and Any additional information required by our State or permitting authority. If the actions taken during a malfunction were not consistent with this Malfunction Plan, because the plan did not address the type of malfunction that occurred and/or the actions taken were not included in the current Malfunction Plan, and excess emissions occurred, the Environmental Supervisor should report the actions taken by telephone or facsimile (FAX) transmission within two (2) working days after the malfunction. A letter must then be sent within seven (7) working days after the malfunction. The letter should include the following information ( 63.10(d)(5)(ii)): Name, title, and certifying signature of responsible official; Detailed explanation of the circumstances of the malfunction; The reasons for not following the current Malfunction Plan; and Any additional information required by our State or permitting authority. 8

3 (continued) What Do I Report to the State/EPA When There is a Malfunction? If the actions taken during the malfunction were not consistent with the Malfunction Plan or did not address the particular type of malfunction that occurred, and the Plant ABC Malfunction Plan should include these events or actions for future events, then the Environmental Supervisor at Plant ABC must also ( 63.6(e)(3)(viii)): Revise the Malfunction Plan within 45 days after the malfunction to include procedures for operating and maintaining the source during similar malfunction events, with a program of corrective action to address the malfunctions; and Report the revisions of your Malfunction Plan in the semiannual excess emissions report (within 60 days following the end of each 6-month period). If the revisions to the Malfunction Plan alter the scope of the process activities at Plant ABC that are deemed to be a malfunction or otherwise modify the applicability of any emission limit, work practice requirement, or other requirement in Subpart RRR, the revised Malfunction Plan is not effective until written notice has been provided to the permitting authority describing the Malfunction Plan revision(s) ( 63.6(e)(3)(viii)). Depending on what our revisions are, the permitting authority and/or EPA may request to see a copy of our revised Malfunction Plan ( 63.6(e)(3)(v)). [Note to Readers: The NESHAP General Provisions are currently undergoing revisions which may change the requirements for SS&M Plan submissions.] 9

4 Malfunction Plan Checklist When you write your own malfunction plan, you should look at the following checklist to see if you have included all of the required information. This checklist includes the least amount of information that you should write down during any malfunction. You can include more information--so your employees know what to do in case of a malfunction and so you can describe as best as possible what happened during the malfunction if you so desire. For secondary aluminum plants, the Malfunction Plan must be developed within 60 days after the date that your secondary aluminum operations need to be in compliance with Subpart RRR. Your Malfunction Plan is part of the Notification of Compliance Status Report required by Subpart RRR for your secondary aluminum operations; this report is not complete without a Malfunction Plan ( 63.1515(b)). Checklist Have you included what you will do to find the cause and circumstances of all types of malfunctions of your process, air pollution control, and air pollution monitoring equipment? Have you included what you will do to correct (for example, repair) the malfunctioning process, air pollution control, and air pollution monitoring equipment as soon as practical after the malfunctions happens? Have you reported any changes to your Malfunction Plan in your semiannual Excess Emissions Report (due within 60 days following the end of each 6-month period) and in any other reports required by your State Implementation Plan? (continued) 10

4 (continued) Malfunction Plan Checklist Checklist (continued) Have you included procedures for recording the following information as soon as practical after the malfunction occurs? a b c d e f g At what piece of equipment or where in the process did the malfunction occur? What was the date and time of the malfunction and how long did it l last? What was the cause of the malfunction? What did you do to correct the malfunctioning equipment? Were any emissions and/or parameters that you monitor higher or different than their values allowed by regulations during the malfunction? Is what you did during the malfunction the same as you describe it in your Malfunction Plan? If you did anything that was not in your current Malfunction Plan, what was it? 11

5 Sample 12

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-1 Malfunction Plan Overview and Approval Purpose of Malfunction Plan The purpose of this Malfunction Plan is to describe the actions that will be taken at Plant ABC in the event of malfunction of equipment regulated by the Secondary Aluminum NESHAP (40 CFR Part 63 Subpart RRR). A copy of the original Malfunction Plan and all revisions is on file at the Office of the Administrator at Plant ABC [or another central location]. This plan, and prior versions will be maintained by Plant ABC for a period of five (5) years ( 63.6(e)(3)(v)). This Malfunction Plan does not contain proprietary information and will be available to regulators and the public for copying. [Insert provisions if proprietary information is maintained elsewhere. Note: The NESHAP General Provisions are currently undergoing revisions which may change these requirements.] Responsible Officials At Plant ABC, the Environmental Manager or his designee is responsible for assuring that the most recent copy of this Malfunction Plan is made available to personnel involved with secondary aluminum operations. This individual is also responsible for ensuring that Plant ABC employees are aware of the procedures and requirements contained within this plan. All reports associated with this Malfunction Plan shall be signed by a responsible official in accordance with 63.1516(a) and appropriate provisions under Subpart A, the General Provisions. Malfunction Plan Approval Environmental Supervisor Name Date Date Malfunction Plan was Prepared: Prepared by: Devices Covered by this Malfunction Plan (Name/ ID#/Location): 13

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-2 Important Phone Numbers Plant Foreman: Plant Manager: Environmental Manager: State Hotline: Other Relevant Numbers (e.g., fire department, power and water companies, etc.) 14

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-3 Malfunction of Monitoring System Components: Monitoring Equipment, Data Acquisition Confirm equipment status. Identify the component that has failed. Notify appropriate maintenance or other responsible personnel (see Section 5-8). Respond to correct or repair the malfunction in a safe, efficient and timely manner as soon as it is practicable, for example: a Replace defective parts; b Reinstall software; and c [add] etc. Suspend operations as soon as practicable until compliance can be assured if failure cannot be repaired in a timely manner. Record pertinent information (see Section 5-7) on record sheets (see Section 5-9) to log date, time, duration, cause of malfunction, and corrective action taken. Make sure to record whether the Malfunction Plan was followed for each event. Submit the Malfunction Report Form to the appropriate Plant ABC personnel (see Section 5-8). 15

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-4 Catastrophic Events: Fire, Lightning, Weather, and Other Acts of God Ensure that the situation has become stable and the hazards have been cleared before proceeding further. Confirm the system status and note which equipment is off-line or otherwise impaired. Notify appropriate maintenance or other responsible personnel (see Section 5-8). Respond to correct or repair the malfunction in a safe, efficient and timely manner as soon as it is practicable, for example: a Right overturned equipment and attempt to reinstall/restart; and b [add] etc. Suspend operations as soon as practicable until compliance can be assured if failure cannot be repaired in a timely manner. Record pertinent information (see Section 5-7) on record sheets (see Section 5-9) to log date, time, duration, cause of malfunction, and corrective action taken. Make sure to record whether the Malfunction Plan was followed for each event. Submit the Malfunction Report Form to the appropriate Plant ABC personnel (see Section 5-8). 16

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-5 Loss of Utilities: Power, Gas, Water, etc. (as applicable to facility equipment) Ensure that the situation has become stable and the hazards have been cleared before proceeding further. Confirm the system status and note which equipment is off-line or otherwise impaired. Notify appropriate maintenance or other responsible personnel (see Section 5-8). Respond to correct or repair the malfunction in a safe, efficient and timely manner as soon as it is practicable, for example: a Call power company or 911 if power failure seems plant-wide; if not, trace power failure from equipment to power source; b Check source of gas or water; c Trace gas or water line from equipment to the source and determine whether any leaks or breaks in line exist; and d Repair any breaks or leaks that are found in the utility system at the facility. Suspend operations as soon as practicable until compliance can be assured if failure cannot be repaired in a timely manner. Record pertinent information (see Section 5-7) on record sheets (see Section 5-9) to log date, time, duration, cause of malfunction, and corrective action taken. Make sure to record whether the Malfunction Plan was followed for each event. Submit the Malfunction Report Form to the appropriate Plant ABC personnel (see Section 5-8). 17

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-6 Sudden and Unavoidable Failure of Equipment* (not due to poor operation or maintenance) Ensure that the situation has become stable and the hazards have been cleared before proceeding further. Confirm the system status and note which equipment is off-line or otherwise impaired. Notify appropriate maintenance or other responsible personnel. Respond to correct or repair the malfunction in a safe, efficient and timely manner as soon as it is practicable, for example: a Replace deficient part, if spares are available; and b Call maintenance for assistance if needed. Suspend operations as soon as practicable until compliance can be assured if failure cannot be repaired in a timely manner. Record pertinent information on record sheets (attached) to log date, time, duration, cause of malfunction, and corrective action taken. Record whether the Malfunction Plan was followed for each event. * Such as sudden fan failure, lime feeder failure, broken salt feeder, numerous simultaneous bag breaks/leaks, etc. 18

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-7 What to Record for a Malfunction Event The following information should be recorded by the operator on the attached Malfunction Report Form (See the reporting requirements for malfunctions in Section 3): The date and time the malfunction began and ended (estimated as best as possible) ( 63.10(b)(2)(ii)); The duration of the malfunction ( 63.10(b)(2)(ii)); Suspected cause of the malfunction ( 63.1516(a)(1)); The actions taken to correct the malfunction ( 63.1516(a)(2)); If you followed the procedures in this Malfunction Plan ( 63.10(b)(2)(v)); If you did not follow the procedures in the Malfunction Plan, your reasons for following other procedures than those in the Malfunction Plan ( 63.10(d)(5)(ii)); Whether any excess emissions and/or parameter monitoring exceedances are believed to have occurred during the malfunction ( 63.10(d)(5)(ii)); Pertinent process information during the time of the malfunction, as indicated on the Malfunction Report Form; and Any suggestions for revisions to the Malfunction Plan to better accommodate malfunctions such as that which occurred. The completed Malfunction Report Form should be reviewed and signed by the Shift Supervisor and any additional comments added. (See the reporting requirements for malfunctions in Section 3). 19

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-8 Who to Notify in Case of a Malfunction You should notify the Shift Supervisor about the malfunction as soon as practicable. If the malfunction cannot be corrected within a reasonable amount of time after detection (e.g., 60 minutes), notify the Shift Supervisor. The operator on duty should complete the Malfunction Report Form prior to the end of the shift or no later than 24 hours following the malfunction and submit it to the Shift Supervisor. The Shift Supervisor should review and sign the Malfunction Report Form and submit a copy to the Environmental Supervisor. Retain the original form in the shift files for five (5) years ( 63.1517(a)(1) and 63.10(b)(1)). 20

This is an example malfunction plan and it is not intended to be used for regulatory purposes. Citations to Federal requirements found in Title 40 of the CFR are provided for reference, as applicable. 5-9 Plant ABC Malfunction Report Form Date: Malfunctioning device: Time malfunction began (estimated): Time malfunction ended: Total duration of malfunction: hours minutes Suspected cause of malfunction: Corrective action(s) taken: Was this malfunction covered by the Malfunction Plan? Yes No Were your actions consistent with the during the malfunction? Yes No If your actions were not consistent with the during the malfunction, explain why you took other actions: Have you reported your actions that were not consistent with the Plant ABC Malfunction Plan to the proper authorities by telephone or FAX within 2 working days of the event and sent a letter within 7 working days of the event? Do you believe that any excess emissions and/or parameter monitoring exceedances occurred during the malfunction? Yes No Which, if any, units were shut down because of malfunction: Do you have any suggestions for future events like the one that occurred? Your name: Your signature: Name of Supervisor on duty during malfunction: Comments of Supervisor: Signature of Supervisor: 21