Ammonia Treatment Instructions Page 1 of 5

Similar documents
Douglas Call 4/11/2008 1/5. Ammonia Treatment

Birck Nanotechnology Center

How to use Solvent Purification System A brief manual

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

PXRF- Tracer Helium Flow Control System

Manual Solvent Purification System. Innovative Technology, Inc.

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Grade 7 Science Related Reading/Materials. Name: Materials Gr7. Class: Date: States of Matter

Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems

Cell Disruption System

Updated: Variable Temperature

Equipment Operating Procedure Glove Box

Glove Box Installation Manual

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

Napa Technology Trouble Shooting. For Premier & Premier PLUS Models

Rejuvenation Instructions

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

Pump Performance Testing

VOLUMETRIC TECHNIQUES

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Operation of the Perkin Elmer TGA-GC/MS

Exploring the Properties of Gases

Revised: June 7, 2017

Model 130M Pneumatic Controller

Lab Equipment ANALYTICAL BALANCE

UCI AMS Facility. Combustion Protocol Dec 26, 2011

Student s Name: Date : Molar volume of butane

Instructions for Use

Introduction. Part one: Identify the Hydraulic Trainer Components

Approved by Principal Investigator Date: Approved by Super User: Date:

Thermcraft Tube Furnace General Use

Pump out insert (condenser and still lines) overnight with turbo pump

Birck Nanotechnology Center

User s Guide. Vacuum Controller for liquid delivery systems

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Table of Contents Want full page pictures with most important parts labeled in the beginning.

Flexfence Swaging Unit. Product Manual. Release 02/16.

Instruction Manual Updated 5/26/2009 Ver. 2.0

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL

PRESSURE-TEMPERATURE RELATIONSHIP IN GASES

MB-SP Series Solvent Purification System

User Instruction Manual

ACV-10 Automatic Control Valve

Operator: Save these instructions for future use!

DEMONSTRATION 2.1 PROPERTIES OF CO 2. Chapter 2: Gases

Operating Instructions


Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

User's Manual. MixRite TF 10. Edition 05.08

[USING THE VITROBOT April 9, Using the Vitrobot

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax

5890II GC Standard Operating Procedure 9/2/2005

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

ARC Unofficial Manual to the Solvent Dispensing System. Designed by J. C. Meyer

Emulsiflex C3 Homogenizer Protocol

Welcome to the Specialized Medical Services Respiratory training webinar series!

Properties of Gases Observing Atom Pressure of a Gas Measuring Gas Products of Chemical Inferring Molecule Reactions

OPERATING INSTRUCTIONS FOR THE MODEL 85B

Gas Absorption Draft Standard Operating Procedure

CLEANLINESS STANDARD NCPRE tool contamination classification

Working correctly with gas

THE UNIVENTOR 400 ANAESTHESIA UNIT

Exploring the Properties of Gases. Evaluation copy. 10 cm in diameter and 25 cm high)

Installation of Your SprayMaster System

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

Standard Operating Procedure Inert Vacuum Line. Ryan Mulvenna, May 2012

ABRASIVE REGULATOR II

ABRASIVE REGULATOR II

For accurate measurements and to prevent damage to the micropipets, follow these important guidelines:

For accurate measurements and to prevent damage to the micropipets, follow these important guidelines:

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

OPERATING MANUAL LO-CROSS-FLOW CF M

Armfield Distillation Column Operation Guidelines

BASIC LAB SKILLS: EIGHING BALANCE AND BUNSEN

Usage Policies Notebook for Parylene Coating System

Helium-Oxygen Blender

Tactical Sniper air rifle & carbine

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas

Operator: Save these instructions for future use!

Written By: Marcus C

256 Pneumatic Pressure Indicator

PRO SINK -R 1 and 2. Dilution system CONTENTS

Full-Vacuum Chlorinator C 2212 MB / 1

Operator: Save these instructions for future use!

Installation Instructions for NP100 Series Nitrogen Control Panels

BIOSAFETY SELF AUDIT PRINCIPAL INVESTIGATOR/PERMIT HOLDER: CONTAINMENT LEVEL: 1 2 (Shaded) RISK GROUP: 1 2 AUDIT TO BE COMPLETED BY (DATE):

ABRASIVE SYSTEM ABRASIVE REGULATOR II 800# BULK ABRASIVE DELIVERY POT Abrasive Regulator II and 800# Pot Manual

1020 Industrial Drive, Orlinda, TN fax

SPUTTER STATION STANDARD OPERATING PROCEDURE

Vapor Pressure of Liquids

Columbia Taping Tools. Hydra Reach Handle. Manual

Reclaim Basic Set Up

Transcription:

Page 1 of 5 Original version by Douglas Call Updated January 21, 2009 by David Jones Department: Chemical Engineering Location: Fenske 102 (access thru room 103) Contact: BP Matthew Holbrook 161 Fenske bmh200@psu.edu Office: 814-865-9734; Mobile: 484-201-7400 Getting Started: Call or email contact above to schedule a time to use the furnace 9 AM - 5 PM. The Logan group has a gas cylinder with 5% Ammonia in Helium (150 ft 3 ) stored in 102 Fenske where treatment is performed. Use this gas mix for treatment. When this cylinder is empty, email David Jones (dwj123@psu.edu). The cylinder costs ~$230 and requires about 7-10 days for delivery. The Argon gas used for part of the procedure is for general use in the lab and we do not need to purchase a new one when it is empty. Treatment Capacity: The furnace capacity is limited, so plan accordingly. For example: 4 large brushes can fit into the furnace at one time, so if you need 8 brushes, schedule two sessions to use the furnace (about 4 hours per session). IMPORTANT: Check the gas pressure in the Ammonia and Argon cylinders before you begin. This treatment requires Argon with a tank pressure of >200 psi and you do not want to empty the cylinder before you finish the procedure. When you complete the treatment, email David Jones (dwj123@psu.edu) and let him know how much Argon and how much Ammonia gas mix are remaining. LEFT Furnace RIGHT Gases Flask

Instructions: Page 2 of 5 1. Before starting, make sure that the FUME HOOD located on the right side of the wall as you enter the lab is ON. Check by locating the fume hood switch which is below the bench level and to the right of the hood. If it is not on, turn the switch to ON. 2. Locate the 5% ammonia gas mix. The cylinder label reads Ammonia 5% and Helium balance. It is SILVER and looks like this: 3. Argon is the ORANGE cylinder. Make sure that the gas supply is OFF and that the GREEN knobs connected to the tubing are closed. Green Knob Make sure that the gas supply is OFF and that the GREEN knobs connected to the tubing are closed. ARGON 4. Locate a quartz boat and place your samples inside. DO NOT OVERFILL THE BOAT:

For large brushes do not use the boat, instead, tie them together using titanium wire: Page 3 of 5 assist. Lift up the lid on the furnace to ensure that the boat is centered: Tie ends together with titanium wire 5. Locate the far left end of the glass extending from the furnace: Unravel the copper wire, and slide the lid off by SLOWLY twisting back and forth. You may need to rotate the lid back and forth in order for it to come off. Once the lid is off, wet a Kimwipe with acetone and wipe to remove the grease. When the lid is removed, insert your samples (boat or large brushes): CLOSE and LOCK the lid when done! 6. Re-grease the inlet if needed. Reattach the glass lid. Reattach the copper wire as shown in the previous picture. Make sure that the WHITE tube is connected to the top of the glass lid. If a CLEAR tube is connected, you need to change it to the WHITE tube. 7. After ensuring that the glass lid is on securely, turn on the ARGON gas supply. Make sure that the three-way gas valve connecting the ARGON line is pointed to the left (facing the furnace). Make sure that the ARGON is delivering around 20 psi by checking the ARGON regulator. Check the gas flow meter (see next picture) to ensure that the ARGON is and set to 150 cc. Make sure the silver ball is at the 150 cc mark: Slide the sample all the way until it is in the middle of the furnace. Use a wire rod to

Also check the Erlenmeyer flask that sits to the right of the furnace and make sure that there are gas bubbles present in the oil trap. Page 4 of 5 The top number in RED is the actual temperature. The bottom number in GREEN is the set temperature. 8. With the AMMONIA gas still closed, leave the ARGON gas supply on for 20 minutes. 9. During these 20 minutes, begin programming the furnace. The furnace control box is the BLUE box with a #2. The RIGHT control box has a BLUE button, a DOWN arrow, and an UP arrow: Actual Temp. Set Temp. 10. Looking at FURNACE #2, you will see the following: LEFT Furnace #2 MIDDLE RIGHT The POWER switch on the LEFT turns the furnace on and off. To set the program for ammonia treatment, use the RIGHT control box. Press and hold the BLUE button on the RIGHT control box until the display changes to node res. Press the BLUE button once more until you see PrG. Press the UP arrow until the display reads 1. Then use the BLUE button to scroll through the menu items until you see SP1. This is the first temperature set point. Set it to 700 C. you see tn1. This sets the rate at which you want to reach 700 C. Using the UP or DOWN arrows enter 0.30, which means 30 minutes. you see SP2. This sets the temperature for holding the furnace at 700 C. Using the UP or DOWN arrows enter 700 C. you see tn2. Set for 1.15 hour which will ensure at least one hour treatment time. you see SP3. This sets the turn-off temperature. Set it to 20 C.

you see tn3, which is the turn off rate. Hold the DOWN arrow until it reads OFF. Scroll until you see A1, which stands for the alarm. Set this value to 710 C using the UP or DOWN arrows. This function will shut down the furnace if it gets hotter than 710 C. The program is now set. If the furnace was ON when you started entering the program, switch the furnace OFF using the switch on LEFT. Then switch the furnace back ON using the same switch. This ensures the electrical breaker will not be tripped. Press RESET on the MIDDLE switch. You will see an orange light go off. Check to make sure that the ARGON gas is still ON and that the AMMONIA gas is OFF. Press RUN on the RIGHT control box. An orange light will turn on and you will hear a click indicating that it has started. The temperature will begin rising. 11. It will take 30 minutes for the furnace to heat to 700 C. 12. After 30 minutes, ensure that the temperature displays 700 C. If it does, turn off the ARGON gas feed, and turn on the AMMONIA gas feed to a pressure around 10 psi. Check the flow by reading the flow meter as shown above and make sure the SILVER ball is at the 150 cc mark. Check the Erlenmeyer flask located to the right of the furnace to make sure that there are bubbles in the liquid. It will take a few minutes for the bubbles to appear because Page 5 of 5 helium is much lighter than argon. Do not sit until you see the bubbles. 13. With the AMMONIA gas on, wait in lab for one hour. 14. After one hour, turn off the AMMONIA gas and turn on the ARGON gas. 15. The temperature will start to decrease. To ensure the program has ended, turn the furnace completely OFF using the switch on the LEFT (see picture above). 16. Once the furnace temperature has cooled to <300 C you can open the lid to allow the cooling process to speed up. 17. Once the temperature is <50 C, remove the lid on the glass tube following the instructions from above. Using a wire rod, reach inside the tube and remove your samples. Be careful not to push your samples in farther. If necessary, the RIGHT end of the glass tube can be removed in order to push samples toward the LEFT opening. 18. Remove your samples, and leave the quartz boat on the lab bench. 19. Turn OFF the Argon cylinder using the knob located on top of the cylinder. 20. Before leaving, make sure that all the gases are OFF. 21. Email David (dwj123@psu.edu) and tell him how much AMMONIA gas mix and how much ARGON gas is remaining when your experiment is over.