Sight Flow Indicators 300# & 600# ANSI Models:

Similar documents
Circular Sight Windows

Circular Sight Windows

Sterile Visual Flow Indicator

INSTALLATION / OPERATION / MAINTENANCE INSTRUCTION

Armored Gauge O S & Y Bolted Bonnet Valves Series BB-100

Installation, operation and maintenance instructions

MODEL 835-F SIGHT FLOW INDICATOR

Penberthy Series M Flat glass gages Installation, operation and maintenance instructions

Hygienic Bubble Trap Installation and Operations Manual

PENBERTHY SUBMERSIBLE AUTOMATIC SUMP DRAINER INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

PENBERTHY SERIES LC FLAT GLASS GAGES INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

DOUBLE WINDOW SIGHT FLOW INDICATOR

INSTALLATION & MAINTENANCE INSTRUCTION

PENBERTHY MULTIVIEW MAGNETIC LIQUID LEVEL METERS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Automatic Non-freeze Valve NF6

DC5A. Cyclone Separator Trap for Air. Copyright 2015 by TLV Co., Ltd. All rights reserved ISO 9001/ ISO MA-03 (DC5A) 19 June 2015

PENBERTHY SERIES M WELD PAD FLAT GLASS GAGES INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

TITAN FLOW CONTROL, INC.

FLANGED TWO-PIECE BALL VALVES

453 Series Steam Heated Vaporizing Regulator

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

FLANGED MULTI-PORT BALL VALVES

FLANGED TWO-PIECE BALL VALVES

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Instruction Manual LIMITED 1 YEAR WARRANTY. Hydraulic Punch Driver Read this material before using this product.

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Installation, Operation and Maintenance Manual for Back Pressure Regulator

ROPV R40 E Series User Manual

VISI-FLO Sight Flow Indicators

BUTTERFLY VALVES Series 800

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Installation / Operation / Maintenance Manual KLINGER Reflex Level Gauge Type R 25

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

SIX R (P ) AND SEVEN R (P ) POSITION CYLINDERS Service Information

ATD /8 x 50 Retractable Air Hose Reel Owner s Manual

Model ASSEMBLY and OPERATING INSTRUCTIONS

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

SDS -Series 4C-D201/-D202 Supplemental Drying System User s Manual

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

TITAN FLOW CONTROL, INC.

INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

SSFU SUPER SPRAYFAST UNIVERSAL ADHESIVE APPLICATOR

WHEATLEY Series 500 Swing Check Valve

Tri-Safem Model I1 Regulator. INSTRUCTIONS and PARTS

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

Engineering Data Sheet

Cylinder Tilt Saddle Instruction Manual

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

CB7 Bayonets Male & Female 1/4", 3/8, & 1/2 Size

Installation, Operation, and Maintenance Manual

INSTRUCTION MANUAL GAS TRAK

HYGIENIC SIGHT FLOW INDICATORS

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

WHEATLEY Series 822/820 Swing Check Valve

MODEL 154XST INSTALLATION AND SERVICE INSTRUCTIONS FOR MODEL 154XST STROBE LIGHT FOR USE IN HARSH ENVIRONMENTS/ HAZARDOUS LOCATIONS

Pilot Check Valve: Metal Body Type

Types S100K and S102K Pressure Regulators

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Cocoa Patio Pond with Lit Spillway

INSTRUCTION MANUAL. Keep this manual in a safe place for future reference BALANCED PRESSURE THERMOSTATIC STEAM TRAPS L SERIES.

Atmospheric relief valve type 1100 Installation and maintenance instructions

1/2 Twin Hammer Composite. Air Impact Wrench ASSEMBLY AND OPERATING INSTRUCTIONS

3M Liqui-Cel EXF-10x28 Series Membrane Contactor

G92 Series BASOTROL Automatic Pilot Gas Valve

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

FloWash. Industrial Filter Cart

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

6500 KNIFE GATE VALVES

Model No Product Name Handpiece Only Complete System

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

COMPACT METAL bender 99826

WKM Model 320F Floating Ball Valve

Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL

4-in-1 Professional Inflator Kit

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

Flat Glass Gages. Series 300L, 20, 32, 40, L10. Installation, Operation & Maintenance Instruction Manual

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES

JAH5RG-R / JAH5RG-M JAH7RG-R / JAH7RG-M

TECHNICAL DATA. Q = C v P S

HAYWARD FLOW CONTROL FLV SERIES, PVC/CPVC FILTER VESSEL INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Model GP-1000 Series PRESSURE REDUCING VALVE. Installation & Operation Manual

DISASSEMBLING & REASSEMBLING CARTRIDGE INSTALLING SEATPOST ON BIKE

INSTALLATION, OPERATION & MAINTENANCE MANUAL

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

1200B2 Series Service Regulators. Instruction Manual

GILMONT ACCUCAL FLOWMETERS

Transcription:

1ARCHON TM INDUSTRIES, INC. Sight Flow Indicators 300# & 600# ANSI Models: Flanged Threaded AKF-FM, AKF-FH AKF-SM, AKF-SH Installation / Operation / Maintenance Instructions ARCHON INDUSTRIES, INC. 357 Spook Rock Road # I-505 Suffern, NY 10901 Tel.: (845) 368-3600 Fax: (845) 368-3040 Printed in U.S.A. 1994, ARCHON INDUSTRIES, INC., all rights reserved Instruction #: 1021 Issued: Dec 28, 2003 Approved: Engineering Mgr 1

Table of Contents 1.0 Product Warranty... 3 2.0 About the Manual... 3 3.0 Introduction... 4 3.1 Features and Specifications... 4 3.2 Available Models... 4 3.3 Design Ratings PSIG at Max & Min Operating Temperatures... 4 3.4 Application Data... 4 4.0 Inspection and Performance Confirmation... 6 4.1 Receiving Inspection... 6 4.2 User's Rating Inspection... 6 5.0 Installation... 6 5.1 Effect of Related Piping and Precautions... 7 5.2 Positioning of Specific Model... 8 5.3 Bolt Torque... 8 6.0 Operation... 8 6.1 Pre-Operation Check... 8 6.2 Hydrostatic Pressure Test... 9 6.3 Operating... 9 7.0 Maintenance... 9 7.1 Preventative Maintenance... 10 7.2 Maintenance Procedures... 10 7.3 Troubleshooting for Soundness of Glass... 12 7.4 Removal-Disassembly-Reassemble... 12 8.0 Telephone Assistance... 14 Tables and Figures Page Table 1 Maximum Design Ratings for Units with Tempered Glass... 3 Figure 1 Bolt Torque Values... 8 Figure 2 Bolt Tightening Sequence... 8 Figure 3 Pipe Thread Taping......8 Figure 4 Bolt Loosening Sequence... 12 Figure 5 Exploded Parts View... 15 2

1.0 Product Warranty ARCHON INDUSTRIES, INC., warrants its products as designed and manufactured by ARCHON to be free of defects in material and workmanship for a period of one year after the date of installation or eighteen months after the date of manufacture, whichever is earliest. ARCHON will, at its option, replace or repair any products, which fail during the warranty period due to defective material or workmanship. Prior to submitting any claim for warranty service, the owner must submit proof of purchase to ARCHON and obtain written authorization to return the product. Thereafter, the product shall be returned to ARCHON in Port Chester, New York, with freight prepaid. This warranty shall not apply if the product has been disassembled, tampered with, repaired or altered outside of the ARCHON factory, or if it has been subjected to misuse, neglect or accident. ARCHON does not have control over the manner in which its sight flow indicator is handled, installed, or used, and ARCHON cannot and does not warrant or guarantee that a sight flow indicator is suitable or compatible with the user's specific application. ARCHON's responsibility hereunder is limited to repairing or replacing the product at its expense. ARCHON shall not be liable for loss, damage, or expenses directly or indirectly related to the installation or use of its products, or from any other cause or for consequential damages. It is expressly understood that ARCHON is not responsible for damage or injury caused to other products, building, property or persons, by reason of the installation or use of its products. THIS IS ARCHON'S SOLE WARRANTY AND IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED WHICH ARE HEREBY EXCLUDED, INCLUDING IN PARTICULAR ALL WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. This document and the warranty contained herein may not be modified and no other warranty, expressed or implied, shall be made by or on behalf of ARCHON unless modified or made in writing and signed by the President or a Vice President of ARCHON. 2.0 About the Manual This manual has been prepared as an aid and guide for personnel involved in installation and maintenance. All instructions must be read and understood thoroughly before attempting any installation, operation or maintenance. Failure to follow instructions could result in a malfunction or breakage of the indicator, resulting in fluid escaping from the unit and fragmenting glass. Always wear safety glasses when installing, servicing or operating a sight flow indicator. Failure to follow precautions can result in personal injury and property damage. 3

3.0 Introduction 3.1 Features and Specifications ARCHON's Sight Flow Indicators have been designed for the observation of the flow stream in a process pipeline. They are available in a variety of models, sizes and connection styles. The user should refer to ARCHON dimension sheets to determine specific models and connection styles available. These Sight Flow Indicators permit visual monitoring of: liquid interfaces - change in level or evidence of liquid in the viewing area foam interfaces - change in level or evidence of foam in the viewing area fluid movement - change in direction or volume color - change in tint or hue clarity - change in opacity, brightness or purity 3.2 Available Models AKF-FMP AKF-FMF AKF-FMR AKF-FMD AKF-SMP AKF-SMF AKF-SMR AKF-SMD AKF-FHP AKF-FHF AKF-FHR AKF-FHD Plain Indicator / 300# ANSI Flanged Body Rotator Indicator / 300# ANSI Flanged Body Flapper Indicator / 300# ANSI Flanged Body Drip Tube Indicator / 300# ANSI Flanged Body Plain Indicator / 300# ANSI Threaded Body Rotator Indicator / 300# ANSI Threaded Body Flapper Indicator / 300# ANSI Flanged Body Drip Tube Indicator / 300# ANSI Flanged Body Plain Indicator / 600# ANSI Flanged Body Rotator Indicator / 600# ANSI Flanged Body Flapper Indicator / 600# ANSI Flanged Body Drip Tube Indicator / 300# ANSI Flanged Body 3.3 Design Ratings PSIG & Maximum & Minimum Operating Temperatures To determine the maximum allowable working pressure for a specific temperature within the design limits stated above, the user should refer to ARCHON dimension sheets, or when provided, the specifically stated design limits on an ARCHON product proposal. 3.4 Application Data NOTE: For specific application data within the above ranges, consult the ARCHON product proposal data for the specific model and size sight flow indicator, or request ARCHON to supply the applicable Technical Data Bulletin. 4

Body Material Maximum Design Ratings for Units with Tempered Glass (PSIG) Temperature Rating Gasket Material Teflon Asbestos Grafoil Viton Kel-F Neoprene Buna N Iron -20 o F to150 o F 175 175 175 175 175 175 175 at 250 o F 150 at 300 o F 140 at 350 o F 125 125 125 125 125 Bronze -20 o F to 150 o F 225 225 225 225 225 225 225 Carbon Steel at 250 o F 205 at 300 o F 190 at 400 o F 150 150 150 150 150-20 o F to 100 o F 285 285 285 285 285 285 285 at 250 o F 245 at 300 o F 230 at 400 o F 200 200 at 500 o F 170 170 170 316 STS -20 o F to 100 o F 275-65 o F to 100 o F 275 275-120 o F to 100 o F 275-150 o F to 100 o F 275-300 o F to 100 o F 275 275 at 250 o F 230 at 300 o F 215 at 400 o F 195 195 at 500 o F 170 170 170 Table 1 Never exceed these design ratings or application data limits. Exceeding design ratings or application data can cause serious personal injury to personnel. IMPORTANT: Exceeding design ratings or application data can result in property damage. 5

4.0 Inspection and Performance Confirmation 4.1 Receiving Inspection Upon receipt of sight flow indicator, check all components carefully for damage incurred in shipping. If damage is evident or suspected, do not attempt installation. Notify carrier immediately and request a damage inspection. 4.2 User's Rating Inspection The user is to confirm: 1. That the sight flow indicator model number and pressure/temperature rating stamped on nameplate (163) conforms to the description on the user's purchase order. 2. That the operating conditions described in the purchase order agree with the actual operating conditions at the installation site. 3. That the actual operating conditions at the installation site are within the application data shown on the ARCHON Technical Data Bulletin or product or product proposal referred to above. 4. That the materials of construction of the sight flow are compatible with both the contained fluid and surrounding atmosphere in the specific application. IMPORTANT: If the size, model, or performance data of the sight flow indicator as received does not conform with any of the criteria above, do not proceed with installation. Contact an authorized ARCHON distributor for direction on what to do. 5.0 Installation Use only qualified experienced personnel who are familiar with this equipment and thoroughly understand all the instructions in this manual for the installation of this equipment. Refer to ARCHON dimension sheets or ARCHON product proposal to obtain dimensional information for the specific size and model sight flow indicator. Do not proceed with installation of a sight flow indicator unless: 1. The glass has been examined and is free of scratches and other imperfections. Glass that is chipped or scratched is weakened and should not be used under any circumstances. Pressure/temperature ratings within chart above are no longer valid for glass that is weakened. 2. The connections and inside of the sight flow indicator have been cleaned and free of any foreign materials. Failure to do so can cause serious personal injury to personnel. Check the exploded view Figure 5 for the location of the inlet and outlet connections, and for the location and direction of the flow arrow to insure correct hook up. 5.1 Effect of Related Piping and Precautions 6

1. Do not impose system-piping loads on sight flow indicator. Unit is not designed to be a load-bearing component. Piping must be supported and aligned with sight flow indicator end connections to reduce the possibility of stresses imposed on the unit. 2. Locate the sight flow indicator where it can be easily seen. 3. Locate the sight flow indicator away from areas where objects may be dropped, thrown, or generally allowed to effect contact with the viewing window glass. 4. Locate the sight flow indicator so it is protected from dust, grit, tools, and any other objects, which may scratch, chip, or break the viewing window glass. 5. Locate the sight flow indicator so it is protected from external thermal shock, such as would be imposed on a unit in a high temperature application when exposed to a cold air blast or a cold water wash. Failure to mount, protect, and locate sight flow indicator as described within items 1 through 5 above can cause serious personal injury to personnel. IMPORTANT: Failure to mount, protect, and locate the sight flow indicator as described above can result in property damage. 5.2 Positioning of Specific Models 1. Flapper models may be mounted in a horizontal plane provided the flapper closes over the inlet port by gravity when there is no flow. 2. Plain or rotator models may be mounted in any acceptable position. 3. Drip tube models should be mounted in a vertical plane with the flow arrow pointing downward. 5.3 Bolt Torque IMPORTANT: Prior to any bolt torque checks, the sight flow indicator must be relieved of all pressure or vacuum, been allowed to reach ambient temperature, and been drained or purged of all fluids. Bolt torque is vital to the proper operation of a sight flow indicator. Gaskets compress over a period of time; therefore, bolt torque should be checked, and bolt torque values should be brought up to those recommended in chart Figure 1 by following the bolt tightening sequence Figure 2. 7

Unit Size 6.0 Operation Bolt Torque Values in Ft./Lbs. Gasket Material Viton, Buna N, Teflon, Asbestos, Neoprene Grafoil, Kel-F Tempered Tempered Glass Glass 1/4" & 3/8" 1. 2 1. 2 1/2" & 3/4" 1. 2 2. 3 1" 2. 3 3. 5 1 1/4" & 1 1/2" 4. 6 6. 8 2" 8. 10 12. 14 2 1/2" & 3" 19. 23 28. 32 6.1 Pre-Operational Check 4" 31. 35 46. 50 6" 64. 68 86. 90 8" 86. 90 104. 108 Figure 1 1. Check that all installation procedures have been completed. 2. Check that bolts have been torques to their proper limits as stated within Section 5.3 Figure 1 above. Bolt Tightening Sequence Figure 2 3. Check that glass is clean and free of any damage as described within Section 5. Installation above. 4. Check to determine that all connections are pressure tight. 8

6.2 Hydrostatic Pressure Test 1. Take all precautions necessary to handle the possibility of leakage. 2. Hydrostatic pressure test installation to at least 50 PSIG, and correct any leakage before proceeding. 6.3 Operating Sight flow indicator installations should be brought into service slowly to avoid excessive shock or stress on glass. Rapid pressurization of a sight flow indicator can cause glass breakage with resulting sudden release of pressure, causing serious personal injury to personnel. IMPORTANT: Failure to bring a sight flow indicator slowly into service can result in property damage. 7.0 Maintenance Use only qualified experienced personnel who are familiar with this equipment and thoroughly understand all instructions in this manual for all maintenance. DO NOT proceed with any maintenance unless the sight flow indicator has been relieved of all pressure or vacuum, has been allowed to reach ambient temperature, and has been drained or purged of all fluids. Failure to do so can cause serious personal injury to personnel. 7.1 Preventative Maintenance Create maintenance schedules, safety manuals, and inspection details for each specific installation of a sight flow indicator. On all installations, regularly check the following items for purposes of maintenance: 1. Glass, for cleanliness and signs of damage or wear. 2. Shields, if used, for signs of clouding, wear, or deterioration. 3. Sight Flow Indicator, for signs of leakage at gaskets, or at connections. 4. Sight Flow Indicator, for signs of internal or external corrosion. 5. Bolt Torque Values. Determine upon evaluation of your own operating experience an appropriate maintenance schedule necessary for the specific application. Realistic maintenance schedules can only be determined with full knowledge of the services and application situation involved. 9

7.2 Maintenance Procedures 1. Glass Regular and careful attention must be given to the cleaning and inspection of glass. Glass that is etched or even slightly scratched is weakened and may break under pressure. Design ratings listed under Section 3.0 above are no longer valid for sight flow indicators that contain scratched, worn, or otherwise damaged glass, and such glass must be immediately replaced. Failure to do so can cause serious personal injury to personnel. 2. Shields A. Keep glass clean using a commercial glass cleaner and a soft cloth. DO NOT use wire brushes, metal scraper, or any device which could scratch the glass. B. Inspect the surface of the glass for any signs of clouding, etching, scratching or physical damage such as bruises, checks, or corrosion that penetrates the outer surface of the glass. Shining a light at approximately a 45 o angle will aid in detecting some of these conditions, which will glisten more brightly than the surrounding glass when reflecting light. Detection of any such problem areas or any surface wear is sufficient evidence of damage. Immediately take sight flow indicator out of service. DO NOT proceed with operation of sight flow indicator until the glass has been replaced with a glass replacement kit by following the disassemblyreassemble instructions under Section 7.4 below. Shields, which show any signs of clouding, wear, or deterioration, are an indication that the sight flow indicator glass has been exposed, or could soon become exposed to the contained fluid. Immediately take sight flow indicator out of service. DO NOT proceed with operation of sight flow indicator until shields and glass have been replaced by following the disassembly-reassemble instructions under Section 7.4 below. 3. Gasket Leaks Gasket leaks must be immediately repaired. DO NOT proceed with operation of a sight flow indicator until glass, gaskets and cushions have been replaced by following the disassembly-reassemble instructions under Section 7.4 below. 4. Connection Leaks Leaks at a flanged or threaded connection should be corrected by tightening the bolts at the connection, or by taking the sight flow indicator out of service and remaking the connection with Teflon tape or equivalent on all male pipe threads as shown in Figure 3 below. 5. Corrosion Figure 3 10

It is the user's responsibility to choose a material of construction compatible with both the contained fluid and surrounding atmosphere in the user's specific application. If internal or external corrosion is present, an investigation must immediately be carried out by the user as to the cause of the problem, including consulting with an authorized ARCHON distributor. 6. Bolt Torque Bolt torque schedules should be developed by checking bolt torque values daily until an appropriate cycle becomes apparent. The maximum torque is always maintained while not exceeding maximums at any time as shown in chart Figure 1. 7.3 Troubleshooting for Soundness of Glass Problem: Glass or shield becomes etched or clouded in service. Cause: Fluid being handled is not compatible with the glass or shield material. Cure: Install shields that are unaffected by fluid. Problem: Cause: Cure: Glass continually breaks in service. Warped body as a result of mechanical or thermal stresses. Replace sight flow indicator. 7.4 Removal-Disassembly-Reassemble DO NOT proceed with the removal or disassembly of sight flow indicator from the connecting piping unless sight flow indicator has been relieved of all pressure or vacuum, has been allowed to reach ambient temperature, and has been drained or purged of all fluids. Failure to do so can cause serious personal injury to personnel. 1. Disassembly A. Sight flow indicators should be disassembled by holding sight flow indicator firmly and loosening bolts by following the bolt loosening sequence shown in Figure 4. 2. Reassemble A. Refer to exploded view, Figure 5. B. Prepare for installation of new glass (48) by first cleaning the gasket seating surfaces on body (11) and the cushion seating surfaces on the glass covers (1). This should be done using a soft metal scraper (preferably brass) to remove all burrs, rust, and bits of old gasket or cushion which may be present. Exercise extreme care to avoid gouging or scarring gasket or cushion seating surfaces. Once sight flow indicator has been disassembled, all glass, gaskets, cushions, and shields (where used) must be disposed of since they are permanently 11

deformed by compression. DO NOT under any circumstances re-use those items since they can cause leaks or high stress points resulting in glass breakage. If re-used, the glass can break causing serious personal injury to personnel. Bolt Loosening Sequence Figure 4 Failure to prepare gasket or cushion seating surfaces as described above can result in leaks or glass breakage with resulting serious personal injury. IMPORTANT: Failure to prepare gasket or cushion seating surfaces properly can result in property damage. B. Upon receipt of glass, inspect each piece individually for shipping damage. During inspection, and during any subsequent handling of glass, care must be exercised to keep glass (especially the polished faces) from contacting each other or any other surfaces including table tops. If shipping damage is evident or suspected, notify carrier immediately and request a damage inspection. Glass should be kept in original wrap within original box until ready to use. Bumping or sliding of glass against each other or against other surfaces can result in glass breaking, scratching, or chipping. Glass that is broken is dangerous and useless and should be disposed of in a safe manner determined by the user. Glass that is chipped or scratched is weakened and should not be used 12

under any circumstances. Pressure/temperature ratings within Section 3.2 chart above are no longer valid for glass that is weakened. Failure to do so can cause serious personal damage to personnel. D. Place the sight flow indicator in a horizontal position and assemble the components as shown in exploded view Figure 5. Install band (331) around glass and place glass centered within the body and cover. E. Threads on bolts (137) and nuts (4) must be clean of paint, rust, and scale. Apply a light coat of oil to the threads and insert bolts through nameplate and two (2) covers, and install nuts finger tight. F. Use a torque wrench to tighten the bolts. Tighten bolts in increments of 3 ft./lbs. or 50% of torque value as shown in Figure 1 chart, whichever is smaller. Continue tightening sequence at 3 ft./lbs. max. torque until torque values in chart Section 3.3 Figure 1 are reached. G. Gaskets will become compressed a short time after bolts are tightened and torque values will decrease. Therefore, the sight flow indicator must be re-torque after 24 hours in service to values established within chart Figure 1 for the specific model sight flow indicator. DO NOT re-torque a sight flow indicator while under pressure. A sight flow indicator in service must be freed of all pressure or vacuum, allowed to reach ambient temperature and been drained or purged of all fluids before re-torquing is performed. Failure to follow this procedure can result in serious personal injury to personnel. IMPORTANT: Re-torquing a sight flow indicator under pressure can result in property damage. H. Refer to Section 3.0 and 4.0 operation when returning sight flow indicator to service. 8.0 Telephone Assistance If you are having difficulty with your Sight Flow Indicator, notify ARCHON INDUSTRIES, INC., (845) 368-3600. To help us assist you more effectively, please have model number and Purchase Order number available. 13

Figure 5 14