CERTIFYING GASFITTER

Similar documents
Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

CERTIFYING GASFITTER

CERTIFYING GASFITTER

CRAFTSMAN EXAMINATION, NOVEMBER 2007 GASFITTING ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CERTIFYING GASFITTER

ARCHIVED. Compliance Document for New Zealand Building Code Clause G11 Gas as an Energy Source. Prepared by the Department of Building and Housing

Summary of the MRA LPG Codes of Practice

REGISTRATION EXAMINATION, JUNE 2015 CERTIFYING PLUMBER ANSWER SCHEDULE

About SPK-Rifeng Gas

Overview EUSDSG3.6. Gas tightness testing and direct purging

CERTIFYING DRAINLAYER

Installation and maintenance of twin 45kg LPG cylinder systems

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

REGISTRATION EXAMINATION, NOVEMBER 2015 LICENSED PLUMBER ANSWER SCHEDULE

GAS DELIVERY PRESSURE AND MEASUREMENT

REGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER ANSWER SCHEDULE

Gas and Carbon Monoxide Safety

Gas Safety Code of Practice

Telco Antennas SWMS Working At Height Above 2m

WHS CONTRACTOR INFORMATION PACKAGE

TRADESMAN DRAINLAYER

Your safety and the safety of others are very important.

Propane Conversion Kit Instruction

AS/NZS 1596:2014. The storage and handling of LP Gas AS/NZS 1596:2014. Australian/New Zealand Standard. Superseding AS/NZS 1596:2008

Propane Conversion Kit Instruction

6. Features & Benefits Installation Considerations Jointing Instructions Pipe Sizing Calculations & Tables

Safety at Work. Rules for Staying Alive

Owner s Manual. Recreational Craft Directive RYA Compliance Guide Appendix 8. General

HS26 Working at Height Policy and Procedure

Contractors' Code of Safe Practice

Technical Briefing Note

H15 Series BASO 100% Shutoff, Automatic Pilot Valve

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

FATAL AND SEVERE RISK PROGRAM

Removal of Lead-Based Paint

BRIEF IDEA ON LPG SAVINGS IN DOMESTIC CYLINDERS, TO BE ACHIEVED NOW:-

LADDERS FIXED AND PORTABLE

Propane Conversion Kit Instruction

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

Building 32A Roof Safety Assessment

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems

Safety Risk Assessment Roofing Works / Surveying / Inspections

ESG35T * * Installation & Operation Manual. For Service, Call (318) Price: $6.00

INOGATE Technical Secretariat UK Experience European Standards Implementation Key Expert Phil Winnard Session 2 Georgia, October 2015

Working at Height Policy Edition 1 27 th October Authorized by. ... Managing Director

Prevention of Falls and Working at Heights

Working at height policy

A little technical and safety...

Contractor handbook. Purpose

Transmission Connection Forms

Safe Work Procedure for installation of external cladding

Network Regulator Maintenance Operatives LS (Non-Accredited)

ROOF ANCHOR TO GO INSTALLATION & OPERATING INSTRUCTIONS. AZ-200 Portable Roof Anchor for Metal Roofs. zero4heightsafety.com

COOPERATION FOR A SAFE WORKSITE

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

NZS 5259:2015. New Zealand Standard. Gas measurement. Superseding NZS 5259:2004 NZS 5259:2015

Rheem Spare Parts Manual. Commercial gas model A Exterior 265L

Rheem Spare Parts Manual Commercial gas model A Exterior 265L

EDUCATION DEPARTMENT ACCU-TEST

Building 9 Roof Safety Assessment

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Spirax Compact FREME Flash Recovery Energy Management Equipment

Distribution Connection Forms

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

8. Fall Protection Procedures WAC

Gas Countertop Hot Plates

About. providing superior performance and reliability. Bromic regulators are AGA or UL144 approved.

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

5.0 Store. safely IN THIS SECTION: 5.1 Decanting or transferring

Bar valve with fixed shower head Installation guide

Fall Hazards: One of OSHA s Big Three. By Mark A. Lies II and Elizabeth Leifel Ash I. INTRODUCTION

VULCAN GAS SALAMANDER MODEL SG-G

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Gas Fired Residential Heating Boilers

GUIDELINES ON SAFE HANDLING AND STORAGE OF COMPRESSED GASES CHEMICAL MANAGEMENT CENTRE

INSTALLATION & OPERATION MANUAL FOR Teppan-Yaki Griddles

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment.

Department of Facilities Management. Occupational Health and Safety. Fall Protection Program

OPERATING INSTRUCTIONS Sherlock Chamber Testing System

The Work at Height Regulations 2005 A brief guide

The Work at Height Regulations 2005 A brief guide

REQUIREMENTS FOR THE INSTALLATION OF GAS UTILIZATION EQUIPMENT THAT MIXES PRESSURIZED OXYGEN WITH NATURAL GAS

SIZING AND CAPACITIES OF GAS PIPING Reserved

Contractor / Exhibitor Handbook

Waste Industry Safety & Health

Mr. Teo Han Ping Head, Programme Management, Occupational Safety & Health Division, Ministry of Manpower

Using propane cylinders safely

SIZING AND CAPACITIES OF GAS PIPING

"FALL PROTECTION IN CONSTRUCTION ENVIRONMENTS"

Building 24 Roof Safety Assessment

SIZING AND CAPACITIES OF GAS PIPING

Tightness testing and direct purging of small Liquefied Petroleum Gas/Air, Natural Gas and Liquefied Petroleum Gas installations

SIZING AND CAPACITIES OF GAS PIPING

Why Update. OSHA updated Walking Working Standard. Who & What it Covers. Housekeeping (a) 6/25/ nd Leading cause of Workplace fatalities

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

NAVSEA STANDARD ITEM. 1.1 Title: Occupational, Safety and Health Requirements; accomplish

Fall Protection for General Industry and Construction. Josh Flesher Assistant Regional Administrator for Cooperative and State Programs

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Transcription:

No. 9196 REGISTRATION EXAMINATION, NOVEMBER 2016 CERTIFYING GASFITTER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2016. All rights reserved. No part of this publication may be reproduced by any means without the prior permission of the Plumbers, Gasfitters and Drainlayers Board.

ANSWER 1 Any THREE (1 mark each) The Plumbers Gasfitters and Drainlayers Act. The Building Act. The Gas Act. The Electricity Act. Total 3 Marks ANSWER 2 Measurement X correct (130 mm). (2 marks) Corrugations crossed according to the wind zone (2 crests finish in trough). (1 mark) Rubber boot flashing on angle. (1 mark) Soaker flashing terminating under ridge flashing or cover sheet (250 mm). (2 marks) Fixing of rubber boot flashing to soaker flashing. (1 mark) Support for flashing shown. (1 mark) Total 8 Marks ANSWER 3 Sizing Table Pipe Section Table Allowable Pressure Drop 10% Pipe Section MJ Pipe Size Main Run 21-22 m A B 321 32 mm Total MJ 321 B C 220 25 mm Additional metres Per fitting 0.6 B D 101 20 mm Number of fittings 10 D E 35 15 mm Corrected Length + 6 m D F 66 20 mm Main run pipe diameter 32 mm F G 38 15 mm F H 28 15 mm ANSWER 4 (1 mark each) Total 24 Marks Pipe Section Number of clips A B 50 mm diameter pipe 8 B C 25 mm diameter pipe 6 B D 40 mm diameter pipe 7 D E 32 mm diameter pipe 5 Total 4 Marks Certifying Gasfitter 9196 Answers, November 2016 1

ANSWER 5 450 0.3 = 135 60 0.5 = 30 Vol (l) per second = 135 + 30 = 165 Vol (l) per hour = 165 3600 = 594,000 Vol (m 3 ) per hour = 594,000 1000 = 594 m 3 /hr (5 marks) (b) 450 + 30 + 30 = 510 MJ 510 150 = 76,500 mm 2 (2 marks) (c) 594 4 = 148.5 m 3 (1 mark) (d) A fan interlock that will shut off the gas supply. (2 marks) Total 10 marks ANSWER 6 Any FOUR (1 mark each) 1. Measurement systems. 2. Gas quality. 3. Gas composition. 4. Normal and emergency operating conditions. 5. Environment conditions. 6. Temperature. 7. Pressure to which they will be subjected. Total 2 Marks ANSWER 7 (a) Gas rate = 0.05 40 3600 70 (2 marks) = 102.86 MJ/h (1 mark) = 102.86/3.6 kw = 28.5 kw (1 mark) Energy output = 80% of 28.5% = 22.86 kw (1 mark) (b) Energy passed would increase. (1 mark) Certifying Gasfitter 9196 Answers, November 2016 2

ANSWER 8 Any FIVE (1 mark each) Type of gas being used. Inlet or upstream pressure. Outlet or downstream pressure. Maximum flow anticipated. Size of pipework. Location. Total 5 Marks ANSWER 9 (a) Any SIX of: Manufacturer. Model Number. Type of gas. Working pressure. Input rating. The gas safety compliance label. (3 marks) (b) Shape of flue circular or non-circular Input rating of appliance Length of the flue allowing for lateral runs Material of construction heat loss Position heat loss Size of flue spigot on appliance Any recommendations of appliance manufacturer Termination point (3 marks) ANSWER 10 (a) Replacement of a gas appliance with an equivalent gas appliance, except in a caravan or boat with sleeping quarters, provided the work does not involve: the repositioning of pipework or flue, or a change in the installation pressure, gas type, ventilation, energy consumption, or operation of the installation. (This is sometimes referred to as like for like gasfitting.) The maintenance of fittings and appliances other than repairs following a notifiable accident. The replacement of instrumentation and related controls, but only if the work does not result in the repositioning or disturbance of other pipework. The setting of safety devices, combustion conditions, and controls that are not designed to be adjusted by a consumer or gas refueller. Temporary gasfitting for experimental, testing, demonstration, teaching, or research purposes in a gas engineering workshop, manufacturing facility, gas test facility, laboratory, hospital, research project, or teaching institution. (2 marks) Certifying Gasfitter 9196 Answers, November 2016 3

(b) Addition or alteration to an existing installation. Work not carried out in accordance with the means of compliance in the Installation Standard. Work on an installation that includes gas pressure-raising equipment. Repair work following a notifiable accident. Work in domestic premises where the maximum operating pressure is more than 7 kpa for natural gas or more than 14 kpa for LPG. Work in a building of more than three storeys which contains three or more separate dwellings. Work done to AS/NZS 5601 Part 1 where the supply pressure to the installation is greater than 200 kpa. Work done to AS/NZS 5601 Part 2 where the supply pressure to the installation is greater than 3 kpa. Work done within 20 metres of a hazardous area. Work done in a building in which air pressure is controlled by a mechanical ventilation system. Work done in a place where combustion air may be varied by mechanical means Work done in a caravan or boat that contains sleeping accommodation. (2 marks) (c) General gasfitting is gasfitting that is not categorised as low-risk or high-risk work. (1 mark) (d) Replacement of a gas appliance with an equivalent gas appliance, provided the work does not involve: the repositioning of pipework or flue, or a change in the installation pressure, gas type, ventilation, energy consumption, or operation of the installation. (1 mark) ANSWER 11 (a) Structure built at ground level and lifted into position on completion. (1 mark) (b) Any THREE (1 mark each) Edge protection. Guard-railed work platform (e.g., scaffold or elevating work platforms). Total restraint system to prevent a fall occurring. (2 marks) Fall arrest system. Nets or air bags to minimise the impact of a fall. Where unguarded trestles or platforms are used, or the work will be done from a ladder or stilts, the risk of harm shall be minimised through management controls and the provision of appropriate training. Management controls include effective housekeeping protocols and clear procedures for safe use of the equipment. (3 marks) Certifying Gasfitter 9196 Answers, November 2016 4

ANSWER 12 (a) WorkSafe New Zealand. (1 mark) (b) 24 hours. (1 mark) (c) Any FIVE (1 mark each) Nature of work. Address of worksite. Contractor details. Brief description of work. Due date of commencement. Estimated time to complete. (5 marks) Total 7 Marks ANSWER 13 Maximum outlet operating pressure LPG Maximum outlet operating pressure natural gas 3.5 kpa 1.5 kpa Total 2 Marks ANSWER 14 The thermocouple is too far from the flame. The oven by-pass is set incorrectly. The thermostat is faulty. Total 3 Marks SECTION B 1. A 60 C. 2. E 25 litres. 3. E The volume is indicated on the meter badge. 4. C Oxygen Depletion Pilot. 5. D 3 months. 6. D 4000 mm 2. 7. B QCC. 8. D 450 mm. 9. A When it has a mass of 20 kg or less. Total 9 Marks Certifying Gasfitter 9196 Answers, November 2016 5