HYDRAULIC CRAWLER CRANE CKE Max. Lifting Capacity: 2 t Max. Boom Length: 91.4 m Max. Jib Combination: 76.2 +. m Max. Luffing Jib Combination: 1.8 + S P E C I F I C A T I O N S Main Boom Max. Lifting Capacity Max. Length Fixed Jib Max. Lifting Capacity Max. Combination Luffing Jib Max. Lifting Capacity Max. Combination Luffing Angle Main & Aux. Winch Max. Line Speed Rated Line Pull Max. Line Pull Wire Rope Wire Rope Length Brake Type Free-Fall 2 t/4.0 m 91.4 m 2 t/9.8 m 76.2 m +. m t/9.8 m 61.0m + 1.8 m, 1.8 m + 63 ~ 1 m/min (1st layer) 132 kn (13. tf) 2 kn ( tf) mm 480 m (Main) 38 m (Aux.) Wet-type multiple disc brake Option Working Speed Swing Speed 2.1 min -1 (rpm) Travel Speed 1.1/0.7 km/h Power Plant Model Mitsubishi 6D24-TLU2D Engine Output 2 kw/2,000 min -1 (rpm) Fuel Tank Capacity 0 liters Hydraulic System Main Pumps 4 variable displacement Max. Pressure.9 MPa (3 kgf/cm 2 ) Hydraulic Tank Capacity liters Self-Erection Device Standard Weight Operating Weight Approx. 8 t Counterweight 80.6 t (Upper), 2 t (Lower) Transport Weight 44.9 t (Main machine) Ground Pressure 9 kpa (0.97 kgf/cm 2 ) GENERAL DIMENSIONS Unit: mm R6,000 1,0 Crane boom length:.2 m 9 3,6 *Transportation width: 3,0 (Swing Away Cabin) 2, 6,7 3,8 1,3 1,2 4 7,7 8,8 7,2
MAIN BOOM LIFTING CAPACITY Rated loads in metric tons for 3 working area (Counterweight: 80.6 t, Carbody weight: 2 t) Crawlers fully extended Boom length Working radius (m) 4.0.0 8.0 9.0 1 12.0 1 18.0 2 24.0 2 28.0 3 32.0 34.0 3 38.0 4 42.0 44.0 4 48.0 2.0 4.0 8.0 6 64.0 6 68.0 7 72.0 74.0 7 78.0 80.0.2 () 18.3 () 21.3 () 24.4 (80) 2 (90). (0) 33. (1) 36.6 (1) 3 (1) 42.7 (1).7 (1) 4 (1) 1.8 (1) 4.0/ 4.7/8. 199.7 199.7.2/188.4.6/176.4 167.7 167.7 167.7 16 6.1/9.9 6.6/14 144.2 144.2 144.2 144.2 143.2 141.3 7.1/139.4 7./1.3 12 12 12 126.2 126.2 126.2 124.4 124.3 8.0/122.9 8./ 112.2 112.2 1 1 112.2 1 111.0 1.8 9.0.9 9.0/3.0 9./9.1 9.9/8 1.3 1.2 1.2 1.2 1.2 0.2 99.8 97.3 94.7 92.3 9 87.6.4/82.7.9/77.1 11.4/72.0 11.8/67.6 83.7 83.7 83.7 83.7 83.7 83.7 83.4 81.7 79.7 7 7 74.4 72. 71.0 69.3 68.0 66.4 /63. 12.8/9.8 13.3/6.4 13.7/3. 69.7 69.7 69.7 69.7 69.7 69.7 69.7 6 67.3 6 64.3 63.0 61.6.4 9.0 6.6 4.3 3.2 2.2 /.4 14.7/47.7.2/.2.7/38.9 14.8/6.7.7 9.7 9.0 9.0 8.0. 4. 3.2 2.2 1.0.2 4 4 4 4 4 44. 43. 42.6 3 16.1/34.9 17./4.1.7.0.1/44.7.7 44.7 39. 22.7/3.7 44.3 3 34.9 2/32..7 44.0 3 34.6 31.1 28.0/2.3 43.6 38.4 34.1.7 2.3.7/.3 43.6 38.4 34.1.7 27.7.3 23.1 33.3/ 43.3 3.3 2 24.9 22.8.9.9/19.4 49.7 43.0 3 33. 3 27.1 22.4.6 19.0 17.6 3/1 4 42.8 37. 33.2 29.7 2 24.3 22.1.3 18.7 1 1 41.2/.3 4 42.4 37.3 33.1 2 26.6 24.1.1 18. 17.1 1 14.7 43.8/13.7 41.4 3 32.7 2 2 23.8 21.6 19.7 1 1 1 46./ 4.6 36.4 32. 29.0 26.1 23.6 21.4 19. 1 16.4.2 13.0 4/.8 44.8 39.7. 32.0 28.7.7 23.2 21.0 1 17. 16.1 14.8 13.6 12.6 11.7.8.1 1.8/9. 44.1 3.0 31.6 2.7 23.1 21.0 1 1 1 14.7 13..7 9.9 4.4/8. 43.1 38.3 34.2.8 2.3 22.8.6 18.7 17.1.6.3 8.9 7.6 / 42.2 3 33..1 27.3 24.8 22..3 18.4 1.3 12.9 11.8.9 1 9.3 7.3 9.7/ 41.4 3 32.9 2 2 24.3.1 1 16.6.1 13.8 12.6.7 9.8 9.0 8.3 7.6 6.. 62.3/.7 36.1 32.2 29.0 26.2 23.8 21.7 19.9 18.0 16.4 14.9 13.6 11.4..3 4.8 /4.6 39.9 3 31.7 28. 2 23.4 21.3 19. 1 16.2 14.7 13.4.3 9.4 6.6..0 4.6 4.1 67.6/3.8 3 34.7 31.0 2.1 22.8.8 18.9 17.3.9 14. 12.0.9 1 8.3 7.6 6.9.7.2 4.7 4.3 3.8 3. 3.1.2/3.1 3 33.9.2 27.1 24..2 18.4 1.3 12.8.6 8.0 6.6 4.9 4.4 3.9 3. 3.1 2.7 2.4 72.9/2.2 37. 33.2 2 26.6 24.0 21.7 19.7 1 16.4 14.9 13.7 11.4.4 9.4 6.4.2 4.7 4.2 3.7 3.3 2.9 2. 2.2 1.9 7./1.6 34.8 31.8 28.9.9 23.3 21.1 1 1 1 14.4 12.0 11.0 1 4.8 4.3 3.8 3.4 2.9 2. 2.2 1.8 1. 1.2 0.9 31.9 2 26.6 24. 22.. 1 16.9.3 13.9 12.7 11.. 8.7 7.1 6.4.7.1 4.6 4.0 3. 3.1 2.6 2.2 1.9 1. 1.2 7/0.9 7/0.9 Note: 1. Rating according to DIN 118-3 and pren 100. 2. Rating shown in are determined by the strength of the boom or other structural components. 3. Instruction in the operator s manual must be strictly observed when operating the machine. 4.9 (180) (190) 61.0 (0) 64.0 (2) 67.1 (2).1 (2) 73.2 (2) 76.2 (2) 7 (2) 82.3 (2) 8.3 (280) 88.4 (290) 91.4 (0) 1 FIXED JIB LIFTING CAPACITY (counterweight: 80.6 t, carbodyweight: 2 t, without main hook) Jib Offset Angle: Jib Offset Angle: Boom length 2 m 1.8 m 76.2 m Jib length 12.2 m. m 12.2 m. m 12.2 m. m 9.0 m 1 m 12.0 m m 1 m 18.0 m 2 m m 24.0 m 3 m m 8.0 m m 6 m 7 m 74.0 m 78.0 m 82.0 m 8 m 9 m 94.0 m 98.0 m 9.8 m/2 2 m 33. m 3 m.7 m 1.8 m 2 2 m 33. m 3 m.7 m 1.8 m. 2 m 13.6 m/2 3 m.7 m 1.8 m 24.3 m/6.1 2 3 m.7 m 1.8 m 23.0 1 m/6.9.9 3 m 1 m/2 1.8 m 21.8 6..1 19.8 m/6.9 2 1.8 m.7 6.2 24.4 6.9 26.1 1.8 m 19.8.9 23. 6.6. 23.6 m/ 18.9.6 22.8 24.9 1.3 22.1 6.1 24.4 6.6 17.3.1 21..9 23.9 6.4 1 4.9.9.7 21.7 6.2. 4. 19.7.3 18.3.9 37.1 m/14. 4.1 17.7.0..6 9.8 m/2 3.8.2 4.7 13.0.3 2 3. 13.1 4.4.9.0 9.8 m/2 3.2 11.4 4.1 4.8 2 3.0 1 3.9 4. 9.8 m/2 4.6 m/3.0 3.7 6. 4.3 2 2 m 8.3 m/8.7 3.. 4.1 9.8 m/2 2 m 33. m 3.3 4.6 3.9 2 2 m 33. m 3.2 3.7 3.8 9.8 m/2 2 m 33. m 3.0 3.0 3.6 2 2 m 33. m 7.7 m/3.0 2.4 3. 9.8 m/2 2 m 33. m 3.0 79.3 m/2.2 3.0 2 2 m 33. m 7.7 m/3.0.7 m 2. 9.8 m/2 2 m 33. m 3.0.1 m/2.0 2.0 2 2 m 33. m 7.7 m/3.0.7 m 1. 9.8 m/2 2 m 33. m 3.0.1 m/2.0 9 m/1.2 Boom length 2 m 1.8 m 76.2 m Jib length 12.2 m. m 12.2 m. m 12.2 m. m 12.0 m m 1 m 18.0 m 2 m m 24.0 m 3 m m 8.0 m m 6 m 7 m 74.0 m 78.0 m 82.0 m 8 m 9 m 94.0 m 98.0 m m 13. m/19. 2 m 33. m 3 m.7 m 1.8 m 19.3 2 m 33. m 3 m.7 m 1.8 m 18.7 2 m 17.3 m/19.4 3 m.7 m 1.8 m 1 m/6.1 19.3 3 m.7 m 1.8 m 1 1 m/6.9 18.9 3 m 21.1 m/19.3 1.8 m.9 6. 18. 19.8 m/6.9 1 1.8 m.2.3 m/4.2 18.0 6.9 18.9 1.8 m 14. 4.1 17.3 6.6 18.7 23.6 m/ 13.9 4.0 1 2 m/4.2 18.4 13.4 3.8 16.2 4.1 18.0 32.9 m/4.1 12.7 3..2 3.9 1 4.1 3 m/12.4 3.3 14.4 3.7 16.2 3.9. 3.1 13.7 3. 13.6 3.7 37.1 m/14. 2.9 3.3 11. 3.6 9.8 m/2 2.8 11.7 3.2 9.7 3.4 2 2.7.2 3.0 3.3 9.8 m/2 6.4 m/2.7 8.9 2.9 6.9 3.2 2 3.0 9.0 m/ 2.8 3.1 9.8 m/2 4.6 m/3.0 2.8 4.8 3.0 2 2 m 8.3 m/8.7 2.7 3.9 2.9 9.8 m/2 2 m 33. m 2.7 3.2 2.8 2 2 m 33. m 77.6 m/2.7 2. 2.8 9.8 m/2 2 m 33. m 3.0 80.1 m/2.2 2.7 2 2 m 33. m 7.7 m/3.0 2.4 2.7 9.8 m/2 2 m 33. m 3.0 80.1 m/2.2 2.3 2 2 m 33. m 7.7 m/3.0.7 m 1.7 9.8 m/2 2 m 33. m 3.0.1 m/2.0 1.3 2 2 m 33. m 7.7 m/3.0.7 m 98.7 m/1.2
LUFFING JIB LIFTING CAPACITY (Boom Angle Fixed Type and ) CKE Boom length 21.3 m 24.4 m Jib length 24.4 m. m 42.7 m 1.8 m Boom Angle 12.0 m m 1 m 18.0 m 2 m m 24.0 m 3 m m 61.4.1 47. 4 34.4 3 26..7 9.7 3.8 47.3 39.9 34.4 3 26. 22.9 61.4.1 4.3 34.7.3 2 23.9 21. 19. 4.7.0.6 27.1 24.2 21.8 17.3..2 3 34.6 31.2 27.6.1 1 13.1 37.1 34.6 31.2 27.6 18.3 1 2 27.7.6 23.8.9 1 18. 16.6 14.1 11.9 23.0 21..2 1 17.1. 13.3 11.0 17.7 1.1 14.1 13.1 11..2 2.1 13.1.8 6. 9.8 8.4. 4.2 3.2 2.3 2 11.0.7 6.2 4.8 3.7 2.7 1.8 24.4 m. m 42.7 m 1.8 m 61.4 61.4. 4 3.2 4.4 2.3 4.6 46.4 37.3 27.7 1 34.6.7 34.9 41.2 34.7 37.6.7 16.4 9.8.2.3..9 31.4.0 23.9 24.9.2 2 2 26.6.7 26.9 31.3 27.7 31.9 22.3 23.2 14.1.1 8.4 11.0.7 27.1 24.0 27.7 24.7 2.9 21.8 13.1.7 9.7 24.0 21.6 24.7 22.3.1 19.7. 19..2 22.6 1 19.3 11. 12.4 7.3 1 1 1 1 17.3.2.9. 13.3.6 14.1.7 9.7 4.2 4.9 13. 8.7 3.2 3.8 11. 2.3 2.8 7.1 1.9 6. Boom length. m Jib length 24.4 m. m 42.7 m 1.8 m Boom Angle 12.0 m m 1 m 18.0 m 2 m m 24.0 m 3 m m 61.4 6.1 4.9.1. 26.9 23.3 9.7 1.8 46.2 41.6 3 32.2 2.0 61.4 3. 4 41.2.3.8 2 24.2 21.7 1 44.3 4 36.4 32.8 2.6 23.0 18.7.. 37.6 34.9 31.8 28.0.0 22.4.3 16.9 13.7 38..0 32.1 29.4 26.1 23.4 1 16.1 2 2 2 24.0 22.4 21.0 19.7 1 1.6 23.8 22.3.9 19.7 17.6.9 13.9 11.9 1 16..3 11..2 2.1 14.6 13.6 12.7 11.1 9.9 6. 9.8 8. 7.3.6 4.3 3.2 2.3 2 11.0.7 7. 6..1 3.9 2.9 2.0 24.4 m. m 42.7 m 1.8 m 3. 61.4 3. 3.. 4 49.4 4. 29.7 41. 44.1 41.8 46.4 3 2 18.0. 39.8 3 3.1 37.6 2 16.6 9.8.8 3 31.1 34.8 32.2 33. 24.1 24.9.3 2 2 27.1 32.9 2 31.9 28.3.7 22. 24.4.1 8. 11.0 23.9 29. 24.4 29..2 28.3 21.1 22.8 13.3 14.9.7 9.7 2 21.9 2 22.6 2 19.8 21.3 12.4 13.9 7.3 23.1 19.7 23.8.4 24.3 18.7.1 12.9 7.7 19.4 1 19.8 1 1.2 11.4.6 6.6 14.1 16. 16.2 1 4.3 13.9 9.0 3.2 4.1 12.2 8.0 2.3 3.1 7.3 2.2 6.6 Boom length 42.7 m 4 m Jib length 24.4 m. m 42.7 m 1.8 m 24.4 m. m 42.7 m 1.8 m Boom Angle 12.0 m 3. 61.4 61.4. 61.4 m 3. 2.0.... 1 m 49.4 1.8 47.3 39.9 29.7. 3.2. 3 2 29.7 18.0 m 42.2 42.0 42.4 44.3 3 28.3 1. 4 39.9. 46.4 36.9 28. 1 2 m 3 3 36.2 36.4.3 38. 26.1 1 9.8 36. 36.1 3 41.2 34.6. 2 1 m 31.2 34.6 31. 33.2 32. 31.9 24.3.6 1 2 9.3 2 31. 33.0 31.8 31.6 32..0.4 24.4 24.9. 2 24.0 m 2 31.8 27.7.4 2 29.3 22.6.0.1 11.0 27.6.3 2 29.0 28.9 2 22.7 23.2.7 14.4.1 3 m m 24.2 9.7 29.4 2 24.3 19.8 2 26.1 24.4 2 2 22.8.6 17.1 2.1 23.4. 1 21.2 19.9 18.7 1 12.2 23.3 21.8. 1 16.4 14.6 13.3 12.4.3 6.1 14.6.2.7 4.4 3.3 2.3.7.6 4.3 3.2 2.3 24.4 2 26.1 24.2 24.8 19.9 2 24.9 23.2. 16.9.7 23.0.8 1 14.4.7 23.9 19. 1 14.7 21.3 2 1 1 12.2 23.9 22.3.9 1 16. 14.8 12.8 6.1 13.4 11.7.3 6.1 14.6 13.6 11.8.4 9.3 8.3 7. 8.0 m 2.3 6.2 1 9.3 2.1 7.7 6.6.7 4.1 2.7 4. 3.4 2.4 Boom length 4.9 m Jib length 24.4 m. m 42.7 m 1.8 m. m 42.7 m 1.8 m Boom Angle m. 61.4. 33. 61.4 1 m.2 39.7. 32.2.2 2. 18.0 m 3 36.2 31.6 2 27. 1.8 2 2 29.7 2 m 4 34.3 33.3 46.4.9 26. 16.9.3 42.0 24.9 44.3 24. 1 m 31.3 31.3.8 41.2 29.9 3 37.6 24..6 23.3 2 23.0 36.4 22.6 38..7 24.0 m 28.3 2 2 27. 2 26.4 22.8 24.9 14. 2 21.7 2 21.3.9 31.9 14..6 3 m.0.7 26.6 24.8 23.2 2 22.7.4.6 2 23.6 19.4 17..9 23.2.9 17.3 14. 24.4 22.6 21.1 18. 16. 21.4 2 18.9 16.9 14.4 24.3 22.6 21.1 18. 16. 13.4 11.7.3.1.0 13.9.6.2 19.0 1 1 23.7.4 1 16.1 19.8 18. 1. 14.1 22.7 21.1 1 17.3 1 19.4 1 1.0 13. 22.4.7 19.3 1 14.9 13. 12.6 11.8.4.0 23.3 12.4.8 m 8.0 m 14.9 14.8 13.1 6.1 9.4 8.4 7.6 6.9 13.9 12.2 13.4 6.1 7.7 6 m 6.1 Note: 1. Rating according to DIN 118-3 and pren 100. 2. Rating shown in are determined by the strength of the boom or other structural components. 3. Instruction in the operator s manual must be strictly observed when operating the machine. 2
BOOM & JIB ARRANGEMENT CRANE BOOM ARRANGEMENT Boom length Boom arrangement.2 () Base-Tip 18.3 () Base-A-Tip 21.3 () Base-A-A-Tip, Base-B-Tip 24.4 (80) Base-A-B-Tip 2 (90) Base-A-A-B-Tip, Base-D-Tip, Base-B-B-Tip. (0) Base-A-B-B-Tip, Base-A-D-Tip 33. (1) Base-A-A-B-B-Tip, Base-A-A-D-Tip, Base-B-D-Tip 36.6 (1) Base-A-B-D-Tip 3 (1) Base-A-A-B-D-Tip, Base-D-D-Tip, Base-B-B-D-Tip 42.7 (1) Base-A-B-B-D-Tip, Base-A-D-D-Tip.7 (1) Base-A-A-B-B-D-Tip, Base-A-A-D-D-Tip, Base-B-D-D-Tip 4 (1) Base-A-B-D-D-Tip 1.8 (1) Base-A-A-B-D-D-Tip, Base-B-B-D-D-Tip, Base-D-D-D-Tip 4.9 (180) Base-A-B-B-D-D-Tip, Base-A-D-D-D-Tip (190) Base-A-A-B-B-D-D-Tip, Base-A-A-D-D-D-Tip, Base-B-D-D-D-Tip 61.0 (0) Base-A-B-D-D-D-Tip 64.0 (2) Base-A-A-B-D-D-D-Tip, Base-B-B-D-D-D-Tip, Base-D-D-D-D-Tip 67.1 (2) Base-A-B-B-D-D-D-Tip, Base-A-D-D-D-D-Tip.1 (2) Base-A-A-B-B-D-D-D-Tip, Base-A-A-D-D-D-D-Tip, Base-B-D-D-D-D-Tip 73.2 (2) 76.21.3 (2) 79.31.1 (2) Base-A-B-D-D-D-D-Tip Base-A-A-B-D-D-D-D-Tip, Base-B-B-D-D-D-D-Tip, Base-D-D-D-D-D-Tip Base-A-B-B-D-D-D-D-Tip, Base-A-D-D-D-D-D-Tip 82.31.3 (2) Base-A-A-B-B-D-D-D-D-Tip, Base-A-A-D-D-D-D-D-Tip, Base-B-D-D-D-D-D-Tip 8.31.1 (280) Base-A-B-D-D-D-D-D-Tip 88.41.3 (290) Base-A-A-B-D-D-D-D-D-Tip, Base-B-B-D-D-D-D-D-Tip 91.41.1 (0) Base-A-B-B-D-D-D-D-D-Tip Base Boom Length and Boom Tip Length Base = m ('), Tip = 8.3 m (27') Insert Boom A = 3.0 m ('), B = 6.1 m ('), D = 12.2 m (') FIXED JIB ARRANGEMENT Jib length 12.2 () 18.3 () 24.4 (80). (0) Jib arrangement Base-A-Tip Base-A-B-Tip Base-A-B-B-Tip Base-A-B-B-B-Tip Base Jib Length and Jib Tip Length Base = m ('), Tip = 8.3 m (27') Insert Jib A = 3.0 m ('), B = 6.1 m (') LUFFING BOOM ARRANGEMENT Boom length 21.3 () 24.4 (80) 2 (90). (0) 33. (1) 36.6 (1) 3 (1) 42.7 (1).7 (1) 4 (1) 1.8 (1) 4.9 (180) (190) 61.0 (0) Boom arrangement Base-A-B-Cap Base-A-A-B-Cap, Base-B-B-Cap, Base-D-Cap Base-A-B-B-Cap, Base-A-D-Cap Base-A-A-B-B-Cap, Base-A-A-D-Cap, Base-B-D-Cap Base-A-B-D-Cap Base-A-A-B-D-Cap, Base-B-B-D-Cap, Base-D-D-Cap Base-A-B-B-D-Cap, Base-A-D-D-Cap Base-A-A-B-B-D-Cap, Base-A-A-D-D-Cap, Base-B-D-D-Cap Base-A-B-D-D-Cap Base-A-A-B-D-D-Cap, Base-B-B-D-D-Cap, Base-D-D-D-Cap Base-A-B-B-D-D-Cap, Base-A-D-D-D-Cap Base-A-A-B-B-D-D-Cap, Base-B-D-D-D-Cap, Base-A-A-D-D-D-Cap Base-A-B-D-D-D-Cap Base-A-A-B-D-D-D-Cap, Base-B-B-D-D-D-Cap Base Boom Length and Luffing Boom Cap Length Base = m ('), Cap = 8.3 m (27') Insert Luffing Boom A = 3.0 m ('), B = 6.1 m ('), D = 12.2 m (') LUFFING JIB ARRANGEMENT Jib length 21.3 () 24.4 (80) 2 (90). (0) 33. (1) 36.6 (1) 3 (1) 42.7 (1).7 (1) 4 (1) 1.8 (1) 4.9 (180) (190) Jib arrangement Base-A-B-Tip Base-A-A-B-Tip, Base-B-B-Tip, Base-D-Tip Base-A-B-B-Tip, Base-A-D-Tip Base-A-A-B-B-Tip, Base-B-D-Tip, Base-A-A-D-Tip Base-A-B-D-Tip Base-A-A-B-D-Tip, Base-B-B-D-Tip, Base-D-D-Tip Base-A-B-B-D-Tip, Base-A-D-D-Tip Base-A-A-B-B-D-Tip, Base-B-D-D-Tip, Base-A-A-D-D-Tip Base-A-B-D-D-Tip Base-A-A-B-D-D-Tip, Base-B-B-D-D-Tip Base-A-B-B-D-D-Tip Base-A-A-B-B-D-D-Tip, Base-A-A-D-D-D-Tip, Base-B-D-D-D-Tip Base-A-B-D-D-D-Tip 61.0 (0) Base-A-A-B-D-D-D-Tip Base Luffing Jib Length and Luffing Jib Tip Length Base = m ('), Tip = 8.3 m (27') Insert Luffing Jib A = 3.0 m ('), B = 6.1 m ('), D = 12.2 m (') 3
CKE WORKING RADIUS CRANE BOOM FIXED JIB (Jib Offset Angle:, ) 91.4 m boom 88.4 m boom 8.3 m boom 82.3 m boom 7 m boom 73.2 m boom.1 m boom 67.1 m boom 64.0 m boom boom m boom 4.9 m boom 1.8 m boom 4 m boom.7 m boom 42.7 m boom 3 m boom boom 33. m boom. m boom 2 m boom 24.4 m boom 21.3 m boom 18.3 m boom.2 m boom Center of rotation 1.4 m 81 7 6 98 96 94 92 90 88 86 84 82 80 78 76 74 72 68 66 64 62 8 6 4 2 48 46 44 42 38 36 34 32 28 26 24 22 18 16 14 12 8 6 4 4 6 8 12 14 16 18 22 24 26 28 32 34 36 38 42 44 46 48 2 4 6 8 62 64 66 68 72 74 76 78 80 2.3 m Radius from center of rotation (m) Height above ground (m) +. m jib +24.4 m jib +18.3 m jib +12.2 m jib 2 m boom +. m jib 2 m boom +24.4 m jib 2 m boom +18.3 m jib 2 m boom +12.2 m jib +. m jib +24.4 m jib +18.3 m jib +12.2 m jib 2 m boom +. m jib 2 m boom +24.4 m jib 2 m boom +18.3 m jib 2 m boom +12.2 m jib Center of rotation 1.4 m 2.3 m 81 Radius from center of rotation (m) 6 7 1 0 9 90 8 80 7 6 80 8 90 Height above ground (m) LUFFING JIB 1.8 m 4 m.7 m 42.7 m 3 m 33. m. m Boom Angle: 88 7 7 1 1 0 9 90 8 80 7 Boom Angle: 63 1.8 m 4 m.7 m 42.7 m 3 m 33. m. m 1 1 0 9 90 8 80 7 3 m 33. m. m 2 m 24.4 m 21.3 m 1.8 m 4 m.7 m 42.7 m m 4.9 m 6 Height above ground (m) 42.7 m 3 m 33. m. m 2 m 24.4 m 21.3 m 1.8 m 4 m.7 m m 4.9 m 6 Height above ground (m) 6 7 6 7 80 8 Radius from center of rotation (m) Radius from center of rotation (m) 2.3 m 1.4 m Center of rotation 2.3 m 1.4 m Center of rotation 4
SPECIFICATIONS OF PARTS AND ATTACHMENTS Dimensions: mm Weight: kg Base Machine Weight: 44,900 kg Width: 3,0 mm 13,638 3,0 Boom Base Weight: 3,2 kg 1,7 7,8 2, 2,337 Jib Top (For Crane) Weight: 3 kg 1,0 8,0 Crawler Weight: 23,0 kg 8,8 1,36 1,2 Boom Top Weight: 3,138 kg (with guy cables) 2, 2,337 2,4 Travel Kit Assembly Weight: 6,000 kg 3,1 11,3 Gantry Weight: 2,9 kg,89 Mast Weight: 2,9 kg,66 1,7 1,6 1,800 80 Insert Boom 2,312 2,337 8,323 L L (mm) Weight (kg)* 3.0m 3,17 776 6.1m 6,223 1,292 12.2m 12,3 2,243 *with guy cables Luffing Main Boom Top Weight: 1,890 kg 3,163 1,983 1,7 Luffing Taper Insert Boom Weight: 1,0 kg 2,872 2,337 2,223 3,699 1,737 Carbodyweight A Weight: 4,37 kg x 2 pieces Carbodyweight B Weight:,6 kg x 2 pieces Jib Base with Strut (For Crane) Weight: kg Width: 1,0 mm Luffing Jib Base Weight: 1,1 kg 666 428 1,6 2,672 Counterweight A Weight: 12,0 kg 4,192 1,0 4,081 Counterweight Type 1 Counterweight Type 2 1,78 2,088 Counterweight A Weight: 12,6 kg 666 4,192 1,242 1,2 2,088 1,7 Luffing Jib Top Weight: 1,1 kg 1,3,972 Front Strut (Luffing Jib) Weight: 1,1 kg 622 1, 1,480 9,88 6,9 1,490 1,3 1,6 1,216 480 Counterweight B, C Weight:,6 kg x 6 x 2 pieces 4 1,78 1,0 Counterweight B, C Weight:,000 kg x 3 x 2 pieces 728 1,7 1,9 Counterweight D, E Weight: 3,7 kg x 2 pieces 1,7 1,9 Rear Strut (Luffing Jib) Weight: 1,1 kg 66 690 1,79 480 908 38 8,138
CKE TRANSPORTATION PLAN (Main Boom + Luffing Jib 1.8 m, Counterweight: Type 1) Configuration Description Total Weight No.1 Low Loader 4,0 13,0 Base Machine = Including 3rd winch Translifter All wire ropes 44.90 ton 800 No.2 & No.3 Tent Side Truck 13,6 3,900 2,6 1,3 8,8 Crawler = 23. ton 1,280 No.4 & No. Flat Bed Trailer 3,9 1,280 2,6 Counterweight (4 x.63 ton) = ft Main Boom x 1 = ft Luffing Jib x 1 = 22.2 ton 2.24 ton 0.96 ton.72 ton No.6 Flat Bed Trailer 3,880 1,280 2,0 Counterweight A x 1 = ft Main Boom x 1 = ft Luffing Jib (2 x 0.4 ton) = Carbodyweight A (2 x 4.38 ton) = 12.89 ton 2.24 ton 1.08 ton 8.76 ton 24.97 ton No.7 Tent Side Truck 3,900 2,6 13,6 ft Main Boom (2 x 0.74 ton) = ft Main Boom x 1 = ft Luffing Jib Insert x 1 = 1.48 ton 1.29 ton 0.31 ton 3.08 ton 1,280 No.8 Tent Side Truck 3,900 2,6 13,6 Luffing Jib Top x 1 = Luffing Taper x 1 = Counterweight (4 x.63 ton) = 1.17 ton 1.03 ton 22.2 ton 24.72 ton 1,280 No.9 Semi Loader 4,1 3,1 11,0 Travel Kit = Carbodyweight B (2 x.63 ton) = 0 ton 6 ton 16 ton 1,000 Note: This transport plan depends on your specification of trailer and the areas or countries where you transport. 6
OTHER ATTACHMENTS CKE Attachments Boom backstop 3.0 m ( ft) Insert jib 6.1 m ( ft) Insert jib 3.0 m ( ft) Insert Luffing jib 6.1 m ( ft) Insert Luffing jib 12.2 m ( ft) Insert Luffing jib Luffing jib backstop Strut backstop (luffing jib) Auxiliary sheave Auxiliary sheave (luffing jib) Luffing jib drum Ball hook -ton hook -ton hook 0-ton hook Weight 680 kg 1 kg 190 kg 3 kg kg 9 kg 180 kg 180 kg 276 kg 380 kg 1,4 kg 4 kg 900 kg 1,0 kg 1,800 kg Dimensions (L x W x H) 7,0 mm x 997 mm 3,128 mm x 1,0 mm x 8 mm 6,17 mm x 1,0 mm x 8 mm 3,16 mm x 1,490 mm x 1,290 mm 6,2 mm x 1,490 mm x 1,290 mm 12, mm x 1,490 mm x 1,290 mm 3,7 mm x 346 mm x 226 mm 3,7 mm x 268 mm 1,080 mm x 9 mm 1,012 mm x 893 mm x 914 mm Lower spreader 0 kg 1,3 mm x 1, mm x 0 mm 1,696 mm x 1,0 mm x 1,063 mm 1,0 mm x 380 mm dia. 1,7 mm x 36 mm x 0 mm 1,8 mm x 384 mm x 0 mm 2,0 mm x mm x 0 mm 1-ton hook 2,0 kg 2,66 mm x 7 mm x 0 mm 2-ton hook 4,0 kg 2,8 mm x1,616 mm x 7 mm Note: Due to our policy of continual product improvements all designs and specifications are subject to change without advance notice. 17-1, Higashigotanda 2-chome, Shinagawa-ku, Tokyo 141-8626 JAPAN Tel: ++81 (0) 3-789-21 Fax: ++81 (0) 3-789-3372 Bulletin No. CKE-S2 0400TF Printed in Japan