TriPod Safety Coupler Installation & Operating Instructions for Models TP4, TP5, TP6, and TP7

Similar documents
Installation, Operation, Maintenance Manual For Quick-Jaw Models AL363, L364 & AL366

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

Accu Max Limited Warranty

1.0 - OPENING AND CLOSING THE DOOR

Hotspotter. Model WB-100 Professional Series. Assembly, Testing & Operating Instructions. Safety Information:

HP-104 & HP-106 Tapping Machine OPERATIONS MANUAL

Beverage Systems. Component Inspection and Service TSB-Y Date: Subject: Products Affected: Description: July Inspection of CO 2

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Full Internal Relief Valves Instruction Manual

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

OPERATING AND MAINTENANCE MANUAL

Float Operated Level Controllers

PRODUCT SERIES: A-SF-3000BD

2 NPT MULTI-PORT RELIEF VALVE MANIFOLD SERIES INSTRUCTION MANUAL

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

1 DRIVE INDUSTRIAL IMPACT WRENCH

ACME Connectors and Fittings Extended Type Hose Couplings for Vapor and Liquid Service A7571 and A7575 Series

Pressure Dump Valve Service Kit for Series 2300 Units

INSTALLATION INSTRUCTIONS MANUAL ON/OFF SAFETY VALVE/PILOT KIT MODEL GA9050A-1 (F0235)

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Product Information News

Operation Manual Guillotine Cutter RC-5

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Pressure Regulators. Operating Instructions. Instrumentation

Industrial Refrigeration Control Valves. Catalog C12-PVS Parker Valve Station (PVS) Sizing Guide

Installation and User Manual

LITTLE MAX MODEL 50G 50,000 BTU PROPANE TORCH

Installation, Operation and Maintenance Manual for Back Pressure Regulator

GAS CONVERSION KIT Installation Instructions Range/Rangetop

MEGR-1627 Instruction Manual

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

PR4 Installation, Operation & Maintenance Instructions (DOT Certification Included)

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Model MC Circuit Setter Hose Kits Supply Valve Options: Ball Valve, UBY

Section 3- Repair and Calibration Procedures

MAINTENANCE PROCEDURE FOR X 650

GETZ EQUIPMENT INNOVATORS RECOVERY SYSTEM CLEAN AGENT FE-36 / HALOTRON 1 PART NO. 4G59751 OPERATIONS MANUAL

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Types 749B and R130 Changeover Manifolds

1800C and 1800C-HC Series Service Regulators

Bulletin 2533-M3/USA Service Bulletin. Series PR25MA, PR25P, PR25S, PR32P, PR32S. Effective: July 1, Pilot Operated Pressure Reducing Valves

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

3/8" Dr. Air Butterfly Impact Wrench

Retractable Hose Reel with 3/8" x 50' PVC Hose

User Instruction Manual

Carbon Fiber Tank with EZ Fill system Fill pressure 4,500 psi (310 bar) Output: up to 4,500 psi (310 bar)

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

Booster Pump PB4-60 Replacement Kits

ELKHART BRASS MANUFACTURING COMPANY

Installation Instructions WARNING: WARNING: WARNING: LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS

5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS

2.0 INSTALLATION & SERVICE

Constant Pressure Crude Oil Container Model CPCCP

BGA158 Series CE Approved Class A Shutoff Gas Valve

Instruction Manual Updated 7/26/2011 Ver. 2.2

Pressure Dump Valve Service Kit for Series 3000 Units

PDY TON HYDRAULIC CRIMPING TOOL WARNING

Natural Gas Conversion Kit

Irrigation System Winterization and Pressurization Procedures

TECHNICAL DATA CAUTION

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

BGA158 Series CE Approved Class B Shutoff Gas Valve

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

H4802, H4802-1, H , and Pole Tampers

RegO Adapters, Connector, & Fittings

G96 Series BASOTROL Dual Operator Valve

1200B2 Series Service Regulators. Instruction Manual

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

453 Series Steam Heated Vaporizing Regulator

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

BUTTERFLY VALVES Series 800

MMR Air Mask With. with Quick-Connect Hose

G92 Series BASOTROL Automatic Pilot Gas Valve

Installation Instructions and valve Maintenance Rev. 0 of 21/09/15

4400 TwinHybrid Gas Seal

MUELLER GAS. No-Blo Operations Using D-5. Drilling Machine. Reliable Connections. General Information 2

Halsey Taylor Owners Manual STOP!

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Operation Manual. Carbon Filtration Industrial Drive, Orlinda, TN fax

VB-7263 Series. Application. Features. Applicable Literature

Installation Instructions

Poppetted Coaxial Drop Tube Assembly for use with Auto Limiter II. Installation Instructions

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Service and Repair Manual

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

SPECIFICATIONS CAPACITY

Operation Manual Piston Sensed Gas Pressure Regulators

V-24 OXYGEN LANCE VALVE

OPERATING INSTRUCTIONS AND OWNER S MANUAL READ AND FOLLOW ALL INSTRUCTIONS

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation, Operation, and Maintenance Manual

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

BGA158, BGA171 and BGA110 Series Shutoff Gas Valve

! WARNING. Before using this product read and understand instructions.

Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions

Transcription:

TriPod Safety Coupler Installation & Operating Instructions for Models TP4, TP5, TP6, and TP7 March 2014 Form FVC097 - Rev03 IMPORTANT: KEEP THIS DOCUMENT WITH THE PRODUCT UNTIL IT REACHES THE END USER. 1. Contact with or inhalation of Liquid Anhydrous Ammonia (NH 3 ) or of LP Gas can cause SERIOUS INJURY OR DEATH. 2. Before installation or removal of any coupler, the system must be purged of all product. 3. Personal Protective Equipment (PPE), safety gloves, goggles and clothing should be worn. 4. For proper handling and storage of NH 3, and Liquefied Petroleum Gas refer to ANSI Standard K61.1 and NFPA Pamphlet 58. 5. An abundant supply of fresh water should be available to provide immediate first aid treatment for exposure to NH 3 and LP-Gas. 6. To ensure long term safe operation, the manufacturer recommends that under normal service conditions this product should be inspected at least once every year and be repaired or replaced as required. TOOLS REQUIRED: Safety Equipment (i.e. Gloves, Goggles, and Clothing), 12 Adjustable Wrench, Adjustable Wrench, Allen Wrench, Torque Wrench, and Pipe Wrench(2). PRINCIPLES OF OPERATION The Tri Pod Safety Coupler is designed to provide pull away protection between the vapor hose and the bulkhead. It s non-destructive releasing mechanism will operate reliably with a pull away force in any generally horizontal direction. In addition, the torque needed to release the liquid and vapor Tri Pods is only 500 Ft.Lbs total, therefore the bulkhead does not normally require additional structural bracing. So in most cases, the Tri Pod can quickly be installed in existing bulkhead applications. All SS construction ensure long trouble free operating life. OPERATION INSTRUCTIONS The Tri Pod is typically installed on the bulkhead between the storage tank and the transport or bobtail. Figure 1 shows a TP1 Tri Pod in cross section. The Tri Pod Lower Housing Assembly A is tightened into the Bulkhead Fitting B. The Tri Pod must be installed in the vertical position for a horizontal pull to release the coupling. The Upper Housing Assembly D, has an Integral Bleeder C, which is used to vent trapped liquid after a pull away. The Upper Housing D, is threaded into the hose connection. The Upper Housing Assembly D is threaded at E to receive the catch nut F, which when tightened traps the Tripod Upper and Lower Housing Assemblies A and D, into sealing engagement. The Upper Housing D to Lower Housing A assembly seal is made by a O-Ring G which is located on the hardened stainless steel Ball Socket Joint H. The female half is part of the Upper Housing Assembly D, and the male half is part of the Lower Housing Assembly A. As the catch nut is tightened, it catches or contacts the outer tip of each of the three Tri Pod Legs J, which pulls the Tri Pod Lower Housing A, into contact with the Upper Housing D. The extent to which the catch nut is tightened will largely determine the force required, in the horizontal direction, to disengage the coupling. The outer surface of the Tri Pod Lower Housing Legs K, and the inner surface of the Catch Nut J also defines a ball socket that is larger than the inner sealing ball socket. The center point of the ball sockets are identical which allows the Tri Pod Lower Housing A to rotate without jamming until disengaged from the catch nut. 1 of 5

OPERATION INSTRUCTIONS Cont. The center section of the Tri Pod contains two spring loaded back checks L and M. They hold each other open in normal operation and are suspended in the flow stream by back check support members N and P which have thin legs to support the back check valves yet allow flow to occur around the stem supports. The mechanical operation of the Tri Pod during release is shown in Figure 2. A release is initiated when a horizontal force at point A (Due to pull away) over comes the frictional forces at both the inner and outer ball sockets B and C respectively. The amount of frictional force present was determined by the tightness of the Catch Nut F. As the Tri Pod Upper Housing pivots, the catch nut will rotate out of contact with one or two of the three Tri Pod legs D. While rotation is occurring the O-Ring E on the Inner Ball Socket B maintains the product seal until release occurs. After a maximum rotation of 25 degrees, the Tri Pod Upper Housing D and Catch Nut Assembly F will separate from the Lower Housing Assembly A. After release occurs the two all stainless steel spring assisted Back Check Valves A, will close very quickly to minimize product release as shown in Figure 3. The Back Check s A Viton/Teflon seat, provides a pressure tight seal. The Tri Pod Upper Housing D and Catch Nut F with the Back Check A closed, remains attached to the vapor hose and follows the pull away vehicle until stopped. After proper bleed down of the system as described under the Operating Instructions, the Upper Housing D and hose can quickly be reconnected to the Lower Housing Assembly A returning the fill station to operation. 2 of 5

INSTALLATION INSTRUCTIONS Bulkhead Requirements: Before starting installation, close the liquid and vapor ESV or main shut off valves between the Bulk Head and storage tank and vent all lines. The Bulk Head, (see Figure 4), must be equipped with a vertical connection for installing the liquid and vapor Tri Pods. The connections should be a minimum of 10 inches apart. These connections must be secured to the Bulk Head, and able to withstand a minimum pull-away A in Figure 4. torque of 500 Ft.lbs. This would be an equivalent of a 500 lbs. horizontal load on the TP1 fitting at the bulkhead connection NOTE: It is recommended that a 45 degree Tri Pod to hose adapter is used for both liquid and vapor Tri Pods as seen in Figure 4. This will reduce the chances of the Housing becoming entangled with obstacles during a pull away. CAUTION: The Transport or Bobtail piping must be strong enough to support Tri Pod pull away torque of 500 Ft.Lbs. CAUTION: Check that the area is free and clear of obstacles that hoses could hang on during a pull away from any direction Tri Pods currently come in four models for use in bulk head applications. (Refer to liquid propane bulk head IO&M manual when installing a TP4) Model TP4 TP5 TP6 TP7 Flow Capacity 300 GPM of LP at 10 PSI Differential Application Liquid Line Separation Torque Bulkhead/Transport 350 Ft.lbs 100 Ft.lbs 200 Ft.lbs 200 Ft.lbs 3 of 5

INITIAL INSTALLATION Properly installed bulk head piping must have an excess flow valve installed to protect the liquid and vapor lines. The flow capacity of a Tri Pod installed to protect a line must exceed the rating of the excess flow valve protecting that line. 1. Screw the lower housing assembly into the bulk head. If possible position the Bleed Valve Port in the opposite direction of the discona in Figure 5 with a pipe wrench, taking care not to damage the Bleed Valve s 1/4 NPT threads. nect (see Figure 2.) Tighten at location A must be attached to the bulk head. The Tri Pod will not operate properly if the Upper Housing D CAUTION: The Lower Housing is attached to the bulk head. D. 2. Attach the hose or coupling to the Upper Housing 3. Screw the catch nut down (off) until the internal threads are slightly exposed. (see B in Figure 6). NOTE: The Catch Nut is screwed down to this position so the back checks will not interfere with each D is placed on other when the Upper Housing A. the Lower Housing CAUTION: Check that the hoses connected to the Tri Pod will pull free in the event of a pullaway in all possible directions. 4. D over Set the Catch Nut and Upper Housing A Legs. While holding the the Lower Housing D in position, tighten the Catch Upper Housing Nut firmly by hand. D in a vertical NOTE: Be sure to hold the Upper Housing position while tightening the Catch Nut or the A will disengage. Lower Housing 5. Tighten the Catch Nut 1/8 turn with a pipe B on its wrench area as shown in wrench Figure 5. CAUTION: Do not over tighten the Catch Nut. It must be tight enough to not disengage with normal hose handling but should not be tightened past that point. 6. D. If it can be moved by hand, tighten the Catch Nut 1/16 Grab the hose fitting by hand and try to move the Tri Pod Upper Housing turn or less and try again. NOTE: Striking the hose fitting with the heel of your hand to see if it will move, is also a technique that can be used. 4 of 5

NOTE: If you are unsure about the tightness simply test what you have done by whipping the hose around to simulate handling and then pull on the hose to test the ease of disconnect. Reconnect, tighten and do a manual pull-away as many times as needed. No harm is done by operating the Tri Pod. 7. D is straight to the eye with the Lower Housing A. If not, loosen the Catch Nut by turning it Make sure the Tri Pod Upper Housing counter clock wise. Tap it straight and retighten the Catch Nut to its previous point. NOTE: If the Lower and Upper Housing A and D are not aligned properly there will be a flow restriction across the ball socket orifices. 8. 9. A. Close the Bleed Valve. Using Teflon tape or pipe sealant install the Bleed Valve into the Lower Housing Connect the liquid side of the bulk head application by using the IO&M manual included with the Tripod used in liquid installations. RECONNECTION AFTER PULL AWAY 1. 2. Close the liquid and vapor ESV or main shut off valves between the bulk head and storage tank. Close the hose end valves on both the liquid and vapor lines which are still attached to the transport or bobtail. CAUTION: Both the liquid and vapor lines are full of product which must be safely bled off. 3. Take the liquid and vapor hose assembly to a water tank (for trapped anhydrous ammonia) and bleed off the trapped product by opening the hose end valves slowly where the valve is held at least 12 inches under water. 4. A by slowly opening the Bleed down the product trapped between the ESV or main shut off valve and Tri Pod Lower Housing bleeder on the Tri Pod. CAUTION: Leave bleeders and hose end valves open until after the Tri Pod reconnection, otherwise pressure will build up in the cavity and discharge product when the back checks are opened during reconnection. 5. Inspect the bulk head, hose end valves, and hose, for signs of damage or cracking. A in FIGURE 6. If they are missing or 6. Inspect for the presence of the sealing O-Rings cut, replace them. NOTE: On a disconnect, it is not unusual for the sealing O-Ring to blow out of the ring groove and lodge at the base of the male ball lower housing. 7. Complete steps 3-7 in the Initial Installation Section of this manual. USER SAFETY RESPONSIBILITY STATEMENT FOR ALL PARKER PRODUCTS FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THE PRODUCTS DESCRIBED HEREIN OR RELATED ITEMS CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from Parker-Hannifin Corporation, its subsidiaries and authorized distributors provide product or system options for further investigation by users having technical expertise. The user, through its own analysis and testing, is solely responsible for making the final selection of the system and components and assuring that all performance, endurance, maintenance, safety and warning requirements of the application are met. The user must analyze all aspects of the application, follow applicable industry standards, and follow the information concerning the product in the current product catalog and in any other materials provided from Parker or its subsidiaries or authorized distributors. To the extent that Parker or its subsidiaries or authorized distributors provide component or system options based upon data or specifications provided by the user, the user is responsible for determining that such data and specifications are suitable and sufficient for all applications and reasonably foreseeable uses of the components or systems. 5 of 5