University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Similar documents
Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Station 1: Street & Sidewalk Upgrades

Foothill Expressway Improvements Between El Monte and San Antonio

Blair/Williamson Intersection Expressed Needs

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Figure 1: Vicinity Map of the Study Area

INNOVATIVE INTERSECTION DESIGN

1. Provide a dedicated westbound approach bus lane at the intersection;

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015

Lawrence Avenue Streetscape Concepts August 30, 2011

City of CENTER. Welcome! from I-694 to TH 610. Public Open House

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Creating the Future Bruce B Downs Blvd

APPENDIX E Evaluation of Improvement Alternatives

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

3.0 PROJECT DESCRIPTION

Mandan Commission Meeting August 2, 2016 Mandan City Hall

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

TRAFFIC MANAGEMENT PLAN

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

From Disarray to Complete Street:

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Huntington Station Metro Zone / North Kings Highway Concept Plan

Draft North Industrial Area-Wide Traffic Plan

Please find below the Town staff s responses to NCDOT s recommended roadway stipulations listed in a letter dated May 25, 2015.

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

COMMUNITY MEETING AGENDA

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

Bay to Bay Boulevard Complete Streets Project

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

West Circle Drive (CSAH 22) Traffic Operations Study

CITY OF SPOKANE VALLEY Request for Council Action

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Donahue Drive Corridor Traffic Operational Evaluation

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Tunnel Reconstruction South 5 th Street Association October 16, 2018

INTERCHANGES. Module 7

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

Design Criteria. Design Criteria

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

North Turnaround. Option 3: Best facilitates transfers from local to rapid transit services. High cost

What Is a Complete Street?

Fairfax County Parkway Widening Fairfax County

Harrah s Station Square Casino

East 12 th Street Bikeway Feasibility Study

Shockoe Bottom Preliminary Traffic and Parking Analysis

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Iowa Highway 58 Corridor Improvement Study

Highland Park High School Campus Traffic and Parking Study

Chapter 4: Transportation Systems

APPENDIX I TRANSIT TRAVEL TIME SAVINGS

2007 TRAFFIC SIGNAL PRIORITY LIST SUMMARY OF STAFF RECOMMENDATIONS TO PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION.

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Delaware Avenue Corridor Study

122 Avenue: 107 Street to Fort Road

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

CIRCULATION, PARKING AND ALTERNATIVE TRANSPORTATION PLANS

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Project Goals and Objectives

I-395 Express Lanes Northern Extension Project Public Hearings

Michael A. Werthmann, PE, PTOE Principal

Interstate 89 Exit 17 Scoping Study. Study Team Meeting #3 Notes

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

A-1 Arcadia with Signal

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

TECHNICAL MEMORANDUM

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

I-290 Phase I Study Village of Forest Park November 9, of 25

Sebastopol Charter School Traffic Management Plan

Road Diets FDOT Process

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Frequently Asked Questions

Appendix D: Concept Screening

Mission Bay Loop (MBL) Public Meeting

Transcription:

ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on MB1: Dual Eastbound Left-Turn Lanes Generally compatible with BRT and distances on west and distances on west local service north legs and north legs (38.8 s/vh) 3 add l movements approaching Requires expansion of U-Bay

ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on MB2: Dual Eastbound Left-Turn Lanes and Southbound Right-Turn Lanes Generally compatible with BRT and distances on west and distances on west local service north legs. and north legs. (29.9 s/vh) Requires expansion of U-Bay

ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on MB3: Split Tee Intersections with full access to University Bay Drive Crossing only on Two stage north- Generally compatible with BRT and east side of Farley south crossing on local service Ave./ U-Bay east side only Two-stage crossing with large refuge Requires expansion of U-Bay possible & Franklin Ave. Adds signalized (south Tee) crossing at Franklin Overall Intersection LOS A Ave. tee (7.1 s/vh) intersection pending completion of sidewalk on north side Similar to: Madison, WI (Junction Road and Old Sauk)

ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on MB4: 8-Lane Corridor (3 All-Purpose Lanes, 1 Bike/Transit/Right-Turn Lane each direction) Longer distances to Longer distances Improves travel time and reliability cross to cross for BRT and local service Little/no terrace More lanes to along University navigate Avenue for eastbound and eastbound and westbound west westbound of Farley Avenue pedestrians west of Wider on-street Farley Avenue east-west accommodation, but shared with buses and right turns

ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on HB1: Modified Diamond Interchange (possible Campus Drive extension) Short crossing Less traffic Less compatible with BRT due to & Westbound Campus lengths and reduced through signals relocation of outbound stop Drive Ramps traffic through Two signalized west of on-ramp and potential signals intersections to for weaving traffic (29.4 s/vh) Two signalized cross rather than Frequent entering and exiting & Eastbound Campus intersections to one along the corridor to make stops Drive Ramps cross rather than one (26.9 s/vh).

ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on HB2: Westbound Campus Drive extension only Less compatible with BRT due to & Westbound Campus distances to distances to relocation of outbound stop Drive Ramps accommodate accommodate west of on-ramp and potential structure and walls structure and for weaving traffic (37.3 s/vh) Less traffic through walls Frequent entering and exiting 2 movements at signal Less traffic along the corridor to make stops. through signal

ped at signalized East of U-Bay North of Campus on Farley Ave./ U-Bay & Westbound Campus North of on Farley Ave./ U-Bay Near VA on Dismissed Alternatives: Providing Bus/Bike/Right-Turn Lane without Expansion (Poor operations without significant MV demand reduction) Prohibit Eastbound Left at University Bay Drive and reroute traffic to (eastbound traffic fails in the AM peak along Highland) Tee Intersection with Full Access to Farley Ave. (eastbound traffic fails in the AM peak along Highland) Expanded At-Grade Farley Ave./ U-Bay Intersection with Direct Ramp to UW/VA (Cost prohibitive)