I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

Corridor Advisory Group Meeting #21. October 15, 2015

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Comprehensive Collection of Stakeholder Alternatives by Mode

5. RUNNINGWAY GUIDELINES

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Geary Corridor Bus Rapid Transit

Terwillegar Drive Expressway Draft Concept Plan

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Thank you for attending

Hennepin/First Transportation Study

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Public Meeting #2 May 18, 2011 Comment Summary by Category

Bay to Bay Boulevard Complete Streets Project

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

NEWMARKET UPHAM S CORNER

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Hennepin County Bicycle and Pedestrian Planning

I-66 Corridor Improvements Route 15 to I-495. November 2014

Lawrence Avenue Streetscape Concepts August 30, 2011

Freeway ramp intersection study

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

122 Avenue: 107 Street to Fort Road

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions

KEARNY MESA COMMUNITY PLAN UPDATE

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Display Boards Including Five Refined Design Concepts

95 th Street Corridor Transportation Plan. Steering Committee Meeting

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

MASTER BICYCLE AND PEDESTRIAN PLAN

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

North Avenue Corridor Study

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

North Avenue Corridor Study

LANE ELIMINATION PROJECTS

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Public Information Meeting

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Creating the Future Bruce B Downs Blvd

MnPASS System Today and the Future

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Technical Working Group November 15, 2017

Ann Arbor Downtown Street Plan

Bellevue Downtown Association Downtown Bike Series

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Columbia Pike Implementation Team (CPIT) Meeting

Route 79/Davol Street Corridor Study

DDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior

Highway 217 Corridor Study. Phase I Overview Report

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

Community Task Force November 15, 2017

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Road Diets FDOT Process

Tonight is for you. Learn everything you can. Share all your ideas.

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Regional Transportation Needs Within Southeastern Wisconsin

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

STATION #3 INITIAL ALTERNATIVES

CITY OF SPOKANE VALLEY Request for Council Action

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Building Great Neighbourhoods QUEEN ALEXANDRA

Active Transportation Rail to River Corridor. Community Meeting - Segment A

The Bay Bridge Corridor Congestion Study

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

South King County High-Capacity Transit Corridor Study

Board of Supervisors February 27, 2017

Detailed Description of Work

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

APPENDIX D. May 22, 2002 Open House Summary and Materials

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

S T A T I O N A R E A P L A N

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

APPENDIX E Evaluation of Improvement Alternatives

Transcription:

I-290 Phase I Study Village of Forest Park November 9, 2015 1 of 25

I-290 Study Area Reconstruction Section (9 miles) Re-striping Section (4 miles) 13 miles West of Mannheim Road to Racine Avenue Connects between: I-88 on the west Jane Bryne Interchange on the east Jane Bryne Interchange Improvements 2 of 25

I-290 Study Overview 3 of 25

Public Involvement Efforts 21 Corridor Advisory Group/ Task Force Meetings Over 100 Community and Transit Agency Meetings 6 Newsletters and Factsheets 3Public Meetings www.eisenhowerexpressway.com 4 of 25

Transportation Needs, Alternatives Summary Transportation needs to be addressed Mobility, safety, condition, design Connections between travel modes Access to jobs OVERALL GOAL Create an asset for adjoining communities 5 of 25

Transportation Needs, Alternatives Summary Alternatives development evaluation Three evaluation rounds, CTA Blue Line Vision Study Engineering considerations Evaluation rounds 1 and 2 conceptual alternatives, travel model Evaluation round 3 geometry Environmental Considerations Communities are the environment Noise, air quality HOV 2+ Express Bus 3 lanes Add 1 lane (HOV 2+) HCT Extension Add 1 lane (HOV 2+) 3 lanes 6 of 25

CTA Vision Study Recommendations Complete reconstruction/modernization for the Forest Park branch Bring existing service speeds up to state of good repair Maintain existing station access Maintain existing service no 3 rd track or express service Remove stations closed in the 1970 s Redesign Forest Park terminal, yard and shop Work with IDOT to refine design, develop staging concept, explore joint funding opportunities Preserve footprint for future extension (supportive land use required) 7 of 25

Preliminary Preferred Alternative HOT 3+ & Supporting Transit 88 Mannheim Rd. Des Plaines Austin Blvd. Racine Ave. 90/94 Existing Condition 4 lanes 3 lanes 3 lanes 4 lanes 4 lanes I-290 I-290 1.4 mi 3.5 mi 2.1 mi 6.1 mi 0.5 mi Preferred Alternative HOT 3+ Express Bus 3 lanes 3 lanes Add 1 lane (HOT 3+) Convert 1 lane (HOT 3+) Blue Line Extension Add 1 lane (HOT 3+) Convert 1 lane (HOT 3+) 3 lanes 3 lanes SUPPORTING TRANSIT > Bus feeder service > Blue Line extension to Mannheim Initial service option - bus in managed lane I-290 corridor improvements will enable/leverage transit improvements 8 of 25

DesPlaines Avenue Circle Avenue Harlem Avenue 9 of 25

DesPlaines Ave. Improvements Proposed design compatible with future CTA Terminal concept Simplify intersection at I-290 ramp and CTA Extended southbound right turn lane to I-290 Modern traffic signals Signal protected ramp crossing Improved / wider sidewalks (ADA) On-street bike lanes New shared use path & connections Shared use path bridge over DesPlaines Avenue Aesthetic opportunities 10 of 25

Circle Avenue Improvements Wider sidewalks 16-feet wide at CTA station 12-feet wide along west side Dedicated directional bike lanes New CTA Blue Line head station Kiss and Ride pullout-waiting area New Shared Use Path & connections Modern traffic signal at Harrison Street Improved lighting Aesthetic opportunities 11 of 25

Harlem Ave Improvements Right hand ramps Keeps intersection in same location Partial decking over I-290 Wide sidewalks & pedestrian plaza areas (ADA) Pedestrian refuge islands between ramps New pedestrian crossings of Harlem Avenue New shared use path & connection Modern signals with ped countdown timers Improved operations Up to 36% delay reduction Up to 44% queue reduction 12 of 25

Noise Analysis & Noise Walls 13 of 25

1 Identify Noise Receptors Worst-case noise location Outdoor activity area Residence Restaurant Office Courthouse Residence Cemetery 14 of 25

2 Traffic Noise Level Determination Noise calculated at worst-case locations Predict traffic noise levels using the FHWA Traffic Noise Model (TNM) Validate model by field monitoring 15 of 25

3 Traffic Noise Impact Identification Impacts identified for worst-case locations 1. FHWA Noise Abatement Criteria (NAC) 1. 67 db(a) residential 2. 72 db(a) commercial 3. NAC is a trigger to study abatement 4. Existing, 2040 No Build over 67 db(a) 2. Proposed project would not result in substantial noise increases 16 of 25

4 Traffic Noise Abatement Analysis Abatement analysis completed in areas with impacts Noise walls only option for I-290 corridor Each receptor studied for abatement Noise walls must: Be constructible Achieve noise reductions of 5 and 8 db(a) Pass a benefit/cost calculation Be supported by those it benefits acoustically (voting) Viewpoints solicitation 17 of 25

Viewpoints Solicitation Rental properties: One vote for tenant, one vote for owner (per unit) Receptors that share property line with I-290 receive TWO VOTES Up to TWO ROUNDS of voting to MAXIMIZE response rates RESPONSE GOAL OF 33% of benefited receptors per proposed barrier If more than half of the votes are in favor of a barrier, the proposed abatement measure will be likely to be implemented 18 of 25

Proposed Noise Walls Forest Park 19 of 25

Before & After Visualizations Existing Lehmer Street and Beloit Ave Forest Park 20 of 25

Before & After Visualizations With Noise Wall Lehmer Street and Beloit Ave Forest Park 21 of 25

Harlem Ave Ramp Without noise wall Lehmer Street & Marengo Drive Forest Park 22 of 25

Harlem Ave Ramp With noise wall Lehmer Street & Marengo Drive Forest Park 23 of 25

Next Steps - Overall Noise analysis and coordination Technical Analysis Community and agency meetings continued Noise Wall Viewpoints Solicitation Surveys Early November Corridor Advisory Group #22 February 2016 Draft Environmental Impact Statement Release February 2016 Public Hearing March 2016 Corridor Advisory Group #23 Summer 2016 Final Environmental Impact Statement/Record of Decision Fall 2016 24 of 25