Transmission Connection Forms

Similar documents
Distribution Connection Forms

Gas Distribution Connection Forms

KEPPEL GAS PTE. LTD.

Tuas Power Supply. Gas Retailer Handbook

HANDBOOK ON GAS SUPPLY - PROCEDURES AND REQUIREMENTS FOR SUPPLY OF NATURAL GAS

Natural Gas Connection Policy and Procedures

CITY GAS HANDBOOK ON GAS SUPPLY. Version 4

Procedure: Pressure equipment safety

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

BCGA GUIDANCE NOTE 17

Receipt By Jurong Port Representative -To be filled by Jurong Port Representative No Item Yes No Remark 1.

INSTITUTION OF GAS ENGINEERS AND MANAGERS

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Liquefied Petroleum Gas Market Regulations S.L

SECTION PRESSURE TESTING OF PIPING

STS 650 PRESSURE EQUIPMENT

September 2018 Pressure Test

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

High-Pressure Boiler Inspection Procedures: A Complete Checklist

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Gas Safety Code of Practice

WHS CONTRACTOR INFORMATION PACKAGE

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

OPERATING CODE NO. 8 APPENDIX 2

Approved Installation Method (AIM)

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

Energy Control Procedures Lockout/Tagout 29 CFR

Gas Pressures FAQs. Why only 19 mbar inlet pressure and 15 mbar outlet pressure? MOV: meter outlet valve ECV: emergency control valve

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

Installation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2

G SPECIFICATION: TITLE: VOLUME: 4 REVISIONS:

CONFINED SPACE PROGRAM

UNIVERSITY OF RHODE ISLAND DEPARTMENT OF SAFETY & RISK MANAGEMENT STANDARD OPERATING PROCEDURE

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING

Intamix Thermostatic Mixing Valve

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Guide For Applicants MAIL ORDER SALES

ambiente Installation Guide AmbiClip Systems more than underfloor Customer: Project: Project Reference: Date:

Control of Hazardous Energy. Environmental Health and Safety

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

AUTHORISE THE SETTING AND SEALING OF REGULATORS AND ASSOCIATED SAFETY DEVICES. AUTHORISE THE INSTALLATION OF A METER BY- PASS

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

USER GUIDE. Fog Generator. ATMOSPHERE APS TM Series Haze Generator. MAX APS TM Series. No: , Revision A/a

CERTIFYING GASFITTER

MANAGEMENT PROCEDURE FOR SAFE CONTROL OF OPERATIONS - THE CONTROL OF NON-ROUTINE GAS SUPPLY OPERATIONS

PECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

Connecting Coal Bed Methane to the NTS. Transmission Workstream 1 st July 2010

ambiente Installation Guide AmbiScreedboard system more than underfloor Customer: Project: Project Reference: Date:

Spirax Compact FREME Flash Recovery Energy Management Equipment

CLEANING, INSPECTION, AND TESTING OF SEWERS

ACCESSORY KIT INSTALLATION INSTRUCTIONS

THE FOLLOWING MATERIALS ARE FOUND IN THIS PACKET:

Summary of the MRA LPG Codes of Practice

ACCESSORY KIT INSTALLATION MANUAL

G REQUIREMENTS FOR THE INSTALLATION OF GAS BOOSTERS, MICROTURBINES AND ASSOCIATED SYSTEM PROTECTIVE DEVICES

FUNCTIONS & WEDDINGS 2018

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

LICENSED DRIVERS BETTING POLICY HARNESS RACING VICTORIA

LPG TANK INFORMATION An energy company that puts

System Pressure Manager Standard & System Pressure Manager Plus

6301 TYPE CAST IRON SAFETY VALVES

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

BUGGY POLICY Heacham Manor & Searles Resort Golf Clubs Use of Ride-on Buggies on the Golf Course.

Temporary Equipment Checklist

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CERTIFYING GASFITTER

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

EDUCATION DEPARTMENT ACCU-TEST

Further technical information is available on

PRESSURE SYSTEMS POLICY

JGCC Handicapping System. JGCCHS Rules and Regulations (2011)

ambiente Installation Guide AmbiPlate more than underfloor Customer: Project: Project Reference: Date:

TABLE OF CONTENTS PART 2 - CONFINED SPACES

FORM 1 Online Marketing Services

1. Introduction. The Easy Guide to TMV3 Approval

Bayou Wing Chun Waiver APPLICATION FORM

Confined Space Entry Written Program

WLPGA East African Summit

SMU DIVA LA FUTBOL XVI REGISTRATION FORM

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

(An Associated Club of the Malayan Racing Association)

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Contractor/Visitor Safety Orientation UNBC

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Gas Interruptions. customer guide

ONE YEAR FREE UNLIMITED DATA ROAM PROMOTION TERMS & CONDITIONS OF SINGTEL MOBILE S DATAROAM SAVER (DAILY) PLAN AND EASYDATA ROAM ADD-ON LUCKY DRAW

G IG-2. INSTALLATION AND INSPECTION OF GAS SERVICE REGULATOR VENT LINE PROTECTORS (VLPs) [Interim Guideline]

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

Official Journal of the European Union L 92/3

Accreditation for In-Service Inspection of Pressure Systems/Equipment

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

Health & Safety Policy Arrangements Temporary Compressed Gas Installation (Inert and Oxidising Gas Only) (HSA 23)

LIQUEFIED PETROLEUM GAS (LPG) AND NATURAL GAS (NG) - FIRE PREVENTION ISSUES

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Transcription:

Transmission Connection Forms Form No. GTP101 GTP102 GTP105 GTP107 GTP108 GTP109 GTP110 KG-T01 KG-T02 KG-T03 KG-T04 KG-T05 KG-T06 Description Application for Gas Transmission Connection Consumer Project Data Sheet Application for Admittance of Gas Authorization to open Gas Meter Control Valve Certification of Completion (GSIV to Meter) Certification of Final Pressure Test (GSIV to Meter) Certification of Proof Test (GSIV to Meter) Certificate of Completion (Consumer s Internal Pipe) Certificate of Final Pressure Test (Consumer s Internal Pipe) Certificate of Proof Test (Consumer s Internal Pipe) Initial Turbine Meter Records Statement of Turn on of Gas Notification of Gas Supply Isolation / Termination

Transmission Connection Flowchart Start Pre-consultation Phase 1. GTP102: Consumer Project Data Sheet 2. Site Plan with Meter Installation Location Revised Meter Location Yes No Commercial Agreement Finalization Phase 1. Signing of Agreement with Customer 2. Payment of Connection Fee by Customer 3. Booking of Capacity by KGas Project Confirmation Phase 1. GTP101: Application for Gas Transmission Connection 2. GTP102: Consumer Project Data Sheet 3. Site Plan with Meter Installation Location Construction Phase 1. Construction of Gas Pipeline by PowerGas 2. Construction of GSIV to Meter Installation Pipeline by Customer 3. Construction of Gas System by Customer 4. Construction of Meter Installation by Customer / Transporter Pre-Gas Admittance 1. GTP105: Application for Admittance of Gas 2. GTP107: Authorisation to Open Gas Meter Control Valve 3. GTP108: Certificate of Completion (GSIV to Meter) 4. GTP109: Certificate of Final Pressure Test (GSIV to Meter) 5. GTP110A: Certificate of Proof Test (GSIV to Meter) 6. As Built Drawing (GSIV to Meter) 7. Welder s Certificates 8. NDT Report (GSIV to Meter) 9. Owner s written consent Pre - Gas Turn On 1. KGT01: Certificate of Completion (Consumer s Internal Pipe) 2. KG-T02: Certificate of Final Pressure Test (Consumer s Internal Pipe) 3. KG-T03: Certificate of Proof Test (Consumer s Internal Pipe) 4. As Built Drawings (Consumer s Internal Pipe) 5. Welder s Certificates 6. NDT Report (Consumer s Internal Pipe) 7. Risk Assessment of Gas Turn on Procedure Gas Admittance Phase 1. Preparation of flame arrestors / vent points / gas detectors 2. Proof Test to be conducted on site 3. Final Pressure Test to be conducted on site Natural Gas will be admitted up to Meter Installation outlet valve. Transporter to issue Statement of Interim Admittance of Gas Gas Turn On I 1. Preparation of flame arrestors / vent points / gas detectors /Communication devices 2. Proof Test to be conducted on site 3. Final Pressure Test to be conducted on site Natural Gas to be admitted to gas appliances at nominal pressure of about 2barg Transporter will issue Statement of Interim Gas turn on Post Gas Turn On Gas Turn On II Transporter will elevate the pressure of the Gas system in phases until the network pressure is achieved. Transporter will issue Statement of Gas turn on Designated Representative to affix Live Gas stickers and lock all valves Keppel Gas Personnel to record Turbine Meter readings Keppel Gas to issue statement of Turn-on of Gas

APPLICATION FOR GAS TRANSMISSION CONNECTION To: PowerGas Ltd c/o HOS (Gas Network Planning) SP PowerGrid Ltd Through Shipper Signature of Shipper Representative Name / Designation Keppel Gas Pte Ltd Name of Shipper GAS CONNECTION TO: (Project Name) (Address of Gas Fitting) I would like to apply for connection to the PowerGas gas transmission pipeline network for the above project. I hereby submit the following documents and certify that the information provided is correct: Consumer Project Data Sheet Location / site plan showing the project site and the proposed connection point Location of Meter Installation where applicable. Name of Applicant: Designation: Company: Signature / GTP101 (0418)

Consumer Project Data Sheet Consumer Information Project Address of Gas Fitting : Consumption Information Application of Gas Genco / Co-Gen / Tri-Gen / Boiler / Issued with Generator Cooking / Water Heating / Others * Licence? If Others, please specify: Yes / No* Gas Consumption Duration Per Day 8 / 12 / 24* hours or specify: Expected Gas Admittance Date (DD/MM/YY) If gas supply is meant for interim use (less than 5 Gas Usage yrs), please specify duration of gas usage in years: Delivery Pressure and Flowrate Injection Point (location) Offtake Point (location) Meter Installation by Transporter? Yes / No * Year 1 mmbtu / hr Year 2 mmbtu / hr Load Profile / Pipeline Capacity Year 3 mmbtu / hr Required Year 4 mmbtu / hr Year 5 mmbtu / hr Maximum Daily Quantity BBtud Meter Sizing Max Flowrate BBtu / hr Parameters Min Flowrate BBtu / hr Minimum Pressure required at Gas Service Isolation Valve (GSIV) Barg Design Pressure of User s gas facility: Barg Submitted by Applicant Name of Company: Name of Officer: Designation: Signature: Confirmation by Shipper Name of Shipper: Name of Officer: Designation: I agree with the above information provided by the applicant. Signature: Note: The above is for information purposes only. PowerGas may not be able to nor is obliged to fulfill any of the above requirements. GTP102 (0418)

APPLICATION FOR ADMITTANCE OF GAS PowerGas Ltd c/o HOS (Gas Transmission Projects) SP PowerGrid Ltd Through Shipper Signature of Shipper Representative Name / Designation Keppel Gas Pte Ltd Name of Shipper (Name of Project) (Address of Gas Fitting) (A) I, the Designated Representative (DR) of the above project, certify that the Gas Fitting from, but excluding, the GSIV up to, [and including / but excluding] *, the Meter Installation, has been, Designed and constructed in accordance with the requirements of the relevant Legislations, Regulations, Codes and Practice. A copy of the Certificate of Completion (Form GTP108) is attached; Successfully tested and passed the final pressure test and that it is leak free. A copy of the Certificate of Final Pressure Test (Form GTP109) is attached; Capped / blanked / plugged off at end points I certify that the Consumer s Internal Pipe is not connected to and is physically separated from the outlet of the Meter Installation. I further certify that the Gas Fitting from, but excluding, the GSIV up to, [and including / but excluding]* the Meter Installation is ready to receive gas. I undertake to conduct the necessary proof test on the Gas Fitting from, but excluding, the GSIV up to, [and including / but excluding] *, the Meter Installation and submit the Certificate of Proof Test (Form GTP110) immediately prior to the connection and gas admittance. Signature and Stamp of PE/Date PE No.: (B) I hereby request for admittance of gas to the Gas Installation / Gas Fitting up to, [and including / but excluding]* the Meter installation outlet on. To the Shipper: Signature of Applicant / Date This is to confirm gas admittance shall be carried out on.please notify all relevant personnel to be present on site. Designation: SPPG Officer-in-charge GTP105 (0418)

AUTHORISATION TO OPEN GAS METER CONTROL VALVE PowerGas Ltd c/o HOS (Gas Transmission Projects) SP PowerGrid Ltd (Project Name) (Address of Gas Installation) I, Consumer / PE * of the above project hereby authorise PowerGas to open the Gas Meter Control Valve on my behalf now on (date) at (time) for the purpose of gas turn on. Signature of Consumer / PE Designation: GTP107 (0418)

PowerGas Ltd c/o HOS (Gas Transmission Projects) SP PowerGrid Ltd Through Shipper CERTIFICATE OF COMPLETION Signature of Shipper Representative Name / Designation Keppel Gas Pte Ltd Name of Shipper (Name of Project) (Address of Gas Fitting) I, the Designated Representative of the above project, hereby certify that the Gas Fitting for the above project, from, but excluding, the GSIV up to [and including / but excluding]* the Meter Installation have been designed and all gas service works have been carried out in compliance with the requirements of the latest revision of the following: Gas Act (Cap 116A); Gas (Supply) Regulations 2008; Gas (Metering) Regulations 2008; Gas Supply Code; Gas Metering Code; Singapore Standard SS 608 Code of Practice for Gas Installation; Other applicable code / standard: All relevant acts, regulations and rules which are applicable to the gas installation; All statutory and relevant codes which are applicable to the gas installation; All statutory requirements in government laws and relevant regulations of government departments. 2. I further certify that the design pressure of the above Gas Fitting is Barg. Signature and Stamp of PE /Date PE No.: *Delete where applicable GSIV to Meter GTP108 (0418)

CERTIFICATE OF FINAL PRESSURE TEST PowerGas Ltd c/o HOS (Gas Transmission Projects) SP PowerGrid Ltd Through Shipper Signature of Shipper Representative Name / Designation Keppel Gas Pte Ltd Name of Shipper (Name of Project) (Address of Gas Fitting) I, the Designated Representative of the above project, hereby certify that the Gas Fitting from, but excluding, the GSIV up to, [and including / but excluding]*, the Meter Installation, has been successfully tested at (Barg) for (hrs) and passed the final pressure test on (date) in accordance to the requirements of: Note: Please tick where applicable Singapore Standard, SS 608 - Code of Practice for Gas Installation; or Other applicable code / standard : 2. I hereby declare that the Maximum Allowable Operating Pressure (MAOP) is (Barg). Signature and Stamp of PE / Date PE No.: GSIV to Meter GTP109 (0418)

PowerGas Ltd c/o HOS (Gas Transmission Projects) SP PowerGrid Ltd Through Shipper CERTIFICATE OF PROOF TEST Signature of Shipper Name / Designation Keppel Gas Pte Ltd Name of Shipper (Name of Project) (Address of Gas Fitting) I, Designated Representative of the above project, hereby certify that the Gas Fitting for the above project from, but excluding, the GSIV up to, [but excluding / and including] *, the Meter Installation have been successfully proof tested and passed the proof test 1 on (date). 2 I further certify that the test pressure has been released and the said Gas Fitting is currently at atmospheric pressure. Accordingly, I hereby request to proceed with the connection and gas admittance. 3 I shall undertake and proceed to purge and commission the Gas Fitting from, but excluding, the GSIV up to [and including / but excluding] *, the Meter Installation after the gas admittance. Signature and Stamp of PE / Date PE No.: 1. Proof test shall be conducted in accordance to the requirements of SS 608 or CP 51 where applicable for installation designed to operate up to 50kPa and 20 KPa respectively. Otherwise, proof test shall be carried out at 100 kpa or the operating pressure, whichever is lower, for a period of 30mins. REQUEST FOR INTERIM ADMITTANCE OF GAS I, Designated Representative of the above project, hereby certify that the Gas Installation for the above project from, but excluding, the GSIV up to [and including / but excluding]* the Meter Installation have been prepared and is ready for purging and commissioning. Please proceed to admit gas for the purpose of purging and commissioning. Signature and Stamp of PE / Date PE No.: GSIV to Meter GTP110 (0418)

Certificate of Completion (Consumer s Internal Pipe) To: Keppel Gas Pte Ltd 1, Harbourfront Avenue, #05 05, Keppel Bay Tower Singapore 098632 Reference: (Project Name) (Address of Premises / Development) 1. I, the Designated Representative of the above project, hereby certify that the Consumer s Internal Pipe for the above project, from and including the Meter Installation to, the appliances / equipment have been designed and all gas service works have been carried out in compliance with requirements of the latest revision of the following: Gas Act (Cap 116A); Gas (Supply) Regulations; Gas (Metering) Regulations; Gas Supply Code; Gas Metering Code; Singapore Standard, SS 608 Code of Practice for Gas Installation Other relevant code / standard: Please state: All relevant acts, regulations and rules which are applicable to the gas installation; All statutory and relevant codes which are applicable to the gas installation; All statutory requirements in government laws and relevant regulations of government departments. 2. I further certify that the design pressure of the above Consumer s Internal Pipe is Barg. Signature / Stamp of PE PE No.: KGAS-T01 (03/17)

Certificate of Final Pressure Test (Consumer s Internal Pipe) To: Keppel Gas Pte Ltd 1, Harbourfront Avenue, #05 05, Keppel Bay Tower Singapore 098632 Reference: (Project Name) (Address of Premises / Development) 1. I, the Designated Representative of the above project, hereby certify that the Consumer s Internal Pipe for the above project, from the Meter Installation to, but excluding, the appliances / equipment* has been successfully tested at (Barg) for (hrs) and passed the final pressure test on (date) in accordance to the requirements of the following relevant code / standards: (a) (b) (c) (d) 2. I hereby declare that the Maximum Allowable Operating Pressure (MAOP) and the Design Pressure of the above Gas Installation is (Barg) and (Barg) respectively. Signature / Stamp of PE PE No.: KGAS-T02 (03/17)

Certificate of Proof Test (Consumer s Internal Pipe) To: Keppel Gas Pte Ltd 1, Harbourfront Avenue, #05 05, Keppel Bay Tower Singapore 098632 Reference: (Project Name) (Address of Premises / Development) I, Designated Representative of the above project, hereby certify that the Consumer s Internal Pipe for the above project, from [and including / but excluding]*, the Meter Installation to, but excluding, the appliances / equipment has been tested and successfully passed the proof test 1 on (date). I further certify that the test pressure has been released and the said Consumer s Internal Pipe is currently at atmospheric pressure. Accordingly, I hereby request to proceed with the connection and gas turn on. I shall undertake to purge and commission the Gas Fitting from, but excluding, the Meter Installation up to, but excluding, the appliances / equipment immediately after the gas turn on. Signature / Stamp of PE PE No.: 2. Proof test shall be carried out at the lower of (1) 100 kpa and (2) the operating pressure for a period of 30mins. REQUEST FOR GAS TURN ON I Designated Representative of the above project, hereby certify that the Consumer s Internal Pipe for the above project from the Meter Installation outlet to the appliance / equipment has been prepared and is ready for purging and commissioning. Please proceed to turn on gas for the purpose of purging and commissioning. Signature / Stamp of PE PE No.: KGAS-T03 (03/17)

INITIAL TURBINE METER RECORDS To: Reference: RE: Verification of Pay Meter Reading We confirm that the Turbine Meter readings at the commencement of the operation are as follow: Date taken: Time: Meter Serial No.: Tag No.: FT - Mechanical Counter Uncorrected Volume Corrected Volume Remarks: Readings Company Facilities Location: 24 hr Contact No. for Emergency: Contact Person: Witnessed By: Gas Customer Rep Name / Signature: Designation: Keppel Gas Rep Name / Signature: Designation: KG T04 (03/17)

STATEMENT OF TURN-ON OF GAS To: Reference: Dear Sir STATEMENT OF TURN-ON OF GAS This is to inform you that in response to your application for turn-on of gas to your premises at. Hence we agree to turn on the natural gas supply on (date) at (time) at the nominal pressure of Bar/Psi* gauge into the gas installation of the above mentioned premises. (Note: All the gas installation, inclusive of all pipeworks will need to be hydro/pressure tested successfully and signed out by PE prior to gas turn on) Kindly notify all relevant parties that gas has been turned on to the above premises and not to tamper with the gas installation. No further work on the above mentioned premises should be undertaken without our prior written consent. Signature of Keppel Gas Project Coordinator In Charge. Phone No.: Note: Dear Sir, I acknowledge that gas had been turned on to the gas installation of the above mentioned premises on (date) at (time). I will inform all relevant parties that gas has been turned on to the above premises and not to tamper with the gas installation. Kindly notify Keppel Gas if there is a need to carry out any modification to the gas installation thereafter Signature of Applicant or his Designated Representative Name : NRIC No. / Passport No. : Designation : Contact No. : Date :

Copy given to: (Please tick appropriate box) Owner Main Contractor Consultant Name / Company / Signature KG-T05 (03/17)

NOTIFICATION OF GAS SUPPLY ISOLATION / TERMINATION To: Reference: Dear Sir NOTIFICATION OF GAS SUPPLY ISOLATION / TERMINATION * This is to inform you that in response to your application for the isolation / termination *of gas supply to your premises at. We have successfully isolated / terminate * the natural gas supply on (date) at (time). Kindly notify all relevant parties that gas supply to the above premises have been isolated / terminated *. Name / Signature of Keppel Gas Project Coordinator In Charge. Phone No.: Dear Sir, I acknowledge that gas supply to the above mentioned premises have been isolated / terminated * on (date) at (time). I will inform all relevant parties that gas supply has been isolated / terminated * to the above premises. Signature of Applicant or his Designated Representative Name / Designation : NRIC No. / Passport No. : Contact No. : Date : Note: Copy given to: (Please tick appropriate box) Name / Company / Signature Owner Transporter Main Contractor Others KG-T06 (03/17)