Strategy Type (which of the 5 E s) Strategy Detail Time Frame Responsible Party Status Estimated Cost Possible Funding Source Percent of Students Affected Education Bike Rodeo Completed City of Bellbrook Completed $250 City of Bellbrook Education Publication/distribution of walk/bike route maps Ongoing SRTS / Sugarcreek Local Schools In design phase $2000 ODOT Education Driver Pamphlets Ongoing SRTS In design phase $1475 ODOT Education/ Encouragement SRTS Video Ongoing SRTS /Sugarcreek Local Schools In design phase $2500 ODOT Evaluation Conduct more surveys, compile information, report to ODOT Periodic and ongoing Sugarcreek Twp. and Schools Started in 2008 and ongoing $1000- printing ODOT and Sugarcreek Twp. Enforcement Increased police presence during arrival and departure along SRTS routes Ongoing Sugarcreek Twp. and Bellbrook Planning/Funding Stages? City of Bellbrook and Sugarcreek Twp.
Education/Enforcement Safety Patrol Program Planning/Funding Stages $5000 TBD Encouragement Install bike racks Planning/Funding Stages $5000 Lions Club/local businesses/ school district Construct a sidewalk along the east side of the main school drive from Feedwire Road to the Bellbrook Middle School building (approximately 1,300 LF). This improvement will also require crosswalk pavement markings at the two parking lot drives at the school. Will be constructed with projects below by school district $44,000 School District
Upgrade the pedestrian facilities at the Feedwire Road/Upper Bellbrook Road/Pine Court intersection. Install pedestrian signal heads, push button activators, and crosswalk markings on all four legs of the intersection. $347,500 (cost includes two projects below) ODOT- $330,000 School District- $17,500 50%? Construct a ten-foot asphalt bike path along the south side of Feedwire Road from the school driveway to Upper Bellbrook Road (approximately 1,200 LF). Construct of the path may require lengthening a culvert or bridging the stream approximately 300 feet west of Upper Bellbrook Road $347,500 (cost includes projects above and below) ODOT- $330,000 School District- $17,500
Create a pedestrian crossing on Feedwire Road on the east side of the school driveway. This crossing should consist of high visibility pavement and pedestrian actuated overhead crosswalk signage to heighten visibility of pedestrians crossing at this location. Sugarcreek Twp. and SRTS $347,500 (cost includes two projects above) ODOT- $330,000 School District- $17,500 50%? Construct a ten-foot asphalt bike path along the south side of Feedwire Road from Eden Meadows Way to the school driveway (approximately 1,600 LF). Install a crosswalk at Adams Place. May require lengthening a culvert or bridging the stream located just west of the school drive. 24-36 Planning Stages $254,224 ODOT 20%?
Construct a sidewalk along the east side of the northern school drive from Carpenter Road to the Bellbrook Middle School building (approximately 1,000 LF). A crosswalk will also be required across the entrance to the bus parking lot on the north side of the school. 24-36, Planning Stages $40,000 ODOT 20%? Install a crosswalk on Feedwire Road at the Roger Scott/Eden Meadows Way intersection (standard pavement markings and advanced signage). Planning Stages $10,000 ODOT 20%?
Construct sidewalk along the south side of Carpenter Road from Glory Drive to Upper Bellbrook Road-Phase 1: Glory Drive to the school drive Planning Stages $45,000 ODOT 20%? Construct sidewalk along the south side of Carpenter Road from Glory Drive to Upper Bellbrook Road-Phase 2: School Drive to Upper Bellbrook. Planning Stages $79,000 ODOT 20%? Construct a ten-foot asphalt bike path along the south side of Upper Bellbrook Road from the Feedwire Road/Upper Bellbrook Road/Pine Court intersection to Kables Mill Drive (approximately 1,850 LF) Planning Stages $60,000 ODOT 30%?