UPDATE. I-81 VDOT launches I-81 improvement study. Virginia Keeps America Moving Winter 1996

Similar documents
Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Owl Canyon Corridor Project Overview and Summary

FACT SHEET VirginiaDOT.org

Access Management Regulations and Standards

County of Fairfax, Virginia. Department of Transportation

Route 7 Corridor Study

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

SUBJECT: I-82 Existing Conditions I-84 Boardman to Ontario Corridor Management Plan P

Chapter 5 Future Transportation

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Congestion Management Report

2045 Long Range Transportation Plan. Summary of Draft

Project Description Form 8EE

Capital Beltway HOT Lanes - Frequently Asked Questions

TRASBURG RANSPORTATION

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Congestion Management Report

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Basalt Creek Transportation Refinement Plan Recommendations

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

US 69 RELIEF ROUTE STUDY

I 10 Phoenix to California Border Multimodal Corridor Profile Study

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

US Bicycle Route 1 Summary Report: Selection of Preferred Route

The Future of All Electronic Tolling Brian Patno Raytheon ITS Texas October 26, 2012

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

I-25 South Gap Project Monument to Castle Rock

The Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Comments EXECUTIVE SUMMARY

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 1 Kamloops to Alberta Four-Laning Program

Legislative Update Williamsburg Residency

STUDY PROCESS & SCHEDULE

Fairfax County Parkway Widening Fairfax County

Highway 217 Corridor Study. Phase I Overview Report

#!! "$% ##! &! # '#! % $ #!

Route 29 Solutions Projects

Transportation Master Plan Advisory Task Force

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

River Road - Proposed Road Safety Enhancement Measures

Frequently Asked Questions

Highway Safety/Incident Management Electronic Digest

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Chapter 4 Traffic Analysis

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

TRANSPORTATION & MOBILITY

REDUCING ACCIDENTS MEANS SAVING LIVES.

Access Management Regulations and Standards

Preliminary Transportation Analysis

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

APPENDIX D LEVEL OF TRAFFIC STRESS METHODOLOGY

Department of Transportation

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

General Design Factors

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Kentucky s Surface Transportation System

STUDY ADVISORY COMMITTEE. October 8, 2015

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Public Information Meeting

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

In the spring of 2006, national newspaper headlines screamed

SELECTED ROADWAY CAPACITY ANALYSIS

Giles Run Connector Road

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

PBIC Webinar. How to Create a Bicycle Safety Action Plan: Planning for Safety [IMAGE] Oct. 2, 2014, 2 pm

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

Project Description Form 6V

MnPASS System Today and the Future

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Project Update May 2018

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Statement before the Maryland Senate Committee on Judicial Proceedings on Senate Bill 277. Research on Automated Speed Enforcement. Stephen L.

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Appendix T 1: Additional Supporting Data

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

El Paso County 2040 Major Transportation Corridors Plan

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

What if YOU could help plan Northern Virginia s transportation future?

saving lives SWARCO The Better Way. Every Day.

Washington DC Section of ITE Project Briefing

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

ARRENTON RANSPORTATION

THE PHILADELPHIA COMPLETE. an overview

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

CHAPTER 7 CIRCULATION

Tonight we will be discussing accidents

Transcription:

Alvin Alston I- VDOT launches I- improvement study The Virginia Department of Transportation has begun a major effort to plan and design road improvements for Interstate. Most notably, the department is in the very early stages of studying I- and developing a plan to widen and improve Virginia s segment of the interstate. If approved, the plan could take more than 20 years to carry out. VDOT is taking a broad look at the entire interstate and planning for changes that will keep Virginians and Americans moving safely through our state, said David R. Gehr, Commonwealth Transportation Commissioner. We want citizens and organizations outside VDOT involved in the planning to see that all feasible road design options and new technologies are considered before we break ground. VDOT, research and planning groups involved Within VDOT several different technical divisions are working on I- improvements. One effort, led by the agency s Location and Design division, is coordinating 10 conceptual studies to decide the best way to widen sections of the interstate. VDOT s Traffic UPDATE Virginia Keeps America Moving Winter 1996 Traffic volume on scenic Interstate has nearly tripled in the last 25 years. Engineering division is leading a group in exploring ways to use new technologies known as Intelligent Transportation Systems to keep traffic moving on I- during and after construction. Meanwhile, VDOT is encouraging truckstops and other private businesses to build more rest stops and parking areas on the interstate. And the Transportation Planning division, as part of an ongoing effort, is forecasting traffic trends for communities along I-. In addition, organizations like the Virginia Transportation Research Council, Virginia Tech s Center for Transportation Research, and local planners are developing plans and ideas for improving I-. Increasing traffic has led to safety concerns The increasing traffic volume has created safety problems and traffic congestion on the four-lane interstate. I-, which is 30 years old, is carrying more and heavier vehicles than it was originally designed to handle. Traffic has nearly tripled in 25 years from 2.7 million daily vehicle miles traveled in 1970 to more than eight million in 1995. Another significant change has been the increase in truck traffic. Originally designed to handle only 15 percent truck traffic, the aging interstate now carries anywhere from 19 to 40 percent truck traffic, depending on the location. Truck traffic will grow due to market demands Truck traffic will continue to grow as American businesses increase their reliance on trucks to transport goods. In 1992, trucks carried 80 percent of all freight in Virginia, according to figures provided by Continued on page 5

2 Status of I- improvements Meeting times listed below are estimates. VDOT will hold two public meetings in each study area and will announce the specific date, time and place of meetings in local newspapers several weeks before each meeting. 1 3 4 Wythe, Pulaski and Montgomery counties from I-77 near Ft. Chiswell to 2.1 miles (3.4 km) south of Route 460/ near Christiansburg. road-widening location and number of new lanes needed. Status: VDOT consultants begin work on the 18-month engineering study in early 1997. First public meeting: By fall 1997 to present road design options and to hear public comments. Washington County from Exit 7 north to Exit 22 south of Meadowview. roadway-widening location and number of additional lanes needed. Status: Traffic counts completed; study should be finished by summer 1997. First public meeting: Early 1997 for public to review and comment on roadwidening locations and design options. Wythe County from I-/77 overlap near Wytheville to I-77 near Ft. Chiswell. Scope of study: Study the feasibility of widening I- from six to eight lanes. Status: Preliminary engineering study began December 1996. Study will determine whether it is technically feasible to widen this narrow section of interstate. First public meeting: Summer 1997 to discuss study findings and to hear public comments. 2 Washington, Smyth and Wythe counties from 1 mile (1.6 km) north of Route 704 at Exit 22 between Abingdon and Meadowview to I-77 near Wytheville. road-widening location and number of new lanes needed to ease traffic flow. Status: VDOT consultants start work on the 18-month engineering study in early 1997. First public meeting: By fall 1997 to discuss road-widening design options with local citizens. Marion Meadowview Abingdon Bristol 7 22 19 A 1 Wytheville 2 77 3 77 460 Blacksburg Christiansburg Radford Fort Chiswell 4 6 B

3 5 5 Montgomery, Roanoke and Botetourt counties from 1.2 miles (1.9 km) north of Route 460/ near Christiansburg to 1 mile (1.6 km) north of Route south of Buchanan. Scope of study: To widen I- from four to either six or eight lanes, depending on traffic needs. Status: VDOT consultants will complete traffic analysis in the study area by early 1997. The consultants will complete their study by late fall 1997. First public meeting: Early 1997 to present road-widening options. 5 419 64 220 460 6 N Roanoke Buchanan Harrisonburg Staunton 64 Natural Bridge 7 Verona Lexington 2 64 8 Stephens City 33 New Market 247 2 9 Winchester 277 Study areas Construction projects 317 10 Front Royal 66 6 Botetourt and Rockbridge counties, 16-mile section of I- from 1 mile (1.6 km) north of Route south of Buchanan to 0.6 mile (1 km) south of Route at Natural Bridge. road-widening option and number of new lanes needed to accommodate traffic flow in both directions. Status: VDOT engineers and consultants will begin the 18-month study by early 1997. First public meeting: Summer 1997 to update local citizens on road-widening design options and to seek public comment. 7 Rockbridge and Augusta counties from 0.6 mile (1 km) south of Route at Natural Bridge to 0.9 mile (1.5 km) north of Route 612 at Verona. road design options for widening I- and locating the following climbing lanes: northbound and southbound south of Buffalo Creek, northbound for a three-mile section near Natural Bridge, and northbound for a two-mile section near the south Augusta County line. Status: Preliminary engineering study began in spring 1996. Traffic analysis is under way; final study to be completed by September 1997. First public meeting: By early 1997 to present road-widening options and to hear citizen comments. 220

8 4 Construction Projects Augusta, Rockingham and Shenandoah counties from 0.9 mile (1.5 km) north of Route 612 at Verona to 1 mile (1.6 km) south of Route 2 at New Market. road-widening location and number of lanes needed to keep traffic moving smoothly, especially near the city of Harrisonburg and James Madison University. Status: Preliminary engineering studies will begin by December 1996 and will be completed by May 1998. First public meeting: By summer 1997 to update local citizens on road-widening options and to hear local comments. Shenandoah and Frederick counties from 1 mile (1.6 km) south of Route 2 at New Market to 2.1 mile (3.4 km) south of Route 277 at Stephens City. road-widening location and number of new lanes needed. Status: VDOT consultants will begin the engineering study in early 1997. Study will take 18 months to complete. First public meeting: Summer 1997 to discuss preliminary findings on road-widening options and to hear public comment. 9 10 Frederick County from 2.1 miles (3.4 km) south of Route 277 at Stephens City to Virginia/West Virginia state line. Scope of study: To determine whether to widen this section to six or eight lanes, depending on traffic needs. Status: Traffic analysis will be completed by early 1997. Completed preliminary engineering report due by December 1997. First public meeting: Spring 1997 to discuss road-widening options and to hear public comment. In a separate effort to improve I- A traffic flow in the Bristol area, VDOT will begin construction by early 1998 to widen I- from four to six lanes from the Virginia-Tennessee line to Exit 7. VDOT engineers have designed this project to coordinate with future interstate improvements. I- Profile In a separate effort to improve traffic B flow and safety, VDOT will construct a new Christiansburg area interchange and collector-distributor roads that will move traffic on and off I- more smoothly. Construction should begin by spring 1998. VDOT is designing the project to coordinate with future I- improvements. Vital statistics: Extends from Dandridge, Tennessee to the U.S./Canada border In Virginia, 325 miles long longest interstate in Virginia 30 years old; 90 interchanges Two lanes each direction, except for three lanes each way near Wytheville Rolling terrain with view of Appalachian mountain range throughout Virginia Speed limit 65 mph; metro Bristol, 55 mph 20,000 to 50,000 vehicles per day travel the interstate; in last 20 years, traffic has more than doubled, and in urban areas, tripled. 19 to 40 percent truck traffic; designed to carry only 15 percent trucks Distinguishing characteristics: Voted one of ten most scenic interstates in the U.S. and the only one in the Southeast by American Automobile Association Near I-: state parks, 21 state recreational areas, two national forests, Blue Ridge Parkway, Appalachian Trail Corridor has 48 historic sites nearby, mostly battlefields and Civil War sites 29 colleges and universities nearby, representing about 30 percent of state s college enrollment In Virginia, I- travels through 21 cities and towns and 32 counties with a total population of 1.2 million Safety issues: Work zone accidents have been steadily increasing for the last five years; a total of 68 accidents occurred between 1991 and 1994 Top two causes of work zone accidents: driver inattention and exceeding safe speed limit 35 percent of I- fatal accidents involved a truck Sources: Virginia Department of Transportation, Virginia Tech Center for Transportation Research

Studies under way to widen I- 5 If you travel I- often, you are likely to see a steady stream of improvements made to the interstate over the next 20 years. VDOT is in the very early stages of studying how to widen the interstate. The interstate has four lanes except in the Wytheville area where there are six lanes at the I- and I-77 overlap. In 1992, when the Commonwealth Transportation Board authorized the I- conceptual studies, VDOT engineers thought that the entire length of the interstate needed only one additional lane in each direction. But some sections may need two additional lanes in each direction to handle traffic flow. Two examples of such congested areas include the sections between Buchanan and Christiansburg and the I-77 overlap at Wytheville. I-. Participants, most of whom represented the trucking industry and local governments, suggested a variety of improvements: more rest areas and climbing lanes, wider interchanges and greater use of technology. VDOT consultants will hold two more public meetings in each of the ten project areas to review road design options. (See project list inside for anticipated meeting times.) The results of each conceptual study will go to the Commonwealth Transportation Board for comment. The next step will be to set priorities for projects and add them to the VDOT Six-Year Plan, a schedule for designing and constructing road and bridge projects. VDOT estimates that widening the interstate could cost at least $2 billion and take over twenty years to complete. Most of the money would come from federal highway funds. VDOT will promote safe work zones, timely traffic reports Work zone safety for workers and drivers will be a critical part of the construction phase. We will stagger construction schedules for each project area and keep two lanes of traffic moving past work areas, said VDOT s Fred Kiiffner, of the Location and Design office. Once construction begins, VDOT will also give timely traffic updates. The first roadway-widening construction is likely to occur as early as next summer: VDOT will widen a seven-mile section of I- in the Bristol area from the Virginia- Tennessee line to just north of Exit 7. Other areas likely to be candidates for firstpriority status are the congested Roanoke and Christiansburg areas and Harrisonburg s James Madison University area. Coordination and public involvement: key objectives For planning and study purposes, VDOT has divided the interstate into ten separate study areas (see map inside). The department has hired private engineering firms to study each of the ten areas and to recommend roadway-widening and design options. Each consultant study will take about 18 months to complete. Some studies began as early as January 1996; others will start by January 1997. During the studies, the consultants and VDOT engineers will conduct land surveys, traffic counts, environmental and historical studies, and develop design alternatives. Consistent planning, project coordination and public involvement are important objectives of the conceptual studies. VDOT already held a series of public meetings called I- User Meetings earlier in 1996 to hear public suggestions for improving Continued from page 1 Improvement plan the state s trucking industry. By the year 2000, the volume of freight is expected to increase by as much as 28 percent. Safety is a major concern as increasing numbers of heavy trucks, recreational vehicles and cars travel the interstate. I-, with its rolling terrain, can be tricky for even experienced drivers to navigate, especially during fog, rain or snow. During a series of I- User Meetings held by VDOT last winter, truck freight haulers expressed concerns about the limited number of rest areas on I-. On one northbound stretch of the interstate between Blacksburg and Staunton there is no rest stop for more than 100 miles. VDOT has been in touch with local businesses along this section to generate private interest in adding a truck parking area. And there are public-private efforts to expand two existing truck stops and to build an additional truck parking area. For additional copies of this first newsletter or to receive future issues, please contact: Virginia Department of Transportation, Office of Public Affairs, 1401 East Broad Street, Richmond, Virginia 23219 (804)786-5731 TTY users only, call the Virginia Relay Center at 1-800-828-20 VDOT Website: http://www.vdot.state.va.us For information about specific improvement projects, call your local VDOT office.

What will technology do for I-? Road building and traffic management just aren t what they used to be. Today s transportation engineer or planner has a greatly expanded tool kit for the job: the traditional road engineering practices and a growing list of new technologies. VDOT is exploring the use of Intelligent Transportation Systems (ITS) as part of the I- improvement. The first two ITS projects listed below are in the testing stages now: CVISN (pronounced C-vision for Commercial Vehicle Information Systems and Networks) The Commonwealth of Virginia, the State of Maryland and the Federal Highway Administration held joint demonstrations in October of Commercial Vehicle Information Systems and Networks (CVISN). By using CVISN technologies, such time-consuming tasks as weighing, inspecting and registering 6 trucks can be performed more quickly and efficiently. The backbone of the CVISN initiative is a network of computers and devices linking state and federal transportation offices, weigh stations, trucking companies and commercial vehicles. Some of the CVISN devices include: reader devices mounted along the roadside that can electronically read a vehicle s registration and safety records; sensors embedded in the pavement that check a vehicle s weight as it approaches a weigh station; and hand-held computers that aid in faster safety inspections. Because of the heavy truck traffic on I-, CVISN technology is a promising new tool for the trucking industry that will result in safer vehicles and fewer delays. ITS for Highway Emergencies and Maintenance VDOT engineers are exploring how new technology could improve the way VDOT conducts many of its operations, including snow removal, sinkhole repairs, and accident response. The idea is to link VDOT, the State Police and other emergency workers together electronically so they can more quickly set and address response priorities. Meanwhile, the department is working with the Virginia Tech Center for Transportation Research, which recently sponsored a conference on ITS opportunities for I-. Following are projects VDOT and the center are working on: Work Zone Traffic Management ITS Motorists may have noticed the recent addition of variable message signs on the roadsides. The signs light up with short, specific messages as motorists approach work zones or traffic trouble spots. Engineers foresee using such signs not just as a warning of what lies ahead but as a way to minimize traffic congestion. Next winter, VDOT will invite private companies to demonstrate proven technologies on sections of I-. The technologies will electronically detect traffic backups and trigger message signs to give quick traffic information and detour options. The Smart Road The Ultimate ITS Vision The Commonwealth Transportation Board has already approved the design for the Smart Road near Blacksburg. The Smart Road concept, in its most ambitious form, creates an interactive network among motorists, highway officials, and quite literally, the road itself. The road, equipped with electronic sensors, communicates timely traffic and safety information to individual motorists via car radio or through a special Smart Car device. For example, the road could tell the motorist about icy roads and traffic delays or even that the motorist s car is too close to the car ahead. Though not specifically envisioned for I- at this time, the approved Smart Road will intersect the interstate and will be used to develop new technologies. Department of Transportation Richmond, Virginia 23219 Forwarding and Return Postage Guaranteed Address Correction Requested Bulk Rate U.S. Postage Paid Richmond, Va Permit No. 1347