EXECUTIVE DIRECTIVE NO. 20. Issue Date: July 1, 2011

Similar documents
Bicycle Master Plan Goals, Strategies, and Policies

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

CONNECTING PEOPLE TO PLACES

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

ACTIVE TRANSPORTATION

EXECUTIVE SUMMARY. Vision

Hennepin County Bicycle and Pedestrian Planning

Solana Beach Comprehensive Active Transportation Strategy (CATS)

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Perryville TOD and Greenway Plan

2014 Bellingham Bicycle Master Plan

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Goals, Objectives, and Policies

Living Streets Policy

City of Novi Non-Motorized Master Plan 2011 Executive Summary

CHAPTER 1 INTRODUCTION

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

BIKE PLAN CONTENTS GATEWAY

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10


Develop a Multi-Modal Transportation Strategy (Theme 6)

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Michael Parmer, Management Aide, City Manager's Office

1. Engineering: An Inviting Network of Bicycling Facilities for Cyclists of All Ages and Abilities and Destinations that Support Bicycling

Richmond Connects Visioning Update

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Arlington s Master Transportation Plan

5. Pedestrian System. Accomplishments Over the Past Five Years

Town of Babylon Sustainable Complete Streets Policy

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

THE BIKE. H--t t---l---l-\-~~~ ~ '~ ~Jf ~~ ~ t l. ~ l

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

Cecil County, Maryland. Bicycle Master Plan

Chapter 5. Complete Streets and Walkable Communities.

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Shifting Gears for a Healthier City

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

2017 Florida Commuter Transportation Summit

Environment and Public Works Committee Presentation

The Florida Bicycle and Pedestrian Partnership Council

Bicycle-Pedestrian Master Plan Update

Appendix C 3. Bicycle / Pedestrian Planning

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Service Business Plan

MASTER BICYCLE AND PEDESTRIAN PLAN

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Bicycle Best Practices: Goals and Priorities for Education and Promotion Efforts

Clackamas County Comprehensive Plan

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

The City of Chicago s. Bike 2015 Plan. Nick Jackson, Deputy Director Chicagoland Bicycle Federation RAIL-VOLUTION 2006

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

North Shore Transportation Improvement Strategy

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Section 9. Implementation

Berkeley Strategic Transportation Plan A-76

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Vision to Action Community Coalition February 14, 2014 Briefing

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

Transportation Master Plan Advisory Task Force

Executive Summary Route 30 Corridor Master Plan

Strategic Plan for Active Mobility Phase I: Bicycle Mobility

CHAPTER 3: Vision Statement and Goals

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

An all-volunteer 501c3 promoting safe cycling. June 3,

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Regional Transportation Needs Within Southeastern Wisconsin

CHAPTER 7.0 IMPLEMENTATION

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

City of Jacksonville Mobility Fee Update

San Jose Transportation Policy

Multi-Modal Transportation Programs

How To Encourage More Efficient Transportation in Brazilian Cities

COMPLETE STREETS POLICY Exhibit A to Ordinance

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

2. Context. Existing framework. The context. The challenge. Transport Strategy

5.0 Roadway System Plan

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

City of McHenry Bicycle and Pathway System Plan

Evaluation. Chapter 7. Education Encouragement Enforcement Engineering Evaluation. Evaluation Chapter 7

Facilitating Suburban Bike-to-Rail

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Ajax: The Road to Complete Streets

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Transcription:

ANTONIO R. VILLARAIGOSA MAYOR EXECUTIVE DIRECTIVE NO. 20 Issue Date: July 1, 2011 SUBJECT: Implementation of the 2010 Bicycle Plan It is no secret that the quality of life in Los Angeles is directly influenced by the quality of one's daily commute. And for too many Angelenos, getting to work each and every day is synonymous with endless rows of honking cars, congestion and pollution. Recognizing Angelenos are hungry for more options than the single passenger automobile, I asked them to envision a new blueprint for traveling seamlessly throughout our City by supporting Measure R, a plan to invest in LA's infrastructure while also creating over 100,000 local jobs. With its passage, the City finally had the consensus to create a world-class, multi-modal transit network that links each and every neighborhood in Los Angeles. The 2010 Bicycle Plan is the latest major milestone in putting our Measure R funds to work. By designating over 1600 miles of bicycle lanes throughout the City, this comprehensive plan supports bicycling as a viable transportation option at a time of spiking gas prices. Not only will this save Angelenos money, it will encourage them to lead healthy, active lifestyles. And by getting residents out of their cars and onto their bikes, we will also be able to better maintain our roads. This plan is not just healthy for us, bikes are healthy for our infrastructure too. And because bicycling is an emissionsfree way to commute and travel, it's making the City cleaner and greener - for every car trip replaced by a bicycle, we are reducing emissions and improving our air quality. To write this plan, we solicited feedback from different stakeholders throughout the City and conducted exhaustive research. I am proud of this final product that reflects diverse public input, detailed field work, and best practices from cities around the country. By promoting bicycles as a viable mode of transportation, we are creating a more livable and sustainable City for future generations. 200 NORTH SPRING STI,RET Los ANGELES, CALIFORNIA 90012 PHONE: (213) 978 0600 FAX: (213) 978-0750 EMAIL: MAYOR@LACITY.ORG

Page 2 2010 Bicycle Plan The 2010 Bicycle Plan (http://www.labikeplan.org/public involvement!) designates a 1,680 mile bikeway system comprised of three main bikeway networks: the Backbone Network, the Neighborhood Network and the Green Network. The 707 mile Backbone Network, comprised primarily of bicycle lanes, will enable access via arterial streets to major employment centers, transit stations and stops, and educational, retail, entertainment, and recreational resources. The 834 mile Neighborhood Network includes local streets with low traffic volumes and slower speeds where bicyclists of all experience levels can feel comfortable. The Neighborhood Network parallels the Backbone Network and will enable bicycle riders to access schools, libraries, shopping districts, parks and open space via slower streets with less automobile traffic. This network will also give neighborhoods a toolbox for reclaiming their streets by reducing cut -through automobile traffic and redesigning the roadways to reduce automobile speeds. The 139 mile Green Network enhances access with bicycle paths and shared use paths to the City's green open spaces such as the Los Angeles River. When completed, the three networks will give the vast majority of Angelenos access to a City bikeway within one mile of their home. Implementation Plan The updated Bicycle Plan is novel because an implementation plan was adopted concurrently and for the first time ever. The goal is to develop olir streets and bike paths into a citywide network that can be used by all levels of cyclists, from experienced commuters who ride their bike daily to casual recreational riders. The implementation plan includes a commitment to build 40 miles of bikeways a year, four times more than the previous average, and focuses on closing gaps in the existing network and creating new bikeways in lower income and underserved communities. To be successful, all relevant City departments, commissions and agencies need to work together and incorporate bike-friendly practices into their policies and operations. Bicycle Plan Implementation Team (BPIT) The Department of City Planning and Los Angeles Department of Transportation are leading the Bicycle Plan Implementation Team, or BPIT, that is charged with implementing the 2010 Bicycle Plan. The current departmental leads of the BPIT are Claire Bowin (DCP) and Michelle Mowery (LADOT).

Page 3 Incorporate Bicycle Facilities and Bike-Friendly Features in All Public Works Construction, All Public Facilities, and Other City Sponsored Projects In addition to the implementation of specific elements of the city's adopted 2010 Bicycle Plan, it is paramount that city agencies integrate bicycle facilities and bike-friendly features - especially related to cyclist safety - into the design and construction of public works projects (streets, bridges, etc.) and municipal facilities (city office buildings, libraries, yards, etc.). This includes new construction as well as rehabilitation and maintenance work. In addition, the city should require joint development and private development to do the same. For example, grates on city streets should be oriented to minimize bicycle accidents. City bridge reconstruction should accommodate bike lanes when called for in the Bicycle Plan. Existing municipal facilities should add or upgrade bike parking and other amenities. Joint developments should include the same. Private developments should be required to provide bicycle facilities. The following City departments shall incorporate bicycle facilities and bike-friendly features in their projects: Convention Center, General Services, Housing, Public Works, and Transportation. In addition, the commissions of the Community Redevelopment Agency (CRA) and the following proprietary departments are requested to direct their respective general manager to incorporate bicycle facilities and bike-friendly features in their projects: Airports (Los Angeles World Airports), Harbor (Port of Los Angeles), and Water and Power (OWP). The following City departments shall be responsible for developing code amendments requiring private development to incorporate bicycle facilities: Building and Safety, Planning. Develop Consistent Bicycle-Related Standards and Integrate them into Departmental Guidelines and Enforcement Procedures The 2010 Bicycle Plan marks a major shift away from the City's past piecemeal implementation of bicycle-related policy and programs. Instead, the plan envisions a citywide network that will deliver a consistent experience in terms of the type and quality of bikeways and bicycle facilities. Creating such a network depends on the development of and adherence to uniform design, installation, inspection, and enforcement standards. Moreover as the City builds more bikeways and bike parking facilities and integrates bicycles into City codes, it will be imperative for City agencies both to enforce existing standards and to develop appropriate additional standards to protect these new resources.

Page 4 The following City departments shall develop consistent standards and guidelines governing the design, implementation, and maintenance of bikeways and bicycle facilities: Building and Safety, Convention Center, Planning, Public Works, and Transportation. In addition, the commissions of the Community Redevelopment Agency (CRA) and the following proprietary departments are requested to direct their respective general manager to develop consistent standards and guidelines related to bicycle facilities: Airports (Los Angeles World Airports), Harbor (Port of Los Angeles), and Water and Power (DWP). Expand Existing Public Education Campaigns and Training Programs to Include Bicycle Related Information Knowledge is a crucial asset in creating a supportive environment for bicycling in Los Angeles. Accurate information and public awareness is especially important in improving the safety of the City's roadways for all types of users including bicyclists. The City currently conducts numerous public education and safety campaigns that could easily be enhanced to include bicycle-related material. To build on these existing resources, the following departments shall incorporate and integrate bicycle-related education and training materials - especially safety information - into existing outreach and educational campaigns: Fire, Personnel, Police, Recreation and Parks, and Transportation. The following departments shall facilitate bicycle events that support public education efforts and encourage bicycle riding such as CicLAvia, and seasonal and recreation rides: Fire, Police, Public Works, and Transportation. Summary of Required Actions Pursuant to this Executive Directive, the following instructions shall be implemented: 1. All General Managers, Directors, and Administrators of Departments, Offices, Executive Directive shall incorporate bicycle facilities and bike-friendly features in all public works construction, all public facilities, and other city sponsored projects, including joint development and redevelopment projects. 2. The Department of City Planning and Department of Building and Safety shall develop changes to the Zoning Code and Building Code that include bike infrastructure requirements and construction standards. 3. All General Managers, Directors, and Administrators of Departments, Offices,

PageS Executive Directive shall incorporate consistent standards governing the design, implementation, and maintenance of bikeways and bicycle facilities. 4. All General Managers, Directors, and Administrators of Departments, Offices, Executive Directive shall incorporate and integrate bicycle-related education and training materials - especially safety information - into existing outreach and educational campaigns and support bicycle events. 5. This Directive shall remain in effect unless rescinded or superseded by another Directive, ordinance, and/or other applicable law. Executed this/ / // /' / ;' I ~ ~ day of June, 2011