Part 3: Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines

Similar documents
C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

SWIMMING POOL REQUIREMENTS

Swimming Pool Requirements

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

KMU SUBSTATION WORKSHOP

$ Plan Review Fee when Permit Application is submitted HOT TUBS AND SPAS BUILDING PERMIT APPLICATION. COST: $80.

2. The purpose of this program is to achieve the following objectives:

PERMANENT POOLS. Location

Residential Swimming pools

Original Date of Issue: 04/09

MV-105 MEDIUM VOLTAGE CABLE. 5kV, 8kV, 15kV, 25kV & 35kV

Why do I need to do an Arc-Flash Analysis?

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Florida Building Code 6 th Edition (2017) Residential. Broward County Edition Loose-leaf Supplement

Leader s Guide ERI Safety Videos

Electrical Safety Work Practices

Welding With Arc Welding Equipment

POOL AND HOT TUB/SPA REGULATIONS A BUILDING PERMIT IS REQUIRED BEFORE THE INSTALLATION OF A POOL.

Canadian Electrical Code, Part I Full Impact Assessment

UNIVERSITY OF TOLEDO

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6

Safe Schools: A Health and Safety Check

Check with local zoning official for property line distance requirements.

Selection of Electrical PPE Tables

City of Crystal Lake Community Development Department

11/2/2017. Course Objectives. Overview

PART I. GENERAL REQUIREMENTS FOR PERMANENTLY INSTALLED POOLS, STORABLE POOLS, OUTDOOR SPAS, OUTDOOR HOT TUBS, OR FOUNTAINS

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

PERIODIC INSPECTION REPORT FOR AN ELECTRICAL INSTALLATION

Electrical Safety Program

Pool Permit Application

Ground Fault Circuit Interrupter(GFCI) Policy

(1) Minimum Required. At least one entrance of sufficient area shall be provided to

Evaluation of Ground Ring vs. Equipotential Mat at a Swimming Pool in Buford, Georgia

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL Phone Fax PRIVATE SWIMMING POOLS

SAFE-WORK PRACTICES Working On Or Near Energized Electrical Equipment CAT A-1 SOP #4

SWIMMING POOL PERMITS ARE ABOUT HEALTH AND SAFETY

Inspection Recommendations

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

Doc No: ELECTRIC Midland Engineering Co., Inc. Initial Issue Date 12/14/15 Safety Management System

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Electrical Safety Standard

Electrical Hazards: Overhead and underground power lines. tools. Ungrounded electrical systems and tools. in wet/damp environments

ELECTRIC OPERATING PROCEDURES Date: 11/01/06

ES18 Security Theory/Regulations Answer Schedule

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

Electrical Safety in the Food Industry

Inspection and Testing

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE

Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager

Leader s Guide ERI Safety Videos

Landlord Report Operational limitations including the reasons (see page No. ) N/A

PROCEDURE FOR INITIAL AND PERIODIC INSPECTION POTENTIALLY EXPLOSIVE ATMOSPHERES (HAZARDOUS AREA) ORIGINAL EDITION

Lockout/Tagout - Energy Control Program

Eaton County Department of Construction Codes. Requirements for, Swimming Pools, Hot Tubs and Spas in Michigan

Inspection and Testing Pocket Notes

Operating Instructions

APPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

MARINE CORPS BASE CAMP LEJEUNE PUBLIC WORKS DIVISION UTILITIES BRANCH STANDARD OPERATING PROCEDURE SHOP 82, ELECTRICAL DISTRIBUTION

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

OSHA Subpart I Tools - Hand & Power

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Operating Instructions

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

Electrical Safety Program

General Requirements of the NEC Advanced Course. Building Officials and Inspectors Educational Association

Applications and Considerations Section 11

Electrical Safety Program February 2, 2016

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

3M Electrial Markets Division EMS. Electronic Marker System

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

Figure Source:

Installation. S&C Vista Underground Distribution Switchgear. UnderCover, Vault-Mounted, and Pad-Mounted Styles. Instruction Sheet

SAFETY PRECAUTIONS FOR THE BLACK BEARD S BEACH WATER PARK

Fence and Swimming Pool Permit Guidelines

Project: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15

SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST

Responsibilities: Effective Date: November Revision Date: May 1, VP, Facilities and Construction Management. Issuing Authority:

Residential and Small Commercial

Permit and Inspection Requirements for Swimming Pools

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

SWIMMING POOLS CHAPTER 41

CABLE ENTRIES IN HAZARDOUS AREAS CORRECT SELECTION, INSTALLATION AND MAINTENANCE

I. Purpose... 1 II. Introduction... 2 III. General and Safety Precautions... 2 IV. Reference Documents... 3 V. Installation Overview...

Electrical Safety Program

RESIDENTIAL SWIMMING POOL REQUIREMENTS

NFPA 70E Policies and Best Practices

Definitions found in several locations:

Title: NFPA 70E Effective Date: 12/8/2014 Control Number: THG_0053 Revision Number: 1 Date: 10/26/2015 Annual Review Completed: 5/13/2015 NFPA 70E

TECHNICAL BULLETIN PINPOINT CONDUIT COUPLING AND SPLICING RECOMMENDATIONS

Definitions for swimming pools, fountains, and similar installations in article 680

Appendix A: Energized Work Permit

Whitehall Township Swimming Pool, Spa and Hot Tub Code Guide

Arc Flash 101. presented by Arc Flash Blaster LLC

Lock Out - Tag Out Safety Program

Transcription:

Part 3: Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines Charles Bleakley Chair, Subcommittee 7

PART 3 UNDERGROUND LINES 2

313. Inspection and tests of lines and equipment A. When in service 5. Corrections a. Lines and equipment with recorded conditions or defects that would reasonably be expected to endanger human life or property shall be promptly corrected, disconnected, or isolated. 3

Section 32. Underground conduit systems Rule 320B5. Gas and other lines that transport flammable material The present rule requires not less than a 12 inch separation between communication and supply conduits and gas or other lines that transport flammable material.. 4

Section 32. Underground conduit systems Rule 320B5. Gas and other lines that transport flammable material An exception was added in the 2017 NESC to allow less than 12 inches separation. The supply cable is limited to not more than 600 volts between conductors and is required to have supplemental mechanical protection, if needed, to limit the likelihood detrimental heat transfer to gas lines or lines that transport flammable materials. 5

Section 32. Underground conduit systems Rule 323E Vault and utility tunnel access Rule 323E3 requires access doors to vaults and tunnels to be locked unless qualified person(s) are in attendance to restrict entry to unqualified persons. The 2017 NESC edition replaces qualified and unqualified with authorized and unauthorized 6

Section 35. Direct-buried cable and cable in duct not part of a conduit system The present rules require jacketed underground cable concentric neutrals to be effectively grounded at one quarter mile (1,320 feet) intervals or at eighth mile (660 feet) intervals if the random separation rules are applicable. The present rules also require bonding between supply cable concentric neutrals and communication cable shields at 1,000 foot intervals if the random separation rules apply. 7

Section 35. Direct-buried cable and cable in duct not part of a conduit system Where the aboveground equipment spacing does not meet these requirements, the required grounding of the concentric neutral or bonding between supply and communication cables requires the cable jackets to be removed, the connection to a grounding electrode made, the cables reinsulated and buried underground. For cables in commercial parks on in areas where underground cables are routinely installed in duct, meeting these requirements may require cutting into the duct if the interval location is not suitable for an above or below ground termination device. 8

Section 35. Direct-buried cable and cable in duct not part of a conduit system Revisions in the 2017 NESC will allow grounding and bonding at locations where the concentric neutral is normally accessible (pad mounted equipment or handhole) nearest to the required grounding interval, 1,320 feet, or 660 feet and 1,000 feet if the random separation rules apply. See Rules 314C1, 314C2, 354D1g, and 354D3b 9

Rule 354. Random separation Separation less than 12 inches from underground structures or cables 354D3. Insulating jacketed grounded neutral supply cable Each phase conductor of a multi-grounded supply system operating above 300 V to ground and having an overall insulating jacket shall have an effectively grounded copper concentric conductor meeting all of the following requirements: a. A conductance not less than one half that of the phase conductor. This requirement practically eliminates the use of 3 phase cables in direct buried systems. 10

Rule 354. Random separation Separation less than 12 inches from underground structures or cables This requirement practically eliminates the use of 3 phase cables in direct buried systems. Three phase cables normally have one third size neutrals. Recent studies show that a one third size neutral will carry the phase to ground fault current needed to cause the protective device to open and clear the faulted cable. Rule 354D3a was deleted. 11

384. Grounding and bonding C. Bonding should be provided between all aboveground metallic supply and communications enclosures that are separated by a distance of 1.8 m (6 ft) or less. For the purpose of this rule, pole grounds are not required to be bonded to the communication enclosure. CPs requesting revising the bonding requirement to include pole grounds have been rejected based on a study and paper done by an expert on system grounding. 12

384. Grounding and bonding The rule does not prohibit the practice of bonding between communication pedestals and supply pole grounds but, based on safety issues raised by the study, does not require it. The following note was added to the rule in the 2017 edition of the NESC. NOTE: This rule does not prohibit bonding communication metallic enclosures to supply pole grounds, provided all affected parties are in agreement. 13