The minutes of the meeting held on Tuesday 13th June 2017 were agreed as a correct record. There were no matters arising.

Similar documents
Milton Road Project Update. Paul van de Bulk 30 January 2018

MILTON ROAD LLF PROJECT UPDATE

Design Workshops Summary of all Feedback January 2017

Greater Cambridge City Deal. Initial consultation on better bus, cycling and walking trips. Milton Road

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

HISTON ROAD Have your say on better public transport, cycling and walking journeys

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

GD 0043/18 ACTIVE TRAVEL STRATEGY

The Greater Cambridge City Deal

MILTON ROAD CONSULTATION REPORT THE GREATER CAMBRIDGE CITY DEAL

Technical note. 1. Introduction

Initial ideas for bus and cycle links

Nottingham Cycle City Frequently Asked Questions

Regional Cycle Programme Update

Travel Plan Monitoring Report. Bourton View, Wellingborough - Residential

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

STAFF TRAVEL SURVEY 2006 KEY FINDINGS

University of Leeds Travel Plan

London Cycle Network Annual Report 2000

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

MARKHOUSE ROAD IMPROVEMENTS

Land at Chesterton, Cirencester

2. Context. Existing framework. The context. The challenge. Transport Strategy

REF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES

Sandwell General Hospital Travel Plan 2014

Active Travel Strategy Dumfries and Galloway

Using parking policy and parking levies to tackle transport and environmental issues

Enforcement of Bus Lane and Moving Traffic Contraventions in Cardiff. Councillor Briefing Pack

Members Present Mr. Gary Thomas, Mr. Dave Martinez, Mr. Robert Massaro, Ms. Jody Van Curen, Mr. Dan Hill and Ms. Joan Shaffer

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

North West Non-Technical Summary of the Transport Assessment September 2011

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013

9. Parking Supporting Statement

Submission Cover Sheet Mordialloc Bypass Project EES IAC

ENFIELD TOWN THE REVISED DESIGN

Greater Cambridge Partnership Cambourne to Cambridge Better Bus Journeys: Phase One Summary Report of Consultation Findings

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Charlbury Community Action Plan Group. Getting Around & Street Space / Keep Charlbury s Heart Beating. Draft Interim Report July 2017

Cambridge Access and Capacity Study

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Report to: Greater Cambridge Partnership Executive Board 4 July Transport Strategy - Future Public Transport Requirements

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Lea Bridge Road A street for everyone Tell us

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Bristol City Council has produced a draft Bristol Transport Strategy document.

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Greater Cambridge City Deal Executive Board & Joint Assembly

Communiqué ABC Meeting #41 Cairns 2-3 August 2012

122 Avenue: 107 Street to Fort Road

Your views are important. Please fill in a form before you leave. Or alternatively

Blyth Estuary Green Travel Project

Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements

CAMBRIDGE SOUTH WEST PARK & RIDE

Appendix N(b): Portishead Station Outline Travel Plan

OTC TRANSPORTATION PLANNING WORKSHOP

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

National Transport Awards Cambridge Park & Ride

Cambourne to Cambridge Public Transport Route. 14 November 2018

RESTRICTED ROADS (20 MPH SPEED LIMIT) (SCOTLAND) BILL. 1. Is reducing the speed limit to 20mph the best way of achieving the aims of the Bill?

Tackling Peak-time Congestion in Cambridge

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Wellington Public Transport Spine Study

HISTON ROAD STAKEHOLDER WORKSHOP REPORT - (PART 1)

Traditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How?

DRAFT for a State Policy for Healthy Spaces and Places

York Scarborough Bridge Economic Appraisal Update Technical Note

Local Government Road Safety Summit - 9 April 2018

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Sevenways Roundabout, and the need for a Road Safety Scheme:

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online.

INTRODUCTION MEPC BIRCHWOOD PARK CYCLING SUITS

Transit boulevard: A new road type for Sydney s Growth Centres

West and North West Cambridge Consultative Cycling Group

Easton Safer Streets - Final Project Report BRISTOL

LEEDS BECKETT UNIVERSITY. Transport Strategy

Environment and Public Works Committee Presentation

2.0 LANE WIDTHS GUIDELINE

Road Improvement Consultations Huntingdon Road

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System

A1307 HAVERHILL TO CAMBRIDGE CORRIDOR

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

COMMUNITY PARTICIPATION CHAPTER 8

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London

FAQ s Walsh Road / Ferguson Road Pilot Scheme

Living Streets response to the Draft London Plan

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Transcription:

MILTON ROAD LOCAL LIAISON FORUM: MINUTES Date: Tuesday 12th September 2017 Time: 18.00-20:00 Place: Present: Apologies: Chesterton Community College, Rex Freeman Hall LLF Members County Councillor Jocelynne Scutt, Arbury (Chair), City Councillor Gerri Bird, East Chesterton (Vice-Chair) City Councillor Margery Abbott, East Chesterton City Councillor Ysanne Austin, West Chesterton City Councillor Nigel Gawthrope, King s Hedges City Councillor Elisa Meschini, King s Hedges City Councillor Kevin Price, King s Hedges City Councillor Mike Sargeant, West Chesterton City Councillor Martin Smart, King s Hedges County Councillor Ian Manning, Chesterton Charles Nisbet, Milton Road Residents Association Michael Page, Hurst Park Estate Residents Association Michael Bond, Old Chesterton Residents Association County Councillor Claire Richards, Castle County Councillor Damien Tunnacliffe, West Chesterton Greater Cambridgeshire Partnership Officers and Consultants Paul van de Bulk (PB), Project Manager Andrew Walker, Communications Officer Beth Durham (BD), Communications Manager Neil Poulton (NP), Consultant - WSP South Cambs Councillor Anna Bradnam, Milton City Councillor Peter Sarris, East Chesterton 1. MINUTES AND MATTERS ARISING 2. CHAIR S UPDATE The Chair provided apologies from various LLF members unable to attend or arriving late due to other meetings being attended. The minutes of the meeting held on Tuesday 13th June 2017 were agreed as a correct record. There were no matters arising. Chair informed the LLF, since the last meeting, the design concept that had been created out of the DO OPTIMUM option had been put to the Greater Cambridgeshire Partnership Assembly and Executive Board. Officers had gone through all the options and most recommendations were accepted as they were, a few required minor alterations. This demonstrates that residents' ideas have been heavily involved in the design concept. Chair advised that she was happy to run through this with anyone who wanted to see it. 1

3. LLF ENGAGEMENT PLAN (WORKSHOPS AND DESIGN GROUPS) PB presented an overview of the project and put forward a proposal of planned workshops and detailed design groups that will enable the LLF to continue to input before the proposal goes to consultation. PB recapped on the 6 key project objectives for those who had not attended previously. He confirmed that the GCP Executive Board, at their meeting on 26th July 2017, had agreed to: - approve the Final Concept Design as the basis for detailed design work to commence and a business case be prepared prior to consultation. - note that wherever highway space permits opportunities to adopt further aspects of the 'DO OPTIMUM' design, they will be taken as part of the detailed design process. - support discussions with property owners to explore interest in a joint funding approach to improvements on land outside the public highway in the vicinity of local shops on Milton Road. -supplement development of the scheme with further consideration of means of achieving modal shift to public transport. PB outlined the key elements of design development going forward. He explained that The Final Concept design will now be refined into a preferred design and the GCP welcome the continued involvement of the LLF in the design process through workshops, detailed design groups and public meetings. PB explained that an outline business case is required to enable the Executive Board to commit to expenditure on the delivery of the scheme. A key part of this is its Benefit Cost Ratio (BCR). For a successful BCR and to meet the scheme's objectives improvements to public transport reliability and journey times must be achieved. If this cannot be demonstrated, the scheme risks being unable to justify its funding allocation. PB Outlined the three processes for LLF Design Engagement prior to the submission of the detailed design concept in March 2018 1) Workshops - these are to capture LLF views in design areas not yet discussed. They will consist of approximately 25 participants who will be divided into small groups, with facilitators, to work on the key deliverables to be achieved, which will be set out by an introductory presentation at the opening of the workshop. Bus Stops and Crossings Workshop: To look at the design and locations of bus stops and crossings. 19th Sept (evening), approx. 2hrs WSP are preparing the materials for the workshop and invites have been sent out. Trees, Landscaping and Public Space Workshop: To look at tree type preferences, what attendees want from trees along Milton Road and the identification of public space opportunities. 3rd Oct (evening), approx. 2hrs Council Tree officers and independent urban designer Kieran Perkins will advise. 2

2) Detailed Design Groups - these will be small (approx 10 participants) technical groups of experts in the area along with 1-2 LLF representatives and will focus on refining details rather than the broad concept. Elizabeth Way Roundabout - October This will involve discussions with residents with direct access onto the roundabout to inform design. It will also look at the safety of existing access points, utilities in and around the junction and improvement of cycle facilities and planting. Mitcham's Corner - October To consider how the Mitcham's Corner proposal will fit into the Milton Road programme and hence take this into design considerations and modelling the impact this will have on bus lane lengths. Cycle Lane Review between Mitcham's Corner and Elizabeth Way Roundabout - October/November To review cycle lane position for safety and usability and identify tree planting opportunities on SE side of road between Gilbert Road and Elizabeth Way. Bus Lane Lengths - November To review best practice for bus priority at junctions. Model impact of junction bus priority and final designs. Employ sensitivity testing for housing growth scenarios. 3) Public Meetings - Meetings open to anyone where a presentation will be given followed by a Q & A session. Workshop Outcomes - Nov/Dec Results of the workshops and design groups will be presented to the wider LLF. Update on Latest Scheme Design - Jan 2018 Preferred design concept presented to LLF showing final concept design refinements. PB concluded that the aim is to have reached a Preferred Option Design by early 2018 ready for the March Assembly and Board Meeting. 4. DISCUSSION The Chair facilitated questions from the LLF and public which PB and NP answered Q. Why can the bus lane lengths not be decided now? A. Need to rationalise the decisions and factor in growth scenarios to understand junctions and their impact on queue lengths. Want robust analysis based on strong data plus the modelling takes time. It was noted that it is possible to reduce the length of bus lanes in the future but very hard to increase them. The outcome of the decisions on bus lane length will not affect the work conducted at workshops so there is no risk of needing to repeat a workshop. Bus lane length will be looked at, at the end of the process. Q. Do the bus lanes need to be 24/7? Are they for revenue or traffic management as this will effect the answer? 3

A. The project needs to demonstrate bus reliability improvements in order to receive approval. This might mean that it does not need to be 24/7 but would need to consider how to sign and monitor specific time zones without too much street infrastructure. Q. As the plan contains both bus lanes and cycle paths, can restrictions be placed on cyclists preventing them from using the bus lanes because they slow buses down defeating the object of the bus lane? A. Signs can be put up but it is hard to monitor/enforce. Q. What is modelling? Following on from the lack of need for a bus lane out of rush hour, could a video camera be used to record how often buses use the lane during non peak hours? Has data been collected in term time and holiday time? A. Traffic surveys (automatic traffic counts; video surveys from cameras at junctions) have been done and the model built from this information. Data capture has only been done in term time as have to use a neutral (average) month. Modelling enables planning for the future and in this case takes into account the additional housing planned in Waterbeach. As with all Greater Cambridgeshire Partnership projects the Cambridge sub regional model feeds into the model for this project. It predicts wider changes e.g. where employment might grow in the future, impact of changes in travel costs etc. Q. PB and NP have stated that queuing at junctions impacts the length of bus lanes, what about using traffic lights further out to control flow from further back and hence reduce queuing? A. The model considers traffic movement in the future from Waterbeach. Each junction will influence others with signals and these will work together. These can be phased daily and via IA influencing when they change. Q. There have been suggestions that the bus lanes are open to all out of rush hour but what about on street parking in bus lanes as currently occurs between Gilbert Road and Mitcham's Corner? A. Cameras could be used between certain periods and street signage used but this will require more on street infrastructure. Q. Have you taken into account modal shifts? What is the current split between transports modes and has this been properly measured? A. There is data for Cambridge as a whole from the 2011 census. These splits were not to hand to provide a percentage split. Cycle and pedestrian counts have been done. BD informed the meeting that a big engagement exercise is scheduled to begin w/c 25th Sept with South Cambridgeshire residents and commuters. It will look at the mode of transport they currently use, what incentive would be necessary to make them change or if they will never shift. This data will be used to supplement the census data and local surveys. Q. The GCP have previously said that on-site parking would be looked at in a Workshop but there is no mention of it here in the Workshop programme. A. An audit has been done looking at houses with no drive or drop curb. Intention is to contact those identified about parking requirements and then to look into side street parking and lay bys. Will be able to see the audit at the bus stops and crossings workshop. 4

Q. Should the design have just been created by residents? A. The initial concept has been created by residents but now the design groups led by experts will refine this with reduced LLF input. Q. Will the cycle lanes provide the most direct and quick routes for cyclists otherwise they will just use the bus lane? A. Cycle lanes will be as effective as possible but ultimately it is very hard to police cyclists using the bus lane. Chair informed the LLF that Chesterton Community College were keen for its pupils to talk to officers about the cycle paths and have some input. Q. Will electric cars be allowed to use the bus lane? A. This would require a central decision about bus lanes throughout Cambridge as would need to have a uniform decision. Q. Looking at the timescales presented this evening, realistically what impact can the LLF or public have on the proposal at the later public meetings. A. By the end of January the plan will be near completion and only small tweaks are likely to be able to be made however the design refinement will occur at the workshops which the LLF will influence and therefore there shouldn't be problems at the public meetings. People will be able to comment again when it goes to public consultation mid May to end of June. Q. Are smart technologies being put into the models? A. Yes where possible. Q. It was stated that the data is accessible and open but have not seen evidence of this, where is it? A. The first modelling is available online. Q. Why isn't more of this activity advertised online? The workshop for next week isn't on the website. A. The workshop for next week is being proposed at today's meeting so will go on the website tomorrow. Invites have been sent out too for the workshop. Q. Are officers aware of the parking inspector plans for Chesterton Road? Can this project co-ordinate with the Chesterton Road one as it leads onto Elizabeth Way? A. The Project manager has only recently been made aware of this and is looking into this possibility. Q. Can the bus lane lengths be trialled? A. This won't really be very useful as the plan is to look at the traffic flow to 2031 with the new houses that will then exist in Waterbeach. Q. Can we ensure that there are no floating bus stops as these are not suitable for the elderly, disabled or parents with small children A. This is the purpose of the workshop to assess different models. There will be a scoring system rather than a final decision being made. Q. Can the events calendar from the old website be put on the new one as it is very hard currently to navigate around and to find documents for events? 5

A. BD affirmed that this could be done. The current website is the basic version and feedback is being collected now to improve it for its users. Councillor to speak to BD outside of the meeting. Q. What is being done about Copenhagen crossings? The LLF would like to be involved. A. Copenhagen Crossings will be an essential part of the final concept. Each side road will need to be looked at individually. This is a role for the engineers rather than the LLF. It is the technicality of how its delivered rather than where in the route. Q. The bus stop and crossing workshop is on a weekday evening which means it may be hard for bus users to attend. A. This has been a problem in the past however this workshop is by invite and hopefully some of those who chose to attend will be bus users. There will be further work later to engage with the bus users at the point of consultation. Transport hubs and advertising in buses will be used at this point. Q. Can we scrutinise the data officers refer to prior to it being inputted into the model? This will provide confidence that the model is not being manipulated to show what the consultants or GCP want it to show. A. Another consultancy has reviewed the data and modelling. WSP are following the Department for Transport process and guidelines so there is recognised quality control. Q. Currently waiting for the results of a safety audit. Would it not be better to wait for the results to be published before the workshops are held? A. This is just a first stage safety audit and the results are unlikely to be published they are more for the consultants to check that there are no major issues to the overall concept. WPS conduct internal safety audits throughout the process as well. There has been a consultation with residents who exit their properties on to Elizabeth Way roundabout and there are other safety audit stages. Q. Should there not be a representative for bus users on the LLF? A. There isn't really a group to ask for a representative. An LLF member suggested that they could speak to Andy Campbell of Stagecoach. Chair informed the LLF that MP Daniel Zeichner held a meeting recently for bus users so perhaps the LLF could contact him requesting details. Q. Could a notice be put on bus stops that are to be discussed to get bus users views? A. Yes this could be done however it does not have to happen in advance of the workshop. Q. Will there be discussions about the traffic lights on the Elizabeth Way roundabout being turned off at certain times rather than being on 24/7? A. The general design of the concept involves signals 'talking' to each other and adapting phasing depending on traffic build up so there are no plans to turn them off. The Signals Team at CCC do not support turning signals off. There could be a box to monitor traffic coming from the side roads that forces a change of light in quieter periods. Q. Has cycle modelling been done for the Elizabeth Way roundabout? A. Surveys have been done and the results are being taken account of in designs. 6

Q. In general does NP feel that turning traffic lights off would be beneficial as if so this should be taken to the Council? A. No, as then they cannot communicate with other signals in the area. Q. Are there any bus stop designs being put forward where there isn't full separation between road traffic and pedestrians and cyclists? A. There are a number of option and these will be discussed at the workshop however the project team believe that they have already removed these designs, due to safety concerns, from the list of options to be put forward to the workshop. Q. A Councillor was surprised that survey/modelling data and the safety audit were not being made public as they could probably be requested under FOI A. The data and safety audit is not being concealed it was just felt that it didn't bring much to the process as by the time it is in the public domain it has already been incorporated into plans. If the LLF feel that it should be published the project manager will look to do so. 5. ANY OTHER BUSINESS Introductions were not done at the beginning as several LLF members were going to be late. Chair asked all LLF members present to introduce themselves. The Chair asked the LLF and members of the public to sign up for workshops or design groups on the forms at the back of the hall. The Chair thanked all for attending and the meeting closed at 8pm 7