ttachment JRP IR 4.1 - Figures 1-11 Northland (Rivtow Straits) Dock lcan Wharf Boat Ramp Moon Bay Kitamaat Village Marina Kitimat River Eurocan Wharf Ocelot (Methanex) Wharf Proposed NGP Terminal Eastern Limit of Study rea Southern Limit of Study rea Image provided by Spectrum Digital Mapping NTS map sheets 13H15 (1987) and 13I2 (198)..5 1 2 3 4 Kilometers 1:15, NORTHERN GTEWY PIPELINES INC. TITLE: GENERL SITE PLN ND 27 SEPTEMBER 211 PROJECT: SK UTM Zone 9 REV. NO.: 1:15, FIGURE NO.: EG9268 FIGURE 1
ttachment JRP IR 4.1 - Figures 1-11 1947 1954 1963 Northland Dock 1975 Beach Line M o o n B a y 1974 Beach Line 1974 Beach Line 1969 1974 June 1975 Images scanned from erial Photographs BC53 #87 (1947), BC1917 #29 (1954), BC583 #72 (1963), BC7173 #244 (1969), BC568 #32 (1974), & BC5664 #136 (1975). NORTHERN GTEWY PIPELINES INC. SK IR PHOTO REVIEW NORTHLND DOCK TO MOON BY SEPTEMBER 211 EG9268 62.5 125 25 375 5 Meters 1:1, (25) 564-3243 (25) 562-745 UTM9N ND 83 1:1 FIGURE 2
ttachment JRP IR 4.1 - Figures 1-11 1977 1978 1985 1988 23 25 Images scanned from erial Photographs BC7729 #191 (1977), BC7899 #222 (1978), BCC385 #177 (1985), BC8841 #54 (1988), & BCB38 #1 (23), as well as provided by Google Earth Pro (25). 62.5 125 25 375 5 Meters 1:1, NORTHERN GTEWY PIPELINES INC. (25) 564-3243 (25) 562-745 UTM9N SK ND 83 1:1 IR PHOTO REVIEW NORTHLND DOCK TO MOON BY SEPTEMBER 211 EG9268 FIGURE 3
ttachment JRP IR 4.1 - Figures 1-11 lcan Dredged rea Delta Front Eurocan Development Northland Dock Development 1954 1963 1974 Methanex Development Eurocan Development Dredged rea Delta Front 1978 Northland Dock Removed 1985 23 Images scanned from erial Photographs BC1917 No.29 (1954), BC583 No.72 (1963), BC568 #32 (1974), BC7899 #222 (1978), BCC385 #177 (1985), & BCB38 #1 (23). NORTHERN GTEWY PIPELINES INC. NE IR PHOTO REVIEW KITIMT HRBOUR BETWEEN EUROCN ND LCN SEPTEMBER 211 EG9268.125.25.5.75 1 Kilometers 1:25, (25) 564-3243 (25) 562-745 UTM9N ND 83 1:25, FIGURE 4
ttachment JRP IR 4.1 - Figures 1-11 MK Bay Marina MK Bay Marina MK Bay Marina MK Bay Marina Kitimaat Village Kitimaat Village Kitimaat Village Kitimaat Village Old Dock Facilities Old Dock Facilities Old Dock Facilities New Dock Facilities New Dock Facilities 1947 1963 1978 23 Images scanned from erial Photographs BC54 No.1 (1947), BC583 No.72 (1963), BC7899 #222 (1978), & BCB38 No.1 (23). NORTHERN GTEWY PIPELINES INC. SK IR PHOTO REVIEW MK BY MRIN TO KITIMT VILLGE SEPTEMBER 211 EG9268 5 1 2 3 4 Meters 1:1, (25) 564-3243 (25) 562-745 UTM9N ND 83 1:1, FIGURE 5
ttachment JRP IR 4.1 - Figures 1-11 LEGEND 1947 IRPHOTO WTER LINE 1954 IRPHOTO WTER LINE 1969 IRPHOTO WTER LINE 1974 IRPHOTO WTER LINE 1977 IRPHOTO WTER LINE 1978 IRPHOTO WTER LINE 1985 IRPHOTO WTER LINE 1988 IRPHOTO WTER LINE 199 IRPHOTO WTER LINE 25 IRPHOTO WTER LINE 1. DISTORTION IN DIGITIZED WTER LINES IS DUE TO VRITION IN BOTH IRPHOTO PERSPECTIVE ND TIDE LEVELS. 2. IMGE PROVIDED BY GOOGLE ERTH PRO (25). CLIENT LOGO NORTHERN GTEWY PIPELINES INC. Tel. (25) 564-3243 Fax (25) 562-745 ND83 UTM Zone 9 KE 1:25 TITLE PROJECT CHRONOLOGICL SUMMRY OF WTER LINE POSITION 1947 TO PRESENT SEPTEMBER 211 PROJECT NO: REV. NO.: EG9268 FIGURE 6
ttachment JRP IR 4.1 - Figures 1-11 Fig. 2 Plan of Slide rea Fig. 3 Subsoils at Kitimat Delta Images taken from Morrison, 1984. NORTHERN GTEWY PIPELINES INC. SK MORRISON 1984 PLN ND GEOLOGICL SECTION SEPTEMBER 211 EG9268 (25) 564-3243 (25) 562-745 N/ N/ N.T.S. FIGURE 7
-1 ttachment JRP IR 4.1 - Figures 1-11 -14 3-12 -8-2 4-14 "Chute" due to erosion by Kitimat River. See Inset. -14-14 2 19-14 -14-14 Polygon 2 includes failed debris from 1974 event. -12-4 -14-12 -2-6 2 21-14 W a t h l C r e e k D e l t a -1-8 -4 Sidewall Failure Initiation Zone extents delineated by Polygon 2. -12 Kitamaat Village W a t h l C r e e k 5 1 15 2 m DRFT 1:7,5 Polygon 19 Inset Legend Bathymetric Contour (2m interval) Polygons Marine rea with No Bathymetric Data Notes: 1. Background imagery provided by Google Earth Pro (25). 2. Bathymetric contours and hillshade imagery processed from CHS bathymetric dataset (21). CLIENT LOGO NORTHERN GTEWY PIPELINES INC. UTM Zone 9 KE ND 83 1:7,5 1974 INITITION ZONE SEPTEMBER 211 EG9268 FIGURE 9 This drawing was originally produced in colour.
ttachment JRP IR 4.1 - Figures 1-11 12 1. 7-day Moving verage Flow Kitimat River m3/s 1 8 6 4 2 Oct. 17, 1974 pril. 27, 1975.5 1 1.5 2 Tide Stage (m).9.8.7.6.5.4.3.2.1. Oct. 17, 1974 pril. 27, 1975 Flow Tide Stage Plot 1: 7-Day Moving verage Kitimat River Flow and Tide Stage from 1972 to 28 Plot 2: Scaled Products of 7-Day Moving verage Kitimat River Flow and Tide Stage from 1972 to 28 Prince George, BC, CND, V2N 2P9 Tel. (25) 564-3243 Fax. (25) 562-745 CLIENT NORTHERN GTEWY PIPELINES INC. DTE PREPRED: September 211 REV: PREPRED BY: K.Ekman PROJECT No: EG9268 TITLE Figure 1: Combined Tidal and River Flow nalysis Results PROJECT Landslide Generated-Wave Hazard ssessment
-2 ttachment JRP IR 4.1 - Figures 1-11 lcan Site M o o n B a y Methanex Site Former Northland Dock Location -2-8 -6-4 -1 15 Side wall Failure Initiation Zone extents delineated by Polygons 15 and 16. -14 16 Delta Failure Zone extents delineated by Polygon 17. 17 Eurocan Site -2 1-12 -14 2c 18 Polygon 2 includes failed debris from 1975 event. 2 3-2 5 1 15 2 m -2 1:7,5 Legend Slide Scarp Bathymetric Contour (2m interval) Polygons Marine rea with No Bathymetric Data Notes: 1. Background imagery provided by Google Earth Pro (25). 2. Bathymetric contours and hillshade imagery processed from CHS bathymetric dataset (21). CLIENT LOGO NORTHERN GTEWY PIPELINES INC. UTM Zone 9 KE ND 83 1:7,5 1975 INITITION ZONE SEPTEMBER 211 EG9268 FIGURE 11 This drawing was originally produced in colour.