ROTHERHITHE BATH AND ASSEMBLY HALL OFFICIAL OPENING 27 NOVEMBER 1965

Similar documents
ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

BOURNEMOUTH PIER APPROACH BATHS OPENED TUESDAY MARCH 23, 1937

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool

PUBLIC SPA CHECKLIST. Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

CARMACKS. Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course

Permitt pursuant to. statements. for Construction. Application. permit, a signed

PUBLIC POOL CHECKLIST. (This checklist is based on the Ministry of Municipal Affairs and Housing checklist)

Swimming Pools, Hot Tubs and Spas

WOODLANDS PERRANWELL ROAD, GOONHAVERN, TRURO TR4 9JN

KERN COUNTY PUBLIC HEALTH SERVICES DEPARTMENT ENVIRONMENTAL HEALTH DIVISION

THE HOME OF BEAUTIFUL POOL DESIGN

Swimming Pool Plans and Specification Report

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

Chapter 10 SWIMMING POOLS

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014

LONDON PLACE WIMBLEDON OUTSTANDING NEW COMMERCIAL UNITS IN CENTRAL WIMBLEDON.

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 2. DECK AND COPING MUST BE IN GOOD REPAIR AND PROPERLY DRAINED. (.

Florida Department of Health Guideline for Routine Inspection Checklist

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (.

Private Swimming Pool Permit Application

Swimming Pools. Use with the Swimming Pools design guidance note. Design Guidance Note Audit Check List

REVIEW OF ACCESSIBILITY FEATURES

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS

Adams McGillan. Craig Cottage 451 Seacoast Road Magilligan BT49 0LL. Offers Around 149,950. Telephone

NO wiring shall be above the pool within 10, measured horizontally, or under a pool within 5, measured horizontally.

Main Building and raft building viewed from the south side of the Oklahoma River. The white water Main Building anchors the development.

AMITY TWP POOL REQUIREMENTS

ARCHITECTURAL GUIDELINES FOUR-PIECE RESIDENTIAL

CHAPTER XXII SWIMMING POOLS 22 1 CONFORMITY REQUIRED.

RESIDENTIAL SWIMMING POOL REQUIREMENTS

brings water to life Tiled Spas, Swimspas & Vitality Spas

Summary of Standards CMR : Minimum Standards for Swimming Pools

Ref: LCAA ,000. Sand Dunes, Grannys Lane, Perranporth, Nr. Truro, Cornwall

Installation and Maintenance Manual. ECO Filtration Unit with 6-way-Top-Mount-Valve. Art. Nr

Saskatchewan Health S A WATER THEME FACILITY DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

RAWN HILL COTTAGE Mancetter, Nr Atherstone, Warwickshire. The Rural & Development Agents

SUTTON HALL GOLF CLUB

ARCHITECTURAL GUIDELINES ONE-PIECE COMMERCIAL

Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide

Health and Safety Policy Castlebrae. Pool Safe Operating Procedures. Normal Operating Procedures (NOP)

Pool Safety Assessment

Tampa: Davis Islands Recreation Area

Estuary Edge properties

Layout Guidelines. Overview

California Conference of Directors of Environmental Health Recreational Health Technical Advisory Committee September 17, 2003

A Stone s Throw, Alnmouth. Flat Three, 9 Riverbank Road, Alnmouth, NE66 2SD

Chapter 23. Swimming Pools

FINAL EXPRESS TERMS FOR PROPOSED BUILDING STANDARDS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HELATH

SR: FA: PR: CT: All plans must be at least 18 x 24 and drawn to scale (min. ¼ per foot for pools or 1 per foot for spas and wading pools)

Safe Work Practices / Procedures / Instruction ASBESTOS. (See also Asbestos Exposure Control Plan )

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

Series 3000 Layout Guidelines

FIND YOUR OASIS. Sometimes you just need to find your oasis.

Hot Tub Pre-Delivery Guide

Best practice Working safely with fibre cement products

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET

Digester Processes. 1. Raw Sludge Pumping System

1 Exam Prep NSF/ANSI Tabs and Highlights

BRAND-NEW CONTEMPORARY THREE STOREY HOUSE ENJOYING SMART HOME TECHNOLOGY AND STUNNING VIEWS OF FOWEY HARBOUR

Public Swimming Pool. Operator s Guide

Office Use Only Fee Paid

H & R Johnson Tiles Limited, Harewood Street, Tunstall, Stoke-on-Trent ST6 5JZ. Tel Fax Website:

Jump into Joy

Boise Municipal Code. Chapter 9-17 SWIMMING POOLS

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

ACCESS STATEMENT FOR LORD S CRICKET GROUND

Class 2 Gases Learning Tool

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

BY-LAW NUMBER 816. WHEREAS Notice of Motion of the present By-law was given at the Council Meeting held on July 6 th, 2015;

Come on in, the water s lovely!

Definitions for swimming pools, fountains, and similar installations in article 680

WITTICH HALL RENOVATION

Planning Backyard Vacations Everyday

Super-Clean SCT Series SuperClean Sand Filter. Installation Manual

ARCHITECTURAL GUIDELINES FOUR-PIECE COMMERCIAL

After filling the pool with clean water in the summer, two basic factors can take place due to the exposure of water to the sun and the air.

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

TERMITE PROTECTION Material Description Qty Units Cost M/up Labor Total. Termite Control (Slab) 188 m Subtotal

TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES. Russell M. Arnold Jr., P.E. Director/Town Engineer (860)

FIND YOUR OASIS. Sometimes you just need to find your oasis.

Session Presenter. Session Logistics. Designing Safer Aquatic Facilities 25/04/2013

The swimming pool brand

Check with local zoning official for property line distance requirements.

LEGIONELLA MANAGEMENT PROCEDURE

PUBLIC SWIMMING POOLS REGULATION

City of Lockport Above Ground Pool Regulations

THE EAGLE CREEK PLAN BN-1B W/BASEMENT

Fire Safety Hot Work Permit Policy/ Procedures

The Modular Pool Professionals Judged Best Modular Pool in Australia by SPASA

VICTORIA 67 - Flagship Class

Report on Yearsley Pool - December 2010

Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: Phone

71, Severn Bank Park, Stourport On Severn

NEW SWIMMING POOL PLAN APPROVAL REQUIREMENTS

Lecture 10 : Sewer Appurtenances

stainless steel spas classic collection custom spas swimspas

Transcription:

ROTHERHITHE BATH AND ASSEMBLY HALL OFFICIAL OPENING 27 NOVEMBER 1965

Consultants for Architectural, Structural Mechanical and Electrical Services: Sir Frederick Snow & Partners, Ross House, 144, Southwark Street, London, S.E.1 Chief Architect: W. S. A. Williams, Esq., Dipl. Arch. (Hons.) A.R.I.B.A. Quantity Surveyors: W. G. Edwards & A. Avery Hall, F.F.R.I.C.S. 75-76 Blackfriars Road, London, S.E.1 Main Contractor: C. J. Sims Limited, 2, Victoria Street, S.W.1 One of the main factors which influenced the design of the new baths was the desire to provide a large outdoor area for sunbathing which would be readily accessible from the swimming pool. To achieve this, the three units which form the new baths have been given a U-shaped layout in plan. The swimming pool block is on one side, the Assembly Hall on the other and the two are connected by the cafeteria and sun terrace, with a grassed and paved patio in between. The principal cladding to the swimming bath block consists of large precast concrete units with an exposed aggregate finish of white calcined flint. These panels contrast with areas of dark blue-black bricks. Along the Lower Road frontage a band of white textured concrete extends from the swimming block across the roof of the cafeteria where it forms a handrail as far as the assembly hall. This band acts as a tie to the assembly hall structure which is predominantly in the same white textured concrete. The assembly hall also has panels of dark blue-black brick for contrast. To form a highlight along the main Lower Road frontage, the whole of the cafeteria wall is covered with an abstract tiled mural, the tiles being both coloured and textured. Swimming Pool Block: The Swimming Pool block as well as housing the pool, also provides laundry and slipper bath facilities. The pool itself is 110 ft. long by 42 ft. wide with a depth of 12 ft. 6 in. at the deep end and 3 ft. at the shallow end, and is designed mainly for general recreational purposes but can be used for racing and sports events and galas if so desired. Three and five metre high diving boards are provided.

The lighting fittings are mainly fluorescent and are recessed into the suspended ceiling. The principal glazing to the bath hall is provided along the north west side of the building which is almost totally glazed. The lower portion of this glazing consists of sliding doors so that in the summer months the whole side of the pool may be opened to the sunbathing enclosure allowing the free move-ment from one area to the other. There is also a glazed area in the south east wall overlooking the children's play area associated with the laundry. The pool is clad in ceramic tile and a scum channel is incorporated in the four sides of the bath. The bath surround is finished in mosaic tile with a non-slip nosing at the bath edge. At the shallow end of the pool, walk-in steps are provided recessed so as not to intrude into the main bath area. An interesting feature of these boards is that they hang from the roof structure and therefore do not obstruct the pool surround. It is the first time that this method has been used in this country. The main entrance to the swimming pool is situated in Lower Road. Patrons will pay for admission at the ticket office in the entrance hall and will then pass to the appropriate changing room. The changing cubicles are formed in prefabricated tiled partitions and changing room walls are tiled to ceiling height. The floors throughout the changing room area and rack storage are of ceramic tile with a non-slip finish. Ceilings throughout the changing room and storage areas are suspended to conceal the plenum ducts behind. All ventilation to these rooms is artificial, as is the lighting.

Vertical ladder type steps are provided in the deeper parts of the pool, again recessed. The pool hall walls are tiled to a height of approximately 11 ft. and above this height the walls are lined with an acoustic absorbent material. The suspended ceiling over the pool comprises a perforated stoved enamelled aluminium strip with acoustic absorbent behind. This large area of acoustic absorbent material will reduce the excessive reverberation usually found in bath halls. Ventilation to the swimming pool is by means of a plenum system, the ducts for which are concealed behind the suspended ceiling. Artificial lighting to the pool is by means of recessed fluorescent fittings, access to which is gained by walkways above the suspended ceiling. Slipper Baths and Steam Baths: These are situated at first floor level in the block facing Gomm Road. Twenty-four slipper baths and ten steam baths complete with showers and resting facilities are provided. The floor finishes to the slipper bath and steam bath cubicles are of ceramic tile with a non-slip finish whilst the corridors between cubicles are of plain ceramic tile. The cubicles are formed of prefabricated tiled partitions and the structural walls are tiled to ceiling height. Ceilings throughout are suspended to conceal the services behind. Ventilation and lighting alike are provided by artificial means, the ducting, etc. being concealed by the false ceiling. Light fittings are of the tungsten type to the individual cubicles and fluorescent to the larger general areas. Laundry: This is located at ground floor level in the swimming pool block and has twelve automatic washing machines together with hydro-extractors and dryers, ironing facilities are also provided. Cafeteria and Sun Terrace: The cafeteria links the assembly hall and swimming pool block and may be approached from the entrance halls of both these units. A central servery is provided with facilities for light refreshments and along the counter facing the assembly hall are hot

cupboards for use in conjunction with the assembly hall letting facility. The roof of the cafeteria which is intended for use as a sun terrace and a relaxation area is approached from the patio by means of an external staircase. The Assembly Hall: The Assembly Hall is situated in Lower Road at the north west end of the site and is available for local events such as club activities and wedding receptions. It has a small stage together with two dressing rooms and will accommodate approximately 300 people. A car park for 27 cars is provided beneath the Assembly Hall, together with space for motor cycles. to atmosphere as required. Sound attenuation units are included for the quiet operation of the plant. Domestic hot water services are supplied from two storage type calorifiers which raise the required amount of water from 50 F to 150 F. The boiler installation consists of three packaged oil fired high pressure steam boilers, one of which acts as a complete standby. The whole installationis completely automatically controlled, and is fed by two oil storage tanks which house three weeks' storage at maximum plant loading, the oil having a viscosity of 950 seconds, The tanks are located in a separate compound built in one corner of the boiler house. Engineering Services: The water content of the main swim and the precleanse pool situated in the patio area is sterilised by the break point chlorination method and is re-circulated once every 3+ hours, passing through a primary filter in the suction line and then via the pumps into two sand pressure type filters. From the filters, the water passes into a heat exchanger, is finally discharged into the swim and precleanse pool via a series of outlets in the periphery of each. Heating and Ventilating: Three types of heating are used for the new baths, floor heating, plenum or warm air heating, and hot water radiators. The plenum heating plant is installed in a central plant room housed in the basement. Air is drawn in through a fresh air intake duct passing through a dry fabric filter and a heater by means of axial flow fans and then discharged into the respective areas, A percentage of air extracted from each area is returned to the basement plant for recirculation or discharge