Fidalgo Pool and Fitness Center Facility Audit Anacortes, WA

Similar documents
GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

Chapter 10 SWIMMING POOLS

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

KERN COUNTY PUBLIC HEALTH SERVICES DEPARTMENT ENVIRONMENTAL HEALTH DIVISION

Understanding and Compliance of the Virginia Graeme Baker Pool & Spa Safety Act

Aquatic Facility Evaluation City of Merriam, Kansas. Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014

Saskatchewan Health S A WHIRLPOOL DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

PUBLIC SPA CHECKLIST. Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1

ANTI-ENTRAPMENT PLAN

ENVIRONMENTAL HEALTH DIVISION POOL SAFETY 2017 UPDATES

Non-Residential: Any swimming pool or spa that is not used at a single-family residence.

Public Swimming and Bathing Facilities Operators Guide 2018

FINAL EXPRESS TERMS FOR PROPOSED BUILDING STANDARDS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HELATH

CHAPTER XXII SWIMMING POOLS 22 1 CONFORMITY REQUIRED.

Office Use Only Fee Paid

1 Exam Prep State Pool Contractor Feedback Questions and Answers

FACILITY CONDITION ASSESSMENT

Dan Johnson, CBP Swim, Incorporated Lead Dog Aquatic Consulting

Existing Rule Language Compared to Proposed Rule Language

REQUEST FOR PROPOSAL FOR WATERPROOFING STRUCTURAL ENGINEERING

Summary of Substantive Changes between the 2003 and the 2014 editions of ANSI/APSP/ICC 1 American National Standard for Public Swimming Pools

Cynthia Arias Pollution Control Coordinator

The Virginia Graeme Baker Pool and Spa Safety Act. by and does not necessarily represent the views of the Commission.

Jennifer Hatfield FSPA Government Relations Consultant J. Hatfield & Associates, PL

NEEDS ASSESSMENT STUDY HIDDLESON POOL

ARCARCHITECTS.COM 1101 E PIKE STREET, FLOOR 3, SEATTLE WA P F

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 2. DECK AND COPING MUST BE IN GOOD REPAIR AND PROPERLY DRAINED. (.

PUBLIC POOL CHECKLIST. (This checklist is based on the Ministry of Municipal Affairs and Housing checklist)

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (.

Swimming Pools, Hot Tubs and Spas

Spas Hotels/Resorts Apartments & Condominiums Campgrounds Health Clubs Medical Clinics Waterparks

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

GENERAL AND STRUCTURAL DESIGN; EQUIPMENT STANDARDS. (i) Constructed of materials which are considered to be nontoxic to humans and the environment;

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE

MDX² INSTALLATION MANUAL (RETROFIT FIBERGLASS, VINYL & CONCRETE POOLS WITH MDX)

Healthy Pools Just What the Doctor Ordered. Harold Brown Spear Corporation

SWIMMING POOL/SPA WADING POOL/SPRAY GROUND REQUIREMENTS

STATE UNIVERSITY COLLEGE AT ONEONTA SWIMMING POOL PROCEDURES March 2012

Swimming Pool IAQUALINK WEB CONNECT

TITLE XIV POOL AND SPA SAFETY

POOL CARE GUIDE. The E-Z Clor System To Perfect Pool Water.

GUIDELINE FOR MITIGATING SUCTION HAZARDS IN POOLS

Swimming Pool Plans and Specification Report

Welcome to the PMG Educational Program. Sponsored by:

Swimming Pool Requirements

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014

I. Site Information. Pump Information

1 Exam Prep NSF/ANSI Tabs and Highlights

SR: FA: PR: CT: All plans must be at least 18 x 24 and drawn to scale (min. ¼ per foot for pools or 1 per foot for spas and wading pools)

NEWS: 20% discount on service agreements signed before 1st March 2010

Swimming Pool Requirements Packet

VILLAGE OF ISLAND PARK LOCAL LAW NO. 12 OF THE YEAR A local law Private Swimming Pools

Pool Standards 2014 (Amended 2017)

Florida Department of Health Guideline for Routine Inspection Checklist

NEW SWIMMING POOL PLAN APPROVAL REQUIREMENTS

For Establishing and Maintaining Your Spa using PROtech Spa Chemicals

Boise Municipal Code. Chapter 9-17 SWIMMING POOLS

SWIMMING POOL REQUIREMENTS

City of Los Angeles Department of Building & Safety Disabled Access Section Supplemental Plan Review Checklist No. 8 RECREATION FACILITIES

GRIDLEY SWIMMING POOL Gridley, California REHABILITATION / RENOVATION FEASIBILITY REPORT. February 22, 2016

NOTICE WARNING DANGER SDX2 HIGH FLOW SAFETY DRAIN FOR CONCRETE OWNER S MANUAL MAINTENANCE & INSTALLATION GUIDE. VGB 2008 Compliant

Summary of Standards CMR : Minimum Standards for Swimming Pools

Recommended New Draft MAHC Module Section Language Basis for Change Reference Citation

Family Swimming Pool Planning Guide

TITLE XIV POOL AND SPA SAFETY

1 & 3 Meter Tower CAT 1M 203R RIGHT MOUNT CAT 3M 203R CAT 1M 203L LEFT MOUNT CAT 3M 203L CAT 1M 203D DUAL MOUNT CAT 3M 203D

Facility Assessment and Project Study. New Prague Municipal Swimming Pool New Prague, MN

Saskatchewan Health S A WATER THEME FACILITY DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

B o a r d o f H e a l t h

VIRGINIA GRAEME BAKER POOL & SPA SAFETY ACT

SERVICE BULLETIN This service bulletin is for Accu-Tab Blue Calcium Hypochlorite Tablets (EPA Reg. No )

Swimming Pool Requirements

RESIDENTIAL SWIMMING POOL REQUIREMENTS

NC Department of Environment and Natural Resources 15A NCAC 18A.2500 SECTION PUBLIC SWIMMING POOLS

COMPLIANCE WITH STANDARDS, REGULATIONS AND ORDINANCES

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

Cordova, Recreation & Park District Cordova Community Pool Evaluation

CONSTRUCTION PLAN APPROVAL PROCEDURE For Public Swimming Pools and Spas

Pool Water Chemistry Guide

Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground

Accu-Tab PowerBase 3012AT by Axiall Corporation

Copies of your pool operator certificate as well the operating permit must be posted at the pool. The operator s certificate is your certificate that

SECTION SWIMMING POOLS

Complete FAQ. Contents. General 1 Health 2 Technology 3 Equipment 4 Chemistry 7 Commercial 8

Pool Safety Assessment

Accessible Swimming Pools and Spas

ADA Access Standards for Swimming Pools, Wading Pools, and Spas

Tampa: Davis Islands Recreation Area

the strength behind the products you trust

Countrywide Pools Northam

Global Lift ADA Compliance

Arizona Swimming Pool Design and Planning Guide Copyright AZWPC, All Rights Reserved

Your spa and the water

AMITY TWP POOL REQUIREMENTS

Pool and Spa Operator Handbook, Highlight

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Transcription:

Fidalgo Pool and Fitness Center Facility Audit Anacortes, WA In Association With ARC Architects

Table of Contents Table of Contents... 2 INTRODUCTION... 3 FIDALGO POOL AND FITNESS CENTER SWIMMING POOL INFORMATION... 5 ADMINISTRATIVE CODE... 6 POOL ITEMS... 7 A. Structure and Finish... 7 B. Perimeter Overflow System... 9 C. Main Drains... 10 D. Inlets... 11 E. Ingress and Egress... 12 F. Depth Markings and Warning Signage... 13 DECK ITEMS... 14 A. Deck... 14 B. Starting Blocks... 15 C. Diving Boards... 16 POOL MECHANICAL ITEMS... 17 A. Piping... 17 B. Pump... 18 C. Flow Meter... 19 D. Filtration System / Surge Tank... 20 E. UV System... 21 F. Chemical Treatment System... 22 G. General Observations... 23 OPINION OF PROBABLE COST... 25 2/17/2017 2 Fidalgo Pool and Fitness Center, WA

FIDALGO POOL AND FITNESS CENTER INTRODUCTION Counsilman-Hunsaker, in association with ARC Architects, was authorized by the Fidalgo Pool and Fitness Center to provide a swimming pool audit in January 2017 on the Fidalgo Pool. The indoor pool was constructed in the 1975 and is a T-Shaped 6-lane, 25-yard by 6-lane, 25 meter competition pool. Counsilman-Hunsaker was commissioned for this audit to assist in identifying items that are substandard or not operating as designed, as well as to offer insight to help the owner consider various options for the future of the pool. Providing a safe and sanitary environment for the users of the pools is the highest priority for Counsilman-Hunsaker and the Fidalgo Pool and Fitness Center. A site visit to the aquatic facilities was performed by George Deines from Counsilman-Hunsaker on January 23, 2017. The purpose of the site visit was to evaluate the existing indoor pool including the pool and mechanical system. The Fidalgo Pool is in declining physical condition, and the mechanical system is in need of a complete renovation. Counsilman-Hunsaker will typically assign a life-span of 40-50 years to an indoor aquatic center. At 42 years, Fidalgo Pool and Fitness Center in the middle of this timespan. There are several areas where the pool does not meet the current State of Washington Code. The depth markings around the perimeter of the pool are incorrect, when compared to the actual depth of the pool. The current perimeter overflow system cannot handle 100% of the pool s flow rate as required by code. The pool does not have No Diving markings around the perimeter of the shallow end. The pool floor drops immediately from a depth of 4 feet to a depth of 12 feet. The administrative code as well as the industry standard requires a maximum slope of 1:3 from shallow water to deep water. The pool surface has significant staining in both the shallow and deep ends and surface etching has started to occur. ADA requires two means of access for pools with a perimeter larger than 300 lineal feet. A primary means of access is a pool lift and a secondary means would include a stair entry with the appropriate hand rail spacing. Currently the pool has only one means of access. 2/17/2017 3 Fidalgo Pool and Fitness Center, WA

There is insufficient storage space for deck equipment. Spectators are unable to see the first two lanes from the spectator seating area on the second level. The current mechanical system is functioning; however, within the next 5-7 years this equipment will begin to reach the end of its useful lifespan. If plans call for extending the life of Fidalgo Pool for more than 5-7 years, a complete mechanical room renovation should be considered. Counsilman-Hunsaker typically assigns a 40 to 50 year lifespan to indoor aquatic facilities. The Fidalgo Pool and Fitness Center is within the recommended age for a substantial renovation or new construction. The findings of the facility audit indicate that the pools have a multitude of deficiencies that require major repairs. It is the Consultant s opinion that the pools are nearing the end of their useful life expectancy, and that the cost effectiveness of undertaking major repairs or renovations to facilities of this age and condition should be carefully evaluated as viable long term solution. It is recommended that the option to replace the facility with a newly constructed aquatic center designed to meet the evolving needs of the Anacortes community and provide compliance with all applicable codes and standards should be given consideration for the purposes of comparison. 2/17/2017 4 Fidalgo Pool and Fitness Center, WA

FIDALGO POOL AND FITNESS CENTER SWIMMING POOL INFORMATION Facility Opening 1975 Lap Pool Surface Area: Lap Pool Total Volume: Flow Rate: Turnover: 5,040 sq/ft 280,000 gallons 803 GPM 5.8 Hours 2/17/2017 5 Fidalgo Pool and Fitness Center, WA

ADMINISTRATIVE CODE The state administrative swimming pool code referenced as Washington State Code in the report is as follows. Washington Administrative Code Chapter 246-260 WAC Water Recreation Facilities Applicable Federal Code Section: Virginia Graeme Baker Pool and Spa Safety Act (VGB) ASME/ANSI A112.19.81 Signed into Law on December 19, 2007 CPSC Staff Interpretation of Section 1404 issued on June 18, 2008 Americans with Disabilities Act (ADA) U.S.C. 12101 et seq. Signed into Law on July 26, 1990 The administrative code requirements must be satisfied if a major modification of the pool is undertaken or if a particular item or piece of equipment is in need of repair. The recommended repairs address all administrative code items identified in this report. 2/17/2017 6 Fidalgo Pool and Fitness Center, WA

POOL ITEMS CH Observations, Comments and Recommendations: A. Structure and Finish Constructed in 1975, the concrete pool shell is now 42 years old. The plaster pool finish features tile trim, including tile lane markings and wall targets. The gutter is tiled with 1 x 1 tiles, in between the tile pool deck and the plaster pool finish. The existing tile and plaster pool finish shows significant signs of staining, both on the pool floor and on the pool walls. There are also signs of etching of the pool surface. Staining of the pool surface can be attributed to poor water balance or metals found in the pool water. Fill water which is high in copper or iron must be removed or severe staining can result. Staff should ensure the pool water balance is adequate to prevent scaling and corrosion. Rust colored stains can be a clear indication that the ph of the pool water is out of balance. The low ph levels are typically caused by overfeeding muriatic acid. Corroding of cast iron piping remaining in the system is another potential source for this staining. This is a common issues in indoor pools. The surface can be cleaned when the pool is drained for routine maintenance, but with the extent of the staining a new application of plaster or quartz aggregate surface such as Diamond Brite is recommended. The pool floor drops immediately from a depth of 4 feet to a depth of 12 feet. The Washington administrative code as well as the industry standard requires a maximum slope of 1:3 from shallow water to deep water. Assuming a future slope modification occurred at the current 4 foot depth, the slope and depth of the diving well would no longer be in compliance. 2/17/2017 7 Fidalgo Pool and Fitness Center, WA

2/17/2017 8 Fidalgo Pool and Fitness Center, WA

B. Perimeter Overflow System A fully-recessed gutter with an all-tile finish is provided for surface skimming around the pool perimeter. The gutter system is in fair condition and has noticeable staining of the tile, but very few tiles were observed to have delaminated. The pool gutters drain by gravity to the surge pit through a 10 pipe that can handle up to 672 GPM at 3 ½ ft/sec. This pipe can handle 83% of the overall flow for the pool. The current Washington Administrative Code requires overflow gutters shall be capable of continuously removing no less than 100% of the recirculated water, which is not met with the current flow rate and gutter capacity. The ability for the gutters to be able to handle 100% of the pool s flow is generally recommended and an industry design standard. 2/17/2017 9 Fidalgo Pool and Fitness Center, WA

C. Main Drains There are two (2) 24 x 24 square, fiberglass main drain covers located in the deep part of the competition pool. The main drains appear to have secured grate covers that are suction and hair entrapment certified as required by the Virginia Graeme Baker Pool and Spa Safety Act (VGB), ASME/ANSI A112.19.81. All main drains with dimensions 18 x 23 or smaller are classified as blockable and must have a VGB stamped and certified unblockable grate cover with tamper proof screws. The federal regulations of VGB were passed by Congress in 2008 and are designed to reduce the potential for suction and hair entrapment in commercial swimming pools at all suction outlets (e.g. main drains, skimmer equalizer lines, etc.). The Consumer Product Safety Commission (CPSC) is tasked with federally enforcing all VGB regulations, but due to the vast number of commercial swimming pools in the United States, enforcement most commonly is the responsibility of the local governing agencies (e.g. public health departments, building departments, etc.). Staff report that the main drain is gravity-fed. It is routed to a single 10in pipes that is rated 672 GPM at 3 ½ feet per second. The CH standard is for the main drain to be able to handle 100% of the circulation, which is not met by the single 10 pipe at the observed flow rate of 803 GPM. The pool drawings indicate the main drains are under suction and the Washington State Code allows for a flow of 6 feet per second. The 10 pipe could handle up to 1,343 GPM. Staff should confirm if the main drain has a direct or indirect piping connection between the main drain and the pump. 2/17/2017 10 Fidalgo Pool and Fitness Center, WA

D. Inlets The pool is equipped with 12 floor inlets in the shallow end and 6 floor inlets in the deep end. The inlets are fed with a 6 supply line that is rated for up to 812 GPM at 8 feet per second and 975 GPM at 10 feet per second. The flow rate of 803 GPM falls within the rating for the current piping. Of the two inlet systems (floor and wall), the floor inlets are usually recommended over wall inlet systems for larger pools. The reason is that a relatively equidistant location of the floor inlets provides a more uniform distribution of filtered water over the floor. This situation affects, in a positive way, the subsurface turbulence created by the swimmers overhead. The floor system also provides a sweep and clean movement of the water across the pool floor, picking up small dirt and debris. The Washington Administrative Code requires inlets to be located on the bottom of swimming and wading pools over twenty-five hundred square feet and spa pools greater than ten thousand gallons. The current inlets meet this requirement. 2/17/2017 11 Fidalgo Pool and Fitness Center, WA

E. Ingress and Egress The pool has deck-anchored stainless steel grab rails with embedded steps located around the pool perimeter in the wall. A compliant Americans with Disabilities Act accessible means of entry is provided for the pool. The ADA Act requires that a swimming pool with a perimeter that is more than 300 have at least two accessible means of entry and requires accessible lifts to be capable of unassisted operation from both the deck and water levels. Controls and operating mechanisms shall be unobstructed when the lift is in use. The pool also has two fiberglass stairs with stainless steel grab rails as an alternative means of entry and exit for the pool. The handrails on the stairs are 27 apart and do not comply with the ADA standard 1009.6.2 Handrails, which stipulates handrails must be within 20 and 24. 1009.6.2 Handrails. The width between handrails shall be 20 (510 mm) minimum and 24 (610 mm) maximum. Handrail extensions required by 505.10.3 shall not be required on pool stairs. 2/17/2017 12 Fidalgo Pool and Fitness Center, WA

F. Depth Markings and Warning Signage Tile horizontal depth markings are located on the tile deck around the perimeter of the pool, and inside the gutters below the deck. The deck tile markings are 7 inches tall while the gutter tile markings are 5 inches tall. This meets the Washington State Code requirement that depth markings should be Located on the horizontal surface of pool coping or deck of pools within eighteen inches of the water's edge, easily readable while standing on the deck facing the water, in numbers at least four inches high. The measurements of the pool depth markings are off by roughly 2 inches. Staff reports the gutter lip was raised by two inches several years ago, but the depth markings were never adjusted to reflect the new depth. 2/17/2017 13 Fidalgo Pool and Fitness Center, WA

DECK ITEMS CH Observations, Comments and Recommendations: A. Deck The pool deck is in fair condition with minimal observable cracks. The perimeter trench drain appears to be working effectively as standing water was not observed at the time of the site visit. There were areas of the deck/tile gutter connection that had sharp edges that could cause injury to pool guests, as well as a few areas were the tile had been chipped or in some instances popped off. This facility meets the Washington State Code requirement for pool decks below. For pools fifteen hundred square feet or larger, walking deck surfaces must be at least six feet wide: (i) Around the entire perimeter of outdoor pools; (ii) On fifty percent of the perimeter of indoor pools; and (iii) The remaining fifty percent perimeter of the indoor pool must be a minimum of four feet wide. 2/17/2017 14 Fidalgo Pool and Fitness Center, WA

B. Starting Blocks The pool has nine (9) starting blocks that are interchangeable and moved in between the shallow end and deep end of the pool, depending on the course length used by the competitive swim teams. This depth requirement meets the National Federation of High School Swimming (NFHS) requirement of a 4 foot minimum depth of water and that the blocks are a maximum of 30 inches above the surface of the water. The starting blocks are an older model that does not meet the current expectations for competitive swimming. Today s industry standard for starting blocks includes dimensions of 24 x 32 for the platform. The current blocks are 22 x 22 which is close to the minimum standard for starting blocks. These blocks meet the Washington State Code that requires protective equipment when not in use. If water depth is less than nine feet, starting blocks must be removed or covered with protective equipment unless used by competitive swimmers trained in proper use of starting blocks. 2/17/2017 15 Fidalgo Pool and Fitness Center, WA

C. Diving Boards A single 1-meter diving board is provided. The board is mounted on a concrete pedestal and is in good condition. When comparing the existing diving well dimensions to the dimensional requirements of NFHS, FINA and the NCAA, the following items were observed: (diagrams illustrating these items are found below) The pool meets the current 1-meter depth/slope requirement for NCAA, FINA and High School. 2/17/2017 16 Fidalgo Pool and Fitness Center, WA

POOL MECHANICAL ITEMS CH Observations, Comments and Recommendations: A. Piping The visible, above ground recirculation piping for the pool in the pool mechanical room is Schedule 80 PVC piping, which is in good condition. According to staff, the original underground cast iron piping still exists and has never been replaced. Corrosion is noticeable at some of the pipe connections both the bolts and the valves, but overall the majority of piping and connections are in good condition. There is visible corrosion on several of the pipe supports throughout the mechanical room, and the pipe from the pool heater has significant corrosion. Directional arrows are provided on the exposed piping as per industry standards. The valves in the mechanical room have been replaced as necessary. Several of the overhead pipe supports show significant signs of corrosion. With a pool of this age it is not uncommon that some of the underground piping has corroded to the point of failure. The corrosion build up on the interior of the pipes also impact pipe velocities and could be contributing to the pool surface staining. A camera test could be done to determine the integrity of the piping. 2/17/2017 17 Fidalgo Pool and Fitness Center, WA

B. Pump Both pumps and motors have been recently replaced and are alternately used on a monthly basis. They do have visible signs of corrosion, but appear to be in good condition. The recirculation pump is fed by a 20 horsepower motor. A strainer is provided for the pump as required by the administrative code. The GPM rating for the pump was not verified by nameplate during the site visit. The pump impeller should be statically and dynamically balanced and trimmed for the specified design condition. A coating system to protect the pump cast iron from corrosion is an industry standard on all non-bronze pumps. Staff should confirm the impellers are coated to ensure their expected lifespan. A variable frequency drive is installed on the circulation system, model Eco-Flow-C. A variablefrequency drive (VFD) is a system for controlling the rotational speed of an alternating current (AC) electric motor by controlling the frequency of the electrical power supplied to the motor. Staff report the VFD was installed in 2014 and it is operating correctly at this time. 2/17/2017 18 Fidalgo Pool and Fitness Center, WA

C. Flow Meter There are two flow meters installed on the pool, one is an acrylic flow meter and is installed on the pressure piping back to the pool, downstream from the filter, which is the preferred place for mounting. The other is tied directly into the BecSys chemical controller. Flow sensors should be installed with at least ten pipe diameters downstream and five pipe diameters upstream on a straight run of piping. The flow meter was giving a reading of 803 GPM which places the turnover at 5.8 hours. According to the Washington State Code, Owners of swimming pools shall design and maintain water treatment recirculation rates to completely turn over the entire pool water volume of pool in six hours or less. The Fidalgo Pool meets this requirement. 2/17/2017 19 Fidalgo Pool and Fitness Center, WA

D. Filtration System / Surge Tank The pool uses open-air vacuum Diatomaceous earth (DE) filters for its filtration. This system was installed during the initial construction. While these filters have served the facility well and provided ample water quality over the years, it is an antiquated system and should be replaced during a facility renovation with either high-rate sand filtration or regenerative media filtration. The size and capacity of these filters could not be verified by nameplate on site during the audit, but staff notes have estimated each disc at 26 inches of diameter, equaling 121 SF of total surface area. The standard flow rate for this type of filtration system is to stay within 1 to 3 GPM/SF of surface area. With a flow rate of 803 GPM, the filtration rate is calculated at 6.6 GPM/SF which exceeds the industry standard for this type of filter by more than double. Washington State Code requires the capacity in gallons of the surge tank to equal the square footage of the pool. This would require the surge tank to hold 5,040 gallons. ` 2/17/2017 20 Fidalgo Pool and Fitness Center, WA

E. UV System The pool mechanical system contains a Hanovia Ultraviolet Light Water Treatment System (UV). UV becomes beneficial in water treatment applications due to its ability to eliminate combined chlorine (also known as chloramines ) and kill chlorine resistant pathogens. While UV does break down free chlorine, the good form of chlorine used for pool disinfection, it is still highly recommended due to its ability to eliminate chloramines. Lower levels of chloramines lessens the corrosive offgassing which attributes to the corrosion of deck equipment, HVAC, and internal structures of some facilities. Additionally, chloramines are typically responsible for the odor and irritation experienced by athletes, coaches and staff. Eliminating chloramines creates a healthier and more enjoyable environment for facility users and staff. A UV system should be included in any future mechanical system renovations, or the construction of a new aquatic facility. Not only will UV systems kill pathogens and chloramines, but they will also eventually provide cost savings. It is common for a UV units to help lengthen and enhance the life expectancy of building materials, dehumidification units, etc. due to the elimination of combined chlorine before it is released into the air and causes corrosion of these materials. 2/17/2017 21 Fidalgo Pool and Fitness Center, WA

F. Chemical Treatment System Currently the pool chemicals are located in the same area as the pool mechanical room. The pool is sanitized with Calcium hypochlorite (tablet chlorine) through a Pulsar 3 system and both CO2 and muriatic acid are used as the ph buffer. The 50 lb. buckets of calcium hypochlorite are stored inside the pool mechanical room on a platform above the surge tank. The muriatic acid and CO2 are stored in the same area, next to the chemical controller. According to the Washington State Code, Owners shall provide a separate chemical storage area or room that conforms to manufacturer's requirements for each chemical used in the pool area. A separate dedicated and ventilated chemical storage room for both the sanitizer and ph buffer is recommended and is the current industry standard. The existing chemical storage area does not meet the current requirement or standard. Dedicated chemical storage spaces should be included in any future plans, whether for a renovation or a new facility. The pool is controlled by a BecSys 5 chemical controller. The chemical controller automatically adds chlorine and the ph buffer, maintaining the proper chemical balance throughout each day. The controller is in good working condition and is appropriate for this type of usage. 2/17/2017 22 Fidalgo Pool and Fitness Center, WA

G. General Observations There is not enough storage space at the Fidalgo Pool and Fitness Center. Currently the pool deck is used for storage for items such as the Daktronics timing equipment, lane ropes for the 25 meter course length, and swim lesson equipment (such as kickboards, floats and underwater benches). The deck space behind the starting blocks on the 25 meter course length is insufficient. Swim team staff report that during swim meets, there is not adequate room for timers, swimmers and coaches in this area, specifically during relay swims. The first two rows in the upstairs spectator seating for the swimming pool are not able to see the first two lanes during swim meets. The ceiling material in the Fidalgo Pool area is not what is typically specified for indoor natatorium environments. The ceiling panels in a natatorium are usually made of galvanized steel with a coating of high-build epoxy coating. Other materials can be precast concrete, wood or aluminum. As with other materials in a natatorium, acoustical wall and ceiling must be corrosion resistant and interface with a vapor barrier, if necessary. User groups reported the air quality in the second-level spectator seating area is poor. Spectator areas should have higher air velocities of cool air (40 ft/min to 50 ft/min). Ceiling fans have also been used to improve spectator comfort. High velocity warm air in the face of spectators can be uncomfortable; therefore, cool air should be introduced over any raised spectator gallery for a major venue facility. Significant corrosion exists around the door frame on the east wall of the natatorium. 2/17/2017 23 Fidalgo Pool and Fitness Center, WA

2/17/2017 24 Fidalgo Pool and Fitness Center, WA

OPINION OF PROBABLE COST The following spreadsheet provides the Opinion of Probable Construction Cost to repair Fidalgo Pool for the recommendations detailed in the report. Fidalgo Pool Renovation Unit Cost / Unit Cost Opinion of Cost Opinion of Cost ALL POOLS -- REPAIR $747,400 $747,400 Plaster pools and tile lane lines (short and long course) SF 5,040 35 $176,400 Underground Piping Replacement Allowance 1 75,000 $75,000 Deck Replacement SF 4,000 50 $200,000 ADA Lift / Stairs Allowance 1 10,000 $10,000 Mechanical Room Equipment / Renovation Allowance 1 200,000 $200,000 Surge Tank Allowance 1 35,000 $35,000 Chemical Storage Rooms SF 100 300 $30,000 Starting Blocks Quantity 6 3,500 $21,000 Repair Construction Costs 747,400 747,400 Site Construction Costs $25,000 $25,000 Subtotal $772,400 $772,400 Inflation (1 year) 5% $38,620 $38,620 Contingency 20% $154,480 $154,480 Indirect Costs 10% $77,240 $77,240 Opinion of Project Costs $1,042,740 $1,042,740 *This cost estimate does not include any modifications that might be required to address the pool slope. The opinion of probable construction costs is based on current 2017 prices. This report is based on information that was current as of February 2017. The preceding opinion of probable costs estimates are based upon a protocol in which a general contractor or swimming pool contractor executes all of the tasks with its own labor and that of qualified subcontractors. It is recognized that the Consultant or Owner have no control over the cost of labor, materials or equipment, over the Contractor s methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Consultant cannot, and does not, warrant or represent that bids or negotiated prices will not vary from the Owner s project budget 2/17/2017 25 Fidalgo Pool and Fitness Center, WA