North Avenue Rail Station Accessibility Assessment

Similar documents
Arts Center Rail Station Accessibility Assessment

Midtown Rail Station Accessibility Assessment N4

USDOT Pedestrian and Bicycle Safety Assessment Gary, Indiana April 16, 2015

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Downtown Grand Rapids Bicycle Parking Working Group Short Term Implementation Strategies

Duwamish Way-finding and CTR Report

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

North Buckhead Civic Association. Recommendations For Wieuca Road

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

CURBSIDE ACTIVITY DESIGN

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

19th St/Oakland Station Modernization

Niantic Center Elementary School

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Howell Mill Road Safety Audit Report, DRAFT

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Improvements Infrastructure Gap Assessment and Improvements Street Striping

This page intentionally left blank.

10/30/2012 VIA

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

WALKABILITY CHECKLIST How walkable is your community?

Active Transportation Audit

Meadow Woods Elementary School

Tri-State Transportation Campaign Greater Newark Conservancy Newark Complete Streets Walking Audit July 2013

Monument Elementary School Trenton, NJ School Travel Plan

SAFE ROUTES TO SCHOOL

Draft North Industrial Area-Wide Traffic Plan

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability.

NJDOT Complete Streets Checklist

Orange Center Elementary School

CONNECTING PEOPLE TO PLACES

9/21/2016 VIA . RE: The Knot (DR16-270)

5. RUNNINGWAY GUIDELINES

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Existing Transportation System

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Preparing a Curb Ramp Project. December 15, 2010

Chapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Southside Pilot Proposal

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Bicycle and Pedestrian Recommendations for MarketFair Mall

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019

Bicycle + Pedestrian Connectivity Gap Analysis

Complete Streets Funding Program Project Prioritization Plan

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

STREETSCAPE CONCEPT PLAN

Steps to Conducting a Complete Streets Assessment

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Observations and Ideas: Toomer s Corner Streetscape Improvements

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

See Figure 38, Existing Nonmotorized Connections.

SAFE ROUTES TO SCHOOL

Traffic Impact Memorandum. May 22, 2018

5. Automobile Circulation, Wayfinding and Signage

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

interchange audit ABERDEEN Introduction Purpose of the Interchange Audit Interchange Audit Linking cycling with public transport

Forest Hills Improvement Initiative

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

9. TRANSIT ACCOMMODATIONS

Enhancing Downtown

First-Mile, Last-Mile Connections to Transit Workshop Report

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

ADA TRANSITION PLAN FOR ACCESSIBILITY OF PEDESTRIAN FACILITIES WITHIN THE PUBLIC RIGHT-OF-WAYS FRANKLIN COUNTY, FLORIDA

PUBLIC REALM MASTER PLAN

MARTIN LUTHER KING JR. WAY

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

Mission Bay Loop (MBL) Public Meeting

Streetscape: Core Shopping District

CITY OF LANCASTER PROPOSED NEW PROJECTS

Long Island Rail Road Expansion Project Floral Park to Hicksville

Vision. Goals and Objectives. Walking

Grove Hall Business District Parking Analysis

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

City of Davis East Covell Corridor Plan

Portland Peninsula Sidewalk and Ramp Inventory

Streets. The Streets are where Decatur shows its true commitment to create a transportation system that promotes health, safety, mobility and access.

ALTERNATIVES TO BE CONSIDERED

GENERAL. 1. Description

Windy Ridge Elementary School

11/28/2016 VIA

PROJECT SUMMARY ALBERTA STREETSCAPE PROJECT

IMPLEMENTATION WORKBOOK

The Millbrae Station is owned and operated by the Bay Area Rapid Transit District and is served by Caltrain

NORTH LAUDERDALE WALKING AUDIT: VIRTUAL APPENDIX

Pedestrian Road Safety Audit

APPENDIX A Urban Control Zone Corridor Study Reports

James Williams Middle School 915 Acacia Lane

Safe Routes to School Action Plan Aberdeen, Idaho

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Hedgepeth Williams Middle School and Paul Robeson Elementary School Trenton, NJ. School Travel Plan

Transcription:

North Avenue Rail Station Accessibility Assessment Joel Anders, Arnaud Huguet, and Alex Poznanski 30 July 2012

Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 INTRODUCTION... 2 CROSSWALKS AND STRIPING... 3 SIDEWALKS... 22 AMENITIES... 27 STAIRWAYS, ESCALATORS AND ELEVATORS... 30 BUS AREA, KISS RIDE, PARK RIDE AND TAXI... 31 SIGNAGE... 32 0

EXECUTIVE SUMMARY Crosswalks and Striping There is a lack of crosswalks both inside and surrounding the bus loop in order to safely facilitate pedestrian mobility in these areas. Additionally, many of the intersections surrounding the station have faded crosswalk striping, lack ramps and truncated domes, or lack crosswalks all together. Sidewalks On station premises, sidewalks and other floor surfaces are in good condition. Off the premises, there are several patches of sidewalk which are in poor condition and have the potential to impede pedestrian access to the station. Amenities There are three bike racks near the south entrance to the station, able to accommodate approximately six bikes. Benches and trash bins are widely available throughout the station. There are also several bike racks off station premises. It was noted that there is a lack of seating for patrons waiting for GRTA buses near North Avenue station, possible making transfers to and from MARTA. Stairways, Elevators and Escalators Stairways, elevators and escalators inside the station all appear to be in working order; however, it was noted that the areas in front of some of the elevators on the platform were poorly lit. Signage Signage inside the station was found to be confusing or difficult to see, an example being an unlit Elevator sign on the southbound platform which is easily missed from other parts of the platform. It was also noted that there is no way finding signage inside or outside the station directing patrons to popular destinations such as the Fox Theatre. 1

MISSION STATEMENT The purpose of this project is to assess the current conditions of MARTA rail stations and their surroundings. The team will use the assessments to present recommendations of ways to improve pedestrian and bicycle accessibility to rail stations, as well as the overall experience that patrons encounter while using MARTA. INTRODUCTION Field work was performed at North Avenue station July 3 rd, 2012. The weather was hot and sunny. North Avenue station is located at the southern edge of Midtown. The main entrance is on the corner of North Avenue and West Peachtree Street. There is also another entrance on the corner of 3 rd Street and West Peachtree Street. The station is located within close proximity to many attractions, including the Fox Theater, Georgia Tech, AT&T, Bank of America Plaza, and The Varsity. 2

CROSSWALKS AND STRIPING Existing Conditions ON MARTA PROPERTY There are no crosswalks leading from the bus loop island to the adjacent streets (North Ave and Ponce de Leon Ave). Figure 2 shows the south side of the bus loop island which contains a ramp suggesting that pedestrians can cross the bus loop here; however, with no striping or receiving ramp on the other side, an unsafe situation has been created. Figure 1 shows the north side of the bus loop which lacks ramps all together. As seen in Figure 3, the intersection of the North Ave sidewalk and bus south bus loop entrance lacks striping. The pedestrian ramps meant to facilitate crossing safely are too steep, and lack truncated domes. In addition, the pavement is cracked and broken in several areas. Figure 4 shows the intersection between the Ponce de Leon Ave sidewalk and the north bus loop entrance. Although ramps with truncated domes are present, there is no striping on the ground. Figure 1: North side of the bus loop. See #37 indicated on the bus terminal street level plan. 3

Figure 2: South side of the bus loop. See #38 indicated on the bus terminal street level plan. Figure 3: South entrance to the bus loop. See #64 indicated on the Google Earth map. 4

Figure 4: North entrance to the bus loop. See #79 indicated on the Google Earth map. Recommendations Consider installing crosswalks on both the north and south sides of the bus loop in order to allow patrons to safely access buses from street level, without having to go through the station. Paint striping along the sidewalk across the north and south bus loop entrances. Install ADA compliant ramps with truncated domes on the south bus loop entrance crosswalk. Fix the broken pavement at the south entrance to the bus loop. 5

NOT ON MARTA PROPERTY Existing Conditions The table below describes issues encountered concerning crosswalks off MARTA premises: Location Ramps Striping Figure # 3 rd @ Cypress Lack truncated domes Faded Figure 5 3 rd @ Peachtree Lack truncated domes Faded Figure 6 4 th @ Peachtree Good Faded Figure 7 4 th @ Juniper Only ramp present is NW corner, no truncated domes 4 th @ Piedmont NW, NE and SW corners lack ramps to cross Piedmont. All ramps present lack truncated domes. 3 rd @ Piedmont NW, SW and SE corners lack ramps to cross Piedmont. NW and SW corners lack ramps to cross 3 rd. Ramps on NE corner lack truncated domes. Piedmont @ Ponce All corners possess ramps to cross in both directions. Ponce @ Juniper Ponce @ Peachtree NE and NW ramps are misaligned to cross Piedmont Large gap between SW ramp and street SE ramp to cross Piedmont lacks truncated domes NE & NW ramps lack truncated domes Gap between NE ramp and street, x ing Peachtree Striping across 4 th is faded. No striping across Juniper All present striping is faded. No striping going across Piedmont from between NW and NE corners. North and west striping missing. South striping faded. West striping good. All present striping is faded. North side of intersection lacks striping. North and west striping faded North and west striping faded. West striping does not meet NW ramp. Figure 8, Figure 9 Figure 10, Figure 11, Figure 12 Figure 13, Figure 14, Figure 15 Figure 16, Figure 17, Figure 18, Figure 19, Figure 20 Figure 21 Figure 23, Figure 24 6

North @ Spring Northern ramps lack truncated domes. SE ramp to cross North is missing North @ Williams NE corner has no truncated domes NW ramp broken, no truncated domes North @ GDOT headquarters driveway All striping is faded. Figure 25, Figure 26, Figure 27 Northern striping (across Williams Street) not present. Figure 28 No truncated domes Not present Figure 29 *In addition, there is a pedestrian push button missing from the NE corner of the intersection of West Peachtree and Ponce. Figure 5: Intersection of 3 rd Street and Cypress Street, facing NE. See #40 indicated on the Google Earth map. 7

Figure 6: Intersection of 3 rd Street and Peachtree Street facing north. See #41 indicated on the Google Earth map. Figure 7: Intersection of 4 th Street and Peachtree Street facing SE. See #43 indicated on the Google Earth map. 8

Figure 8: Intersection of 4 th Street and Juniper Street facing south. See #45 indicated on the Google Earth map. Figure 9: Intersection of 4 th and Juniper Streets facing SE. See # 46 indicated on the Google Earth map. 9

Figure 10: Intersection of 4 th Street and Piedmont Avenue, facing south. See #47 indicated on the Google Earth map. Figure 11: Intersection of 4 th Street and Piedmont Avenue facing east. See #48 indicated on the Google Earth map. 10

Figure 12: Intersection of 4 th Street and Piedmont, facing north. See #49 indicated on the Google Earth map. Figure 13: Intersection of 3 rd Street and Piedmont Avenue facing south. See #50 indicated on the Google Earth map. 11

Figure 14: Intersection of 3 rd Street and Piedmont Avenue facing west. See #51 indicated on the Google Earth map. Figure 15: Intersection of 3 rd Street and Piedmont Avenue facing NW. See #52 indicated on the Google Earth map. 12

Figure 16: Intersection of Piedmont and Ponce de Leon Avenues, facing west. See #54 indicated on the Google Earth map. Figure 17: Intersection of Piedmont and Ponce de Leon Avenues, facing north. See #55 indicated on the Google Earth map. 13

Figure 18: Intersection of Piedmont and Ponce de Leon Avenues, facing west. See #56 indicated on the Google Earth map. Figure 19: Intersection of Piedmont and Ponce de Leon Avenues, SW corner. The red box indicates a large gap/trench between the base of the ramp and the street. See #57 indicated on the Google Earth map. 14

Figure 20: Intersection of Piedmont and Ponce de Leon Avenues, facing north. See #58 indicated on the Google Earth map. Figure 21: Intersection of Ponce de Leon Avenue and Juniper Street, facing west. See #59 indicated on the Google Earth map. 15

Figure 22: Intersection of Ponce de Leon Avenue and Peachtree Street, facing west. See #60 indicated on the Google Earth map. Figure 23: Intersection of Ponce de Leon Avenue and Peachtree Street, facing north. The red arrow indicates a misalignment between the striping and the ramp. See #61 indicated on the Google Earth map. 16

Figure 24: Intersection of North Avenue and Spring Street, facing west. See #69 indicated on the Google Earth map. Figure 25: Intersection of North Avenue and Spring Street, facing south. See #70 indicated on the Google Earth map. 17

Figure 26: Intersection of North Avenue and Spring Street, facing SE. See #71 indicated on the Google Earth map. Figure 27: Intersection of North Avenue and Williams Street, facing west. See #73 indicated on the Google Earth map. 18

Figure 28: Driveway on North Avenue next to GDOT headquarters, facing east. See #74 indicated on the Google Earth map. 19

Figure 29: Intersection of Ponce de Leon Avenue and West Peachtree Street, NE corner. See #84 indicated on the Google Earth map. Recommendations Coordinate with the City of Atlanta and GDOT to: Ensure that all crosswalk ramps contain truncated domes. Ensure that faded striping is re painted, and that crosswalk striping is painted where it is currently missing. Install crosswalk ramps where they are missing. Ensure that striping and ramps are properly aligned. Ensure that there are no vertical gaps between curb cut ramps and the street. Fix broken pavement. Paint crosswalk striping across Juniper Street @ Fourth Street, and consider installing a HAWK signal in this location to facilitate safe crossing (see Figure 30 for an example). 20

Figure 30: A HAWK signal on Buford Highway near Doraville. Photo credit: www.georgiaroadgeek.com. 21

SIDEWALKS ON MARTA PROPERTY Existing Conditions Sidewalks and other pedestrian areas on station premises are in adequate condition, aside from any issues detailed in the repairs brief. Recommendations None. Existing Conditions NOT ON MARTA PROPERTY Sidewalks on streets near the station vary in condition. West of Peachtree Street, sidewalks are generally in better condition than they are east of Peachtree Street. The following table describes issues relating to sidewalks which are off MARTA premises, but could potentially impede pedestrian access to North Avenue Station: Location Condition Figure 4 th btwn Peachtree and Juniper Broken concrete, large vertical Figure 31 gap East side of Piedmont, south of Sidewalk is obstructed by a Figure 32 3 rd large, unstable metal plate in the ground North side of North Ave, west Large vertical gap in sidewalk Figure 33 of Peachtree W. Peachtree @ North in front Missing hexagonal tiles, creates Figure 34 of All Saints Episcopal tripping hazard Ponce between W. Peachtree Vertical gap in sidewalk Figure 35 and bus loop entrance W. Peachtree @ 3 rd Very large vertical gap in Figure 36 sidewalk W. Peachtree south of 4 th Steep, non ADA compliant ramp Figure 37 22

Figure 31: Broken sidewalk on 4 th Street between Peachtree and Juniper Streets. See #44 on the Google Earth map. Figure 32: Unstable metal plate in ground near the intersection of 3 rd Street and Piedmont Avenue. See #53 indicated on the Google Earth map. 23

Figure 33: Vertical gap in the sidewalk near the intersection of North Avenue and Peachtree Street. See #62 indicated on the Google Earth map. Figure 34: Missing hexagonal sidewalk tiles in front of All Saints Episcopal Church on the corner of North Avenue and West Peachtree Street. See #68 indicated on the Google Earth map. 24

Figure 35: Vertical gap in the sidewalk west of the north entrance to the station bus loop. See #78 indicated on the Google Earth map. Figure 36: A very large vertical gap in the sidewalk directly in front of the entrance to the station at the intersection of West Peachtree and 3 rd Streets. See #85 indicated on the Google Earth map. Figure 37: A steep, non ADA compliant ramp near the intersection of West Peachtree and 4 th Streets. See #86 indicated on the Google Earth map. 25

Recommendations Coordinate with the City of Atlanta in order to: Fix broken sidewalks near the station. Reduce large vertical gaps in the sidewalk to mitigate tripping hazards. Cover up the unstable metal plate seen in Figure 32. *Fixing the large vertical gap in the sidewalk shown in Figure 36 should be made a top priority, as it is right outside the entrance to the station, and poses a significant tripping hazard. 26

AMENITIES ON MARTA PROPERTY Existing Conditions On MARTA premises, amenities are in adequate condition. Three in ground U style bike racks were found, located west of the main entrance to the station (see Figure 38). Figure 38: Three bike racks located at North Avenue station. See #66 indicated on the street level plan. Recommendations None. 27

NOT ON MARTA PROPERTY Existing Conditions Two bike racks were noted off MARTA premises, but within close proximity to the station (see Figure 39 and Figure 40). On the corner of Ponce de Leon Avenue and West Peachtree Street, there is a GRTA bus stop which was found to have many people waiting, but no benches (see Figure 41). Figure 39: An in ground U style bike rack near the corner of Peachtree and 3 rd Streets. See #42 indicated on the Google Earth map. Figure 40: An in ground U style bike rack on North Avenue in front of The Varsity. See #72 indicated on the Google earth map. 28

Figure 41: People waiting for a GRTA bus on West Peachtree Street. See #77 indicated on the Google Earth map. Recommendations Consider coordinating with GRTA and the City of Atlanta to install some benches for people waiting for express buses in this area. This will make it more convenient for commuters making connections between MARTA and GRTA. 29

STAIRWAYS, ESCALATORS AND ELEVATORS Existing Conditions ON MARTA PROPERTY Stairways, escalators and elevators on MARTA premises are generally in good condition. It was noted in the repairs brief that the elevator area at the north end of the northbound platform is poorly lit. Recommendations Ensure that all areas of North Avenue station are properly lit. NOT ON MARTA PROPERTY Existing Conditions Nothing noted. Recommendations None. 30

BUS AREA, KISS RIDE, PARK RIDE AND TAXI Existing Conditions ON MARTA PROPERTY North Avenue station does not have a park ride, kiss ride or taxi area. The bus area is easily accessible from inside the station, but difficult to access from the surrounding streets due to a lack of crosswalks going into the bus loop (see the Crosswalks and Striping section for details) Recommendations See Crosswalks and Striping for recommendations concerning the bus area. 31

SIGNAGE ON MARTA PROPERTY Existing Conditions See the repairs brief for details on signs inside the station which give incorrect information or are blank all together. As shown in Figure 42, the Elevator sign at the south end of the south bound platform is unlit and generally difficult to see. Figure 42: Signage at the south end of the south bound platform. See #8 indicated on platform level plan (2). Recommendations Ensure that the signs in the repairs brief which currently are giving misinformation are corrected. Replace the burnt out light bulbs in the unlit Elevator sign. Consider placing a sign towards the middle of the platform indicating where the elevator is. 32

NOT ON MARTA PROPERTY Existing Conditions There is a general lack of signage directing patrons to and from North Avenue station with respect to local attractions. o Signs inside the station instruct patrons to use the northern exit to access the Fox Theatre; however, there are no signs giving further instructions on how to actually get to the Fox. Recommendations Consider coordinating with the Fox Theatre to install way finding signage between the northern MARTA station entrance and the theater. This could be accomplished using signs painted on the sidewalk, or signs along the side of the street that are at pedestrian eye level. Alternately, consider installing a sign at the northern station concourse with walking directions to the Fox Theatre. 33