Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal,

Bitumen Delivery Driver Inductions Eurobitume UK

B S Glass Ltd Safety procedures- outsourced Workplaces

Safety and Infrastructure

In this letter you will find your show build-up instructions and some other reminders. Also enclosed in this pack are:

Engine Shed & Lincoln Performing Arts Centre University of Lincoln Lincoln LN6 7TS

Method Statement Author

Visitor information pack

higher education exhibition 2018 Wednesday 13 June 09:30 14:30

Visitor information pack

South London higher education exhibition Exhibitor manual. Goldsmiths, University of London New Cross London SE14 6NW

Visitor information pack

Dorset higher education exhibition Exhibitor manual. Bournemouth University Fern Barrow Poole BH12 5BB. Wednesday 28 March :30 15:00

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Contractor/Visitor Safety Orientation UNBC

Visitor information pack

Exhibitor manual. University of Essex higher education exhibition Wednesday 20 June 09:30 14:30 Thursday 21 June 09:30 13:00

CONFERENCE16. UCISA16 Exhibitor Handbook. Wednesday 16 to Friday 18 March 2016 Manchester Central

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

Birmingham higher education exhibition Exhibitor manual. NEC Birmingham B40 1NT. Monday 25 June 09:30 15:00 Tuesday 26 June 09:30 15:00

NAPFM The Emergency Fleet Exhibition

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

HEALTH & SAFETY HANDBOOK. Venues/HSE/08/16

Visitor information pack

SAFETY INDUCTION. Intro

Visitor information pack

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

Visitor information pack

Visitor information pack

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

Contractor / Exhibitor Handbook

Contractor handbook. Purpose

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

KIERNAN ELECTRICAL SITE INDUCTION. Site Supervisors: Chris Lettice

Cornwall higher education exhibition Exhibitor manual. Penryn Campus, Treliever Road Penryn, Cornwall, TR10 9FE. Tuesday 1st May 09:30 15:30

A guide for contractors working on site

COREWEST DIAMOND DRILLING LTD. * ENVIROMENT, HEALTH AND SAFETY PROGRAM* APPENDIX A GENERAL WORKSAFE PRACTICES

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

Working safely in an engineering environment

Exhibitor manual. West Wales higher education exhibition University of Wales Trinity Saint David Carmarthen Campus Carmarthen SA31 3EP

Unit Title: Health and Safety in a Construction Environment

SEMBIT SQA Unit Code F9JC 04 Complying with statutory regulations and organisational safety requirements

Understanding Statutory Regulations and Organisational Safety Requirements within a Medical Engineering Environment

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

Health, Safety and Environment Induction. Section 1: Introduction. Section 1: Introduction. Aims & Objectives of the induction MGJV

WHS CONTRACTOR INFORMATION PACKAGE

Exhibitor manual. Lincolnshire higher education exhibition Engine Shed and Lincoln Performing Arts Centre University of Lincoln

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Company Policy Health & safety for work performed at Customer premises

COGPOLY39 Meet safety, health and environmental requirements in the workplace

Bogo Operations Pollution Incident Response Management Plan

Potential risk of injury to staff

Safety Guidelines. National health and safety guidelines as well as worker safety act shall be considered

SEMMPF201 Complying with Statutory Regulations and Organisational Safety Requirements

Harbour Town Gold Coast Site Induction

Extreme Adventure Ltd 1.10 Safe Work Method Statement

SAFE WORK METHOD STATEMENT SWMS No Version

Code of Practice and Instructions to Contractors Working for Viridor

Company Health and Safety Policy

SOPAN O & M COMPANY PVT. LTD.

Safety Risk Assessment Driving Grey Fleet Vehicles

APPENDIX A: Risk Assessment for all activities at Farm

WORK HEALTH AND SAFETY

Monash University Academy of Performing Arts Safety Induction

Visitor information pack

Exhibitor Information Pack CONTENTS

Waste Industry Safety & Health

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Safety Guidelines. National health and safety guidelines as well as worker safety act shall be considered

McCain Foods (Aust) CONTRACTOR INDUCTION PROGRAM PENOLA SITE QUICK GUIDE

SAFE WORK METHOD STATEMENT

Safe Work Method Statement

Airside Safety Airside Operational Instruction 07

Work Health & Safety Event Safety Checklist Small Event

DCHS Health and Safety Handbook

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

SAFETY INDUCTION. Intro

2.0 Management Systems and Documentation

Exhibitor manual. Cambridge higher education exhibition Wednesday 20 June :30 14:30

Brunel University London Indoor Athletics Centre (IAC) Kingston Lane Uxbridge, UB8 3PH

COMPANY HEALTH & SAFETY POLICY

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Contractor Code of Conduct

BASIC HEALTH AND SAFETY MEASURES TO BE TAKEN INTO CONSIDERATION FOR STAND CONSTRUCTION AT MOBILE WORLD CONGRESS rev01

Contractor OHS Induction. AOHS-05-GUI September 2016

Minimum Safety Requirements for Contractors Working on Railway Property

Safety, Health & Environment Contractor Induction. IT Contractor

CONTRACTOR SAFETY RULES

A MESSAGE FROM THE MD

Quality, Safety, Health and Environment (QSHE) Cleaners Induction Handbook

Health & Safety Contractor rules

Emergency Response Plans

ECHO Walking Festival 2018 Health and Safety Plan

Singapore Turf Club s In-House Rules and Regulations (for the Contactor)

Transcription:

Site Induction Document & Site Rules Event Name Diabetes Professional Conference 2018 Venue Build & Breakdown Times Prepared By Excel London, Halls S19 S23 Build; Mon 12 th March: 09:00 22:00 (space only sites) Tues 13 th March: 08:00 22:00 (space only sites) 15:00 22:00 (shell scheme sites) **Please note full CDM regulations will be in place throughout build** Breakdown; Fri 16 th March: 14:00 15:00 (shell scheme sites only) 15:00 22:00 (space only access) Ryan Daly, Operations Manager, Exhibition Services Ltd. Date 12/01/2018 **PLEASE READ & COMPLETE THIS DOCUMENT PRIOR TO ARRIVING ON SITE**

General Site Information Access into Halls & Wristbands Whilst CDM regulations are enforced Wristbands must be worn to gain entry to the hall. Wristbands will be available to all who have read and signed this document. If you have not returned the correct documentation prior to arrival on site then you will have to complete the site induction before gaining access to the hall. Accident reporting Please report all accidents & near misses to the Event Organising team, the Event H&S manager will then be able to ensure correct procedures are followed. Welfare Arrangements There are various catering outlets located on the main concourse of Excel that will be open during the build-up and breakdown of the Conference. Drinking water is available at the many water fountains located at the venue. Other catering outlets are available in the surrounding area. Toilets Both male and female toilets are available throughout the venue. Smoking & E- Cigarettes Excel is a non-smoking venue; Designated smoking areas can be found outside the venue. Organisers Office The organisers office will be in room 11 which is located on the first floor. Personal Protective Equipment (PPE) High visibility clothing and safe sensible footwear must be worn at all times whilst in the loading bay or halls during the build-up and breakdown of the conference. All personnel must adhere to any safety signage displayed at London Excel. Please note, PPE is available to purchase on site on level 0 by the Business Service Centre. The event organisers do not provide PPE. Waste

All waste materials produced from build-up and breakdown must be removed from site. Anyone leaving waste materials at the venue will be charged for its removal. This includes carpets, graphics, vinyl s etc. Traffic Drivers must follow the instructions of the venues traffic marshals at all times when they are driving in the lorry ways or exhibition hall. Drivers must adhere to all signage within the lorry ways or exhibition hall. Drivers must give way to pedestrians within the exhibition hall. Pedestrians must use the protected walkways at all times within the lorry way. Pedestrians must give way to vehicles within the lorry way. The speed limit within the exhibition hall is 5mph. High vis vests must be worn at all times in the lorry way. Emergency Procedures If an evacuation is necessary you will hear the following announcement broadcast over the Public address system, use the nearest available Emergency Exit route to the appropriate Assembly point. "ATTENTION PLEASE. ATTENTION PLEASE. HERE IS AN IMPORTANT ANNOUNCEMENT. IT IS NECESSARY TO ASK EVERYONE TO LEAVE THE BUILDING. PLEASE MAKE YOUR WAY CALMLY TO THE NEAREST EXIT. DO NOT RETURN TO YOUR VEHICLES. EVERYONE WILL BE READMITTED AS SOON AS POSSIBLE". ASSEMBLY AREAS Assembly areas are marked on the plan at the end of this document. On hearing any announcements asking for the hall to be evacuated, ALL personnel should leave the halls quickly and head to the nearest Assembly Area, leaving any equipment behind and await further instruction. Fire Safety Fire Exits are clearly signed around the venue. Please ensure you familiarise yourself with the nearest exit to your stand. Any fire exit with a lit sign above it will be open. All Emergency Gangways must be kept clear of tools, equipment, materials and be accessible at all times. On discovering a fire Break the glass on the nearest Manual Call Point (coloured red), which are located adjacent to all exits, or contact the Security Suite by dialling 4444 on an internal telephone or 020 7069 4444 immediately.

Leave all of your belongings and make your way to the nearest exit. First Aid The First Aid Room is located on Level 0. In the event of a medical emergency please dial 5556 from a venue phone or dial 0207 069 4444 on any phone. If possible please give the following information; The location The problem Is the patient conscious? Is the patient breathing? Their approximate age Do they have chest pains? Are they bleeding?

SITE RULES Whilst working at the Diabetes UK Professional Conference 2018, it is important that you are aware of the safety rules, procedures and arrangements that are in place for your safety and that of your colleagues. All of your employees and contractors are required to read these Site Rules prior to working at The Diabetes UK Professional Conference 2018 the following apply to all staff, organisers, contractors and exhibitors: Must Comply with Venue Traffic Rules and follow the instruction of venue traffic marshals at all times Any Vehicle access into the halls has to be approved by the Venue/Organisers of the event in advance Any vehicle or plant driven within the hall must adhere to the 5MPH speed limit and operate with hazards/lights turned on. Drivers must give way to pedestrians within the event hall and pedestrians must give way to vehicles within the loading bay No persons are permitted to operate plant or machinery (including fork lift trucks) unless they have received adequate training Appropriate management and safe methods of working at height is required at all times in any areas where working at height is being carried out, the immediate area must be controlled and hard hats worn if appropriate Ladder work must only be conducted for short work periods - you must NOT stand on the top tier of your ladders -any unsafe ladder work may result in the employee being ejected from the venue. Ladders MUST be off an industrial type No hazardous or toxic substances are to be used in the hall which have not been pre-agreed by the venue and event organiser Contractor wristbands must be worn at all times during build and breakdown Any person suspected to be under the influence of drugs or alcohol will be ejected from the venue Hi Vis Jackets must be worn at all times when working in the venue s loading bays & exhibition halls. Appropriate footwear should be worn whilst working in the venue flip-flops, open-toed sandals, etc. are NOT acceptable No hot works can take place in the venue without a Hot Works Permit being issued All contractor accidents, incidents & near misses must be reported immediately to the organiser and venue staff Work Tidy - during build and breakdown, you must ensure aisles are kept clear at all times and there is no undue obstruction to fire evacuation routes. All waste is to be disposed of in an appropriate manner & is The Exhibitor/Contractors responsibility. THE ABOVE RULES MUST BE ADHERED TO IN ADDITION TO THE RULES SET OUT IN THE AEV E-GUIDE. www.aev.org.uk/e-guide

SITE INDUCTION DECLARATION CDM (Construction, Design, Management) 2015 Regulations have now been enforced in the exhibition and events sector (with effect from the 6th April 2015). A requirement of CDM is that in order to gain access to the site during build up and breakdown periods, all persons must have completed a Site Induction prior to their arrival. To comply with this requirement, you should read the Site Induction PowerPoint presentation and distribute this to all persons who will be attending site during these periods. Please complete the form below as confirmation that you have read the Site Induction PowerPoint presentation and understand your requirements under the new regulations. TO BE COMPLETED BY ALL EXHIBITIORS & CONTRACTORS 1. Exhibitor: We have received a copy of the Site Induction presentation and confirm that all company representatives who will be working on-site during the build-up and breakdown periods will read this information prior to their arrival on-site 2. Stand Contractor: We have received a copy of the Site Induction presentation and confirm that all contractors, sub-contractors and workers who will be working on-site during the build-up and breakdown periods will read this information prior to their arrival onsite Company Name: Stand Number: On-site Contact Name: Contact Telephone No: Our out of hours number is: Please return to: Mike Atkinson, MGA Safety LtdTel: 07931 75154 Email: mike@mgasafety.com