ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

Similar documents
Taylor Road Resurfacing Project

Cincinnati Dayton Rd Widening

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Highway Construction

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Hospital Link Project Project Update September 2017

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

FDOT Treasure Coast Traffic Report

Chapter 4: Funding and Implementation

Legislative Update Williamsburg Residency

Design Criteria. Design Criteria

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

FDOT Treasure Coast Traffic Report

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

CTH M HIGHWAY PROJECT CTH Q to STH 113

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Hospital Link Project Project Update November 2017

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

FDOT Treasure Coast Traffic Impact Report

APPENDIX L: COST ESTIMATING TOOLS

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Duwamish Way-finding and CTR Report

2017 Temporary traffic control guidelines for pedestrians. v.2

SC 41/Joe Rouse Intersection Improvements

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Lake Waterford Community Association Meeting. November 15, 2016

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

District Construction Projects

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

Culpeper District. Albemarle County Monthly Report October, 2011

2018 ROAD MAINTENANCE PROGRAM

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Bluffdale/ UDOT South High-T Intersection Project Type Operations

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

FDOT Treasure Coast Traffic Impact Report

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

PUBLIC INFORMATION MEETING

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Charlottesville Regional Chamber of Commerce. October 28, 2014

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Mandan Commission Meeting August 2, 2016 Mandan City Hall

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

Rio Intersection Traffic Restrictions Begin Monday

DISTRICT CONSTRUCTION PROGRAM

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

Henderson Ave. Complete Streets Project

3.0 PROJECT DESCRIPTION

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

MUTCD Part 6: Temporary Traffic Control

IL Route 71 Construction Update

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

News Release Eastern Oregon Region 5

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

AUTHORIZE BID ADVERTISEMENT

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Project Application. Project Location: Salem Drive (Federal Route 1101)

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

MIAMI & ERIE CANAL SHARED USE TRAIL

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Derby Street. Project Updates. Salem, Massachusetts

Improvements within the Route 107 study area were developed in accordance with the MassDOT Project Development and Design Guide of 2006.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Pavement Rehabilitation & Buffered Bike Lane

2040 Long Range Plan Projects Draft October 2011

New Mexico Transportation Funding Challenges

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments

Paul Vraney Bureau of Project Development 02/11/2016

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Downtown Redevelopment Project Update

Paving for Progress Municipal Streets Seminar

CY2017 Summary of STP applications

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

Journey to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM

CITY OF SPOKANE VALLEY Request for Council Action

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Transcription:

1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening of 4 structures (over SR82 and Railroad). Project limits are from north of SR8 to just south of the Cuyahoga County line. Anticipated project schedule as follows: -Project Sale May 2014 -Project Award May 2014 -Begin Construction June 2014 -End Construction October 2016 ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. Consent legislation passed by City as Ordinance 66-2013 on May 23, 2013. Project awarded to design-build team of Great Lakes Construction and URS. Currently under construction and on schedule for October 2016 completion. 2. I 271 NORTH RAMP RELOCATION - PID 97084 Project consists of the realignment and relocation of SUM IR271 northbound ramp from SR82 to South Freeway Drive. The City agreed to participate in the cost of Right-of-Way at a maximum amount of $500,000. Additional cost of right-of-way acquisition is being absorbed by ODOT. Total cost of engineering design and right-of-way acquisition is approximately $1,617,000. Construction cost of the ramp is included in project PID 89458. Participatory legislation passed by City as Ordinance 123-2013 on December 12, 2013. Anticipated project schedule as follows: -Project Sale May 2014 -Project Award May 2014 -Begin Construction June 2014 -End Construction October 2015 -Ramp scheduled for opening to traffic in September 2015. Project awarded to design-build team of Great Lakes Construction and URS. Currently under design/construction and on schedule for interim completion date of September 30, 2015.

3. SR 82 - RESURFACING - PID 84563 (Phase I) Resurfacing of SR82 from west corp line to I271 by ODOT. Participatory legislation passed as Ordinance 76-2011 on January 26, 2012. Project anticipated for construction in 2015. Total construction cost of project within Macedonia estimated to be $500,000. City share of cost is approximately $100,000. The contract was awarded to Shelly Company. Construction on schedule for Summer 2015. Work to begin in Macedonia on or about June 27, 2015. The section between Old 8 (SLM 2.69) and Summer Rd (SLM 3.93) will be limited to night paving (9pm to 6am). Project completion in same year. Completion scheduled for October 2015.

4. SR 82 WIDENING AND RESURFACING - PID 81656 (Phase III) This project begins at a point on SR 82 (East Aurora Road) approximately 200 west of the intersection of Alexandria Drive and extends easterly to the Corporation Line with The City of Twinsburg. Work limits are approximately 1.3 miles in length. The existing facility contains two lanes of pavement plus a bike lane on each side. The proposed pavement will contain two lanes of pavement, a two-way left turn lane, and bike lanes from Alexandria Drive to Shepard Road. The Shepard Road intersection will be reconfigured, maintaining existing number of lanes. The pavement tapers to a two lane section east of this intersection. From the end of the taper to the easterly end of work, the pavement will be resurfaced. Right of Way acquisition cost is approximately $443,000. ODOT accepted bids for construction on January 15, 2015. follows : Four bids were received as 1. Karvo Paving - $4,577,016.05 2. Shelly & Sands INC - $4,789,018.82 3. Fabrizi Trucking & Paving CO INC - $5,199,880.00 4. S E T INC - $5,299,445.39 State Estimate - $3,977,000.00 Construction Start Spring 2015 Construction Completion Fall 2016 Utility relocations to clear the right of way are nearing completion. Project construction will commence after the right of way is cleared.

5. 2015 ROAD PROGRAM The Work embraced by this contract generally consists of the following: I. Pavement repair, single-pass recycling, resurfacing, pavement planing (to tie down at intersections only), drive butt joints, and shoulder paving of the following streets: 1. Airlane Drive - Ledge to Skyland 2. Barkdale Lane Bonnie to Laurel 3. Blueberry Lane Bonnie to Laurel 4. Bonnie Road Blueberry to Brookdale 5. Bradford Drive Blueberry to Brookdale II. Pavement planing entire surface area, base pavement repair, single-pass recycling, resurfacing, ADA curb ramps, and contingency replacement of concrete curb and gutter: 1. Westwood Drive Park Ledge to Longwood III. Pavement planing, resurfacing and restriping: 1. East Highland Road East of SR 8 to South Bedford This project was awarded to Specialized Construction and is currently under construction. The completion date for this contract is on or before July 4, 2015. 6. 2015 PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM Bid documents are being prepared for the 2015 pavement preventative maintenance program. This project will consist of crack sealing various streets within the City based upon the results of the pavement condition rating report completed this year. The project budget is $50,000. As many streets will be sealed as the budget allows. 7. LEDGE ROAD BRIDGE Ledge Road bridge is scheduled to be repaired by Norfolk Southern this summer. Work is scheduled to commence no later than Monday, July 27th, 2015. The road will be closed during the duration of the repairs to the bridge. A detour plan will be utilized to direct traffic. The proposed detour route utilizes North Bedford Road, East Aurora Road and South Freeway Drive. The maximum duration for the closure is 75 days. All work by the railroad is to be completed within this timeframe. The City is planning on repairing the asphalt pavement under the bridge while the road is closed and prior to removal of the detour.