11TH & VERMONT SPRC MEETING 4 1/25/ th & North Vermont. Ballston, VA R2L:ARCHITECTS 1 PROJECT TEAM

Similar documents
DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee

TECHNICAL MEMORANDUM. Introduction

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Meadow Woods Elementary School

PenPlace SPRC #6. September 27, DRAFT

Healthy Built Environments Cowlitz-Wahkiakum County, Washington

STREETSCAPE CONCEPTS

Old Dominion Drive (Route 309) Pedestrian Safety Project Phase II. North Glebe Road to 38 th Street N

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

N. Frederick Street to N. Manchester Street

RE: Natomas Landing (P99-091)

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

SEVERN AVENUE CORRIDOR STUDY Bicycle, Pedestrian, & Landscape Improvements

ACTION TRANSMITTAL No

TRANSPORTATION STANDARDS

MARTIN LUTHER KING JR. WAY

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

McLean Main Street Public Forum Follow-up

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

MEDIAN DESIGN example median A

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

STREETSCAPE CONCEPT PLAN

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Chapter BICYCLE PARKING REQUIREMENTS

Orange Center Elementary School

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Neil Street Plaza Placemaking Plan

Virginia Hospital Center Expansion

Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, :30-8:30pm

ARLINGTON COUNTY, VIRGINIA

5 CIRCULATION AND STREET DESIGN

5. Automobile Circulation, Wayfinding and Signage

Paul VI Redevelopment. Traffic Impact Study

Traffic Signal Phasing Study Summary & Staff Recommendations

F L E T C H E R A V E N U E

Vehicular turning and path of travel with a proposed curb bulb on the southwest corner of Mount Diablo Boulevard and Dewing Avenue.

Option W: N. Washington Street Project

Victoria Park Master Plan

Copyright by Home by School.com (Third Conversion, LLC). All rights reserved. Published by Third Conversion, LLC

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Hidden Oaks Elementary School

Windy Ridge Elementary School

Bicycle and Pedestrian Access in Transit Oriented Developments. Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009

Existing Transportation System

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction

/ ARLINGTON COUNTY, VIRGINIA

City of Walnut Creek TELEGRAPH AVENUE BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION

Observations and Ideas: Toomer s Corner Streetscape Improvements

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY. Final Report January 2006

DOWNTOWN TENINO. Goal: Get more People in Downtown. A Pamphlet of Concepts for

Guthriesville Village Manual of Written & Graphic Design Guidelines

Roosevelt Estates Neighborhood Improvements

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Rehabilitation Institute of Chicago s New Research Hospital

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

6.4 RECOMMENDED IMPROVEMENTS

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

Healthy Corridor Audit Tool

SPRINGFIELD REVITALIZATION REPORT

MEMORANDUM INTRODUCTION DESCRIPTION OF PROPOSED REDEVELOPMENT. District of Columbia Zoning Commission. Jami L. Milanovich, P.E.

Appendix B - Street Sections

Shared Court Housing Concept Summary

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

McLEAN CITIZENS ASSOCIATION

6:00 pm - Open Meeting

Niantic Center Elementary School

Joe Routt Boulevard. Access Design Options

City of Davis East Covell Corridor Plan

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

studio 646 ARCHITECTURE, LLC

About the Wilmington Downtown Circulation Study

Fulton Market Streetscape

Streetscape: Core Shopping District

See Figure 38, Existing Nonmotorized Connections.

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Chapter 3.5 Osteen Elementary School. Volusia County MPO. November 2008

CITY OF LANCASTER PROPOSED NEW PROJECTS

Table #6 VISION CHARACTERISTICS

SITE DEVELOPMENT PLAN FOR PLANTATION LANDING TOWNHOMES WILMINGTON, NORTH CAROLINA

FOR SALE SOMI LAND DOWNTOWN SOUTH MIAMI MIXED-USE DEVELOPMENT SITE EXCLUSIVELY PRESENTED BY:

PROJECT KEY TYPICAL SECTION 1 =60

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Docket No. 16ZONE1044 (Julia Williams, DPDS Case Manager)

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

STAKEHOLDER MEETING STANFORD RANCH ROAD/GALLERIA BOULEVARD/SR 65 NORTHBOUND RAMPS PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT (PA&ED) PHASE

NJDOT Complete Streets Checklist

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Arts Center Rail Station Accessibility Assessment

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Henderson Ave. Complete Streets Project

Trip Generation for an averaged sized elementary school in Provo, Utah

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

SITE AND BUILDING INFORMATION

Traffic Impact Memorandum. May 22, 2018

Transcription:

PROJECT TEAM DEVELOPER/OWNER NVR Inc. 11700 Plaza America Drive Suite 500 Reston, VA. 20190 T: 703-956-4775 Contact: John Halak Jay Johnson ATTORNEY Mcguire Woods, LLP 1750 Tysons Boulevard 18th Floor Tysons Corner, VA. 22102 T: 703-712-5000 Contact: Tad Lunger ARCHITECT R2L Architects 3222 N Street NW Suite 500 Washington, DC. 20007 T: 202-600-7230 Contact: Lee Rubenstein CIVIL ENGINEER VIKA Virginia, LLC 8180 Greensboro Drive Suite 200 McLean, VA. 22102 T: 703-442-7800 Contact: Jeff Kreps LANDSCAPE ARCHITECT VIKA Virginia, LLC 8180 Greensboro Drive Suite 200 McLean, VA. 22102 T: 703-442-7800 Contact: Jeff Kreps 11TH & VERMONT SPRC MEETING 4 1/25/2018 11th & North Vermont 1

Additional Information Requested At SPRC 3: 1 - Architectural Design Coordination of East and West facades on South Block Multifamily Building 2- Perspective View of North Utah and Northeast Corner of South Parcel 3 - Architectural Design of Townhouse facing North Vermont on North Parcel 4- Perspective View facing into North Parcel Court 5- Open space at the end of North Utah 6- Shadow studies of existing and proposed conditions 7 - Pedestrian Circulation 11th & North Vermont 2

VEHICULAR ENTRY 11TH STREET VEHICULAR ENTRY BIKE ENTRY LOADING ENTRY GARAGE ENTRY RESIDENTIAL ENTRY NORTH UTAH STREET 11th & North Vermont - Site Plan 1 =50 3

Item 1 1 - Architectural Design Coordination of East and West facades on South Block Multifamily Building 11th & North Vermont 4

7 6 6 6 5 11th Street 3 4 Internal Drive Servicing Parking Entry and Loading/Trash 4 Curb Cut along North Vermont Drive PREVIOUS 7 6 6 6 5 11th Street 3 4 Internal Drive Servicing Parking Entry and Loading/Trash 4 Curb Cut along North Vermont Drive CURRENT 11th & North Vermont - Residential Building: West Elevation 5

4 6 7 Screened/Enclosed Parking Garage Entry 6 Internal Drive Servicing Parking Entry and Loading/ Trash- View towards North Vermont Exit 5 4 3 11th Street PREVIOUS 4 6 7 Screened/Enclosed Parking Garage Entry 6 Internal Drive Servicing Parking Entry and Loading/ Trash- View towards North Vermont Exit 5 4 3 11th Street CURRENT 11th & North Vermont- Residential Building: East Elevation 6

Item 2 2- Perspective View of North Utah and Northeast Corner of South Parcel 11th & North Vermont 7

11th & North Vermont- Residential Building: East Perspective at Intersection of North Utah and 11th Street 8

Item 3 3 - Architectural Design of Townhouse facing North Vermont on North Parcel 11th & North Vermont 9

11th & North Vermont - North Parcel : Court Perspective 10

11th & North Vermont - North Parcel : West Elevation 11

Item 4 4- Perspective View facing into North Parcel Court 11th & North Vermont 12

11th & North Vermont - North Parcel : Court Perspective 13

Item 5 5- Open space at the end of North Utah 11th & North Vermont 14

UTAH STREET NEW BIKE RACK LOCATION 11th STREET PROPOSED PLANTING BETWEEN ADA RAMPS SHADE TREE SCULPTURAL SEATING PROPOSED TOWNHOMES ±3 TALL SHRUBS VIEW SOUTH FROM 11TH STREET DOWN NORTH UTAH STREET AERIAL OF PROPOSED OPEN SPACE AT THE END OF NORTH UTAH STREET 11th & North Vermont- Utah Street Open Space 15

Item 6 6- Shadow studies of existing and proposed conditions 11th & North Vermont 16

EXISTING CONDITION 12:00 PM 9:00 am 12:00 pm N 4:44 AM June 21 E 7:35 PM W S 3:00 pm 6:00 pm 11th & North Vermont - Shadow Study - June 21 17

PROPOSED CONDITION 12:00 PM June 21 N 4:44 AM E 9:00 am 12:00 pm 7:35 PM W S 3:00 pm 6:00 pm 11th & North Vermont - Shadow Study - June 21 18

EXISTING CONDITION 9:00 am 12:00 pm N 12:00 PM 6:11 AM E March 21 6:19 PM 3:00 pm W S 11th & North Vermont - Shadow Study - March / September 21 19

PROPOSED CONDITION 9:00 am 12:00 pm N 12:00 PM 6:11 AM E March 21 6:19 PM 3:00 pm W S 11th & North Vermont - Shadow Study - March / September 21 20

EXISTING CONDITION 9:00 am 12:00 pm N E 12:00 PM 7:24 AM December 21 3:00 pm W 4:47 PM S 11th & North Vermont - Shadow Study - December 21 21

PROPOSED CONDITION 9:00 am 12:00 pm N E 12:00 PM 7:24 AM December 21 3:00 pm W 4:47 PM S 11th & North Vermont - Shadow Study - December 21 22

Item 7 7 - Pedestrian Circulation 11th & North Vermont 23

TO WASHINGTON BLVD TO WASHINGTON BLVD TO N GLEBE ROAD TO FAIRFAX DRIVE PEDESTRIAN TRAFFIC ON PUBLIC RIGHT-OF-WAY TO FAIRFAX DRIVE PRIVATE PEDESTRIAN ACCESS TO RIGHT-OF-WAY DESIGNATED DROPOFF/DELIVERY/ CARPOOL BAY 11th & North Vermont - Pedestrian Map 24