CHANGE RECORDS TABLE OF CONTENTS

Similar documents
Thermal Profiling the Reflow Process

D-PAK Voiding: A Study to Determine the Origins of D-PAK Voiding

3M Thermally Conductive Epoxy Adhesive TC-2810

DRS25 PROCESS DEVELOPMENT GUIDE.

5mm Infrared LED EAILP05RDDB1

Impact of Process Control in Pb-Free to SnPb Reballing Techniques

BME280 Combined humidity and pressure sensor

Vacuum Bagging Wings Instruction Manual Purdue University

Time Pressure Dispensing

Report on OSU Opto-Pack Prototypes

FPG8601 Force Balanced Piston Gauge

Assembly and measurements of a mechanical prototype of the BIS MDT chamber

Gluing Guide QCS Oval & Quick Cuff

KERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS

STANDARD OPERATING PROCEDURE ADVANCED INTRAVENOUS TRAINING ARM (S )

18. Tailplane torque-tube

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

Sensor for Air Bubble Detection at Liquid Filled Tubes. SONOCHECK Type ABD06.xx. Operating Manual

FlexAct BT (Bag Tester) Validation November, 2015

Implementing High Temperature Coplanarity Requirements for Components and PWBs. Proposed 1

Biconic Connectors and Accessories

The Science Behind Conveyor Oven Thermal Profiling

PRESENTS. Solder & Oven Profiles Critical Process Variables

Samurai Armor Set: Step by Step

ThunderClad 3. TU-933 Super Low Loss Material. Laminates & Prepregs Mass Lamination Service Insulated Metal Substrate Materials

A New Way to Handle Changing Fluid Viscosity and the Full-to-empty Effect

TEK-THERMAL 1700B. Thermal Mass Flowmeter. FLOW. Technology Solutions

MS52XX-C&T SMD Pressure Sensor

Connecting a SSL/PTV Backflush System

Product Specification Spring Finger

Integral type Differential pressure flowmeter VNT Series

Agilent Wedge for Probing High-Pitch ICs A Hands-Free Solution for Probing Fine-Pitch ICs

Reflow Oven HHL3000 INSTRUCTION MANUAL POHUA - jedyny autoryzowany przedstawiciel w Polsce

INSTRUCTION GUIDE S-WORKS ROAD CARBON CRANKSET (Carbon and Alloy OSBB cups)

Conductive Materials in Electronics Packaging. Radesh Jewram The Bergquist Company Chanhassen, MN

Experimental Verification of Integrated Pressure Suppression Systems in Fusion Reactors at In-Vessel Loss-of -Coolant Events

Quick Reference Guide

14. Ai le ron quick-connect system

PolySwitch Radial-leaded Resettable Devices

Paint Brush Handle. Julia Carlson Heather Curtin Julia Hamlin. Western Washington University. March 12, 2003

Memorandum Background: Results and Discussion:

WACKER Thermally Conductive Silicone Adhesives & Potting Compounds

PERME- OX2/230 Oxygen Transmission Rate test system

JEDEC STANDARD. Temperature Cycling. JESD22-A104C (Revision of JESD22-A104-B) JEDEC SOLID STATE TECHNOLOGY ASSOCIATION MAY 2005

Introductory Lab: Vacuum Methods

Product Information. Gripper for small components MPC

ANNEXURE TO THE LEVEL 1 INSTRUCTION MANUAL

Example 4 - Airbag. Summary

Selection of Materials and Processes for Space Use. Ruben Edeson, Mechanical Engineer, SSTD.

Pneumatic spool valve islands

NOVALYNX CORPORATION MODEL RAIN GAUGE CALIBRATOR INSTRUCTION MANUAL

Automated Determination of Dissolved Gases in Water Anne Jurek. Abstract: Discussion:

5mm Infrared LED,T-1 HIR323C

SOLAR ENERGY. solutions. adhesives, sealants, and Potting encapsulants For solar energy applications

TI 176B Flow Rate Audit Calculations

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

130400A 1/2 NPT Female A 3/4 NPT Female A 1 NPT Female A 1 1/4 NPT Female A 1 1/2 NPT Female A 2 NPT Female

REGULATIONS FOR THE LICENSING OF MATS

MIXER - GRANULATOR - BLENDER

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax

Air Displacement Pipetting Modules. Total Integrated Liquid Handling

ProAir Clear LV 2 Pack

CubeSat Balloon Drag Devices: Meeting the 25-Year De-Orbit Requirement

5mm Infrared LED HIR7373B/L289

QFN DESIGN CONSIDERATIONS TO IMPROVE CLEANING A FOLLOW ON STUDY

DETERMINATION OF THE DEPTH OF CLOSED BLIND CRACKS IN NON-METAL CHECK SAMPLES AND TEST PANELS FOR PENETRANT TESTING

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

1. Functional description. Application program usage. 1.1 General. 1.2 Behavior on bus voltage loss and bus voltage. 1.

Succeeding with Production Air Leak Testing Methods. Paul Chamberlain President, CEO

MODEL WEIGH MODULE

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Common-duct series-cell electrolyzer with anomalous gas production rate

Validation of Custody Transfer Metering Skid at Site After Laboratory Proving

DIY Shallow Water Anchor Assembly Instructions for Rods, T-grips, Stainless Tips, Stainless Couplers, and the 4-in-1 Paddle

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

VISIMIX TURBULENT. HEAT TRANSFER PROCESS IN A SEMIBATCH REACTOR

To be used as a coating for potable water tanks and pipes. Independently tested and certified for potable water storage. Other

OPERATING INSTRUCTIONS MANUAL FOR QACV PNEUMATIC DOSING PUMP

SERIES 20 CHAMBERS THE RC-20 AND RC-20H CHAMBER ASSEMBLY

Waste Oil Extraction Unit

INTERFELS RADIAL AND TANGENTIAL TOTAL PRESSURE CELLS

Varithena Delivery System Instructions for Use INSTRUCTIONS FOR USE Please read the Product Monograph before using the product.

-SWEPT AWAY- Description & Overview. VEX Classroom Competition Swept Away

ADVANCES in NATURAL and APPLIED SCIENCES

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

SERIES 20 CHAMBERS THE RC-25 AND RC-25F CHAMBERS ASSEMBLY

High Density FPGA Package BIST Technique

Vacuum grease can be applied to Warner chambers by use of a small artist s dotting brush or a syringe. Both approaches are described below.

3.1.3 Weight. Frequency. Weight is obtained at the baseline examination and annually. Equipment

VALVES & MEASUREMENT

PRODUCT CARD WALL MOUNTED FIXED BASKETBALL CONSTRUCTION PROJECTION: FROM 1,00 TO 2,25 M

Varithena Delivery System Instructions for Use

Epoxy Non-chromate Corrosion Inhibiting Primer. Alumigrip 4101P001 Alumigrip 4901 (CS4901) AkzoNobel Aerospace Coatings. Bombardier Hawker Beechcraft

Casing Spacer Technology Leaders

Load Responsive Multilayer Insulation Performance Testing

Method of Test for Flat & Elongated Particles

Voiding Control for QFN Assembly

A Table Top Wind Tunnel You Can Build

Irizar (PB Irizar: Coach of the year 2004 in Europe, Spanish coach of the year 2002 ) Design Freedom 1. Large to very large parts 2

Figure 1 Schematic of opposing air bearing concept

Transcription:

CHANGE RECORDS Ed./Rev. Date Verified and approved by Description Writer 1 12/31/2015 WY / LLR Initial Document FS 2 02/26/2016 FS / LLR - 1.2. : new applicable document added : validation of the mounting of 3D PLUS memory stacks on pcb - 1.3. : new document in reference added : 3M 2216B/A Gray added - 3.2. : new adhesive added : 3M 2216B/A Gray WY TABLE OF CONTENTS 1. GENERAL... 3 1.1. Purpose and scope... 3 1.2. Applicable documents... 3 1.3. Documents in reference... 3 1.4. Definitions... 3 2. PROPOSED SOLUTIONS FOR UNDERFILLING... 4 2.1. Recommended solution (1): Basic underfilling... 4 2.2. Alternative solution (2): Underfilling through holes in board... 4 2.3. Alternative solution (3) : Underfilling limited by a H spacer... 4 3. MODUS OPERANDI FOR UNDERFILLING (SOLUTION 1)... 5 3.1. Toolings... 5 3.2. Adhesives... 5 3.2.1. Choice of adhesive... 5 3.2.1. Preparation of mixture... 5 3.3. Preparation of toolings and modus operandi... 6 3.3.1. Preparation of the dispense tip... 6 3.3.2. Estimation of quantity of glue to dispense... 8 3.3.2.1. Inputs to define:... 8 3.3.2.2. Outputs to define: dispense parameters... 8 3.3.2.3. How to evaluate the dispense parameters:... 8 3.4. Underfilling of the module on the board... 9 3.5. Just a few information about solutions (2) and (3)... 11 Doc. N :3641-0841-2 Page 2/11

1. GENERAL 1.1. PURPOSE AND SCOPE This document aims to describe the process for underfilling a SOP module mounted on a board. This process is used at 3D PLUS for assembly verifications. In the following chapters, the 3D PLUS module 3DSS24G08VS3626 RTIMS-FLASH is chosen as example. 1.2. APPLICABLE DOCUMENTS AD1 : Assembly Recommendations - Manual Reflow - SOP Packages - ref: 3300-1300 AD2 : Assembly Recommendations - Automatic Reflow - SOP and BGA packages - ref: 3300-1301 AD3: Validation of the mounting of 3D PLUS memory stacks on pcb Ref : 3300-1303-1 1.3. DOCUMENTS IN REFERENCE RD1 : Datasheet of Hysol Eccobond 285 with Catalyst 11 RD2 : Datasheet of 3M 2216B/A Gray 1.4. DEFINITIONS Stand-off : distance between the lead and its pad The presence of a stand-off is mandatory for stress relaxation in the solder joints after module assembly. The stand-off is recommended to be between 50µm and 150µm Doc. N :3641-0841-2 Page 3/11

2. PROPOSED SOLUTIONS FOR UNDERFILLING 2.1. RECOMMENDED SOLUTION (1): BASIC UNDERFILLING PROS : The solution is used for assembly verification procedure CONS : Some space around the part is required on one side of the part 2.2. ALTERNATIVE SOLUTION (2): UNDERFILLING THROUGH HOLES IN BOARD PROS : This solution eases the process of underfilling CONS : This solution limits the routing access on both sides of the boards holes 2.3. ALTERNATIVE SOLUTION (3) : UNDERFILLING LIMITED BY A H SPACER PROS : Similar to the recommended solution, but this solution lower the risks of underfill overflow «H» spacer CONS : This solution limits the access and visibility for visual inspection just after assembly Note 1 : the H spacer has to be mounted onto the board before module assembly Note 2 : The thickness of the {spacer + bond} has to be strictly lower than the gap between board and module body. Note : only the recommended solution (1) will be described in the following chapters. Doc. N :3641-0841-2 Page 4/11

3. MODUS OPERANDI FOR UNDERFILLING (SOLUTION 1) In this document, it is important to note that before any underfilling, the module is mounted on the board according to the assembly recommendations for manual reflow (3300-1300) or for automatic reflow (3300-1301) available on the website. The modus operandi explains how to perform a constant width and well-centered underfill between the module leads, thanks to a discontinuous process the underfill is the sum of several dots of adhesive dispensed at regular pitch. 3.1. TOOLINGS Time/Pressure-controlled dispenser with adjustable timer Low volume syringe : (10cc or 30cc for example) 38mm-long flexible dispense tip Precision balance (+/- 0.01g) 3.2. ADHESIVES 3.2.1. CHOICE OF ADHESIVE The glue used for mechanical reinforcement is the bi-component thermal epoxy adhesive : 3M 2216 B/A Gray (see RD2). It has been qualified with a wide range of 3D PLUS products (see AD3). Eccobond 285 with catalyst 11 seems to be a good alternative, but has only been tested on one 3D PLUS product. This combination of Eccobond 285 / Catalyst 11 is compatible for space applications in term of outgassing, and is well adapted for thermo-mechanical behaviors (CTE, temperature range ) and ease of process (pot life, viscosity ) (see RD1). It is important to note that before any underfilling, the module is assembled on the board according to the assembly recommendations for manual reflow (3300-1300) or automatic reflow (3300-1301) available on the website. 3.2.1. PREPARATION OF MIXTURE - Respect the recommendation of mix ratio from the manufacturer. - Outgas the mixture with a vacuum chamber. - Let the adhesive mixture stand for 30 mn. - Put the mix into a syringe, in order to use the dispenser avoid bubbles as much as possible when putting the adhesive mix into the syringe. - Let the adhesive mixture stand in the syringe for 15 mn at least before any use. Doc. N :3641-0841-2 Page 5/11

3.3. PREPARATION OF TOOLINGS AND MODUS OPERANDI 3.3.1. PREPARATION OF THE DISPENSE TIP The purpose of this preparation is to ease the repeatability of underfilling, in term of positioning and quantity. Original tip In order to keep the end of the tip centered between the lead rows: - Put a Kapton tape bent flat on itself at the end of the tip. - Symmetrically cut the tape a little shorter than the gap between both rows (for example on : 3DSS24G08VS3626 RTIMS-FLASH : gap = 24.5mm cut ~ 23-24mm). Tip with Kapton Tape This way, the end of the tip will remain centered between the lead rows. In order to create a constant width underfill (also to avoid any extra adhesive on leads). - Add many marks at regular pitch (1mm for example) with indelible pen. Tip with marks Doc. N :3641-0841-2 Page 6/11

In order to ease the flow on a large width (case for wide gap between lead rows over 15mm : (this is not mandatory) - Make 2 small chamfers at the end of the tip to allow that the adhesive spreads more widely. End of the tip with 2 chamfers In order to ease the insertion of the tip between the board and the module : - Pinch the tip in order to squeeze it under the module. (Tips used at 3D PLUS have a 1.6mm diameter step required if the diameter is greater than 1.2mm). <1.2mm Flattened tip Doc. N :3641-0841-2 Page 7/11

3.3.2. ESTIMATION OF QUANTITY OF GLUE TO DISPENSE 3.3.2.1. Inputs to define: - The regular dispensing pitch: p (1mm is recommended). - The gap between module and board : e = 1.35mm (stand-off is included). - The expected area covered by the underfill : s (400mm2 for 3DSS24G08VS3626 RTIMS- FLASH). Note : for the area, a margin between underfill and lead has to be considered to avoid any contact between leads and underfill A good practice is to define the margin at >2mm for a <7.5mm gap, >3mm for a 7.5-14.5mm gap, >4mm for a >14.5 gap. - The Density : d (2.27 for Eccobond 285 + Catalyst 11). - The Estimated length of the underfill line : L ~ module length in row direction (28mm for 3DSS24G08VS3626). 3.3.2.2. Outputs to define: dispense parameters - The number of pulses to do for each step/dot of underfill : n. - The Pressure on the dispenser : Pr. - The Time/Tempo : Tp. - The rest time of the mixture before dispense: Rt. 3.3.2.3. How to evaluate the dispense parameters: - Calculate the volume to dispense : V = s. e. = 540mm3 for 3DSS24G08VS3626 Or the mass to dispense M = s. e. d. = 1.22 g for 3DSS24G08VS3626 - Define the dispense parameters Pressure and Timer/tempo by iterations: o For a given set of parameters : Pressure Pr: pressure set on the dispenser Time Tp: tempo set with the timer button o Count how many pulses Np are needed to reach the mass M thanks to a precision balance If Np is a multiple of L / p : the set of parameters is correct If Np is too far of a multiple of L / p : iterate on a new set of parameters adjusted to approach a multiple. (Note : the multiple should be 1, 2 or 3 in order to let the underfilling process more comfortable and less risky for the operator) - And this multiple is n, the number of pulses for each step/dot of the underfill - Note the rest time of the mixture Rt, in order to perform the underfilling in a range of 1H around this rest time. (beyond this range, the viscosity changes and it may affect the result on the underfill) Doc. N :3641-0841-2 Page 8/11

3.4. UNDERFILLING OF THE MODULE ON THE BOARD After the rest time Rt of the mixture : - Set the dispense with Time Tp and Pressure Pr - Verify that the tip is filled with adhesive all along and that its end is clean - (1) Insert the tip between the board and the module, until its end appears on the opposite edge. Then (2) note the mark position on the tip, right to the insertion edge. 1 2 1 2 1 - (3) Before underfilling: o Go 1 Step back for narrow underfill (gap between lead rows <= 7.5mm) o Go 2 Steps back for medium underfill (gap between lead rows : between 7.5mm and 14.5mm) o Go 3 or more Steps back for large underfill (gap between lead rows : > 14.5mm) (Note that this step back depends on the pitch of marks too) 3 Doc. N :3641-0841-2 Page 9/11

- (4) Do many pulses, until the adhesive appears on the edge of the module. 4 3 4 3 4 - By iterations, until the end of the tip gets out: 3 o (5) : Go 1 step back o o (6) : do n pulses Repeat steps (5) and (6) until the end of the tip gets out 6 1 5 1 - (7) End of the underfilling Doc. N :3641-0841-2 Page 10/11

3.5. JUST A FEW INFORMATION ABOUT SOLUTIONS (2) AND (3) For solution (2) : - The number of holes through the board must be defined by the customer - The principle for defining the number of pulses or the quantity of adhesive can be similar to the principle presented above. For solution (3): - The principle is the same, but the Kapton tape is not necessary, and the quantity will be injected in 2 halves, from both edges. Doc. N :3641-0841-2 Page 11/11