Sidewalk Accessibility Checklist

Similar documents
WALKABILITY CHECKLIST How walkable is your community?

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability.

PART A: IDENTIFICATION/LOCATION

NORTH LAUDERDALE WALKING AUDIT: VIRTUAL APPENDIX

All Season Age Friendly Pedestrian Safety and Walkability Checklist *

Wheelchair Use Confidence Scale for Manual Wheelchair Users (WheelCon-M, Version 3.0)

Streets. Safe for Pedestrians 20% 2nd 5,000. Are We People-Friendly?

Middle School Walk Audit Booklet

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Active Transportation Audit

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Monument Elementary School Trenton, NJ School Travel Plan

Walking Audit Supporting Information

Mobility Scooter Challenges

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

MPO Staff Report Technical Advisory Committee: September 13, 2017 MPO Executive Board: September 20, 2017

Sidewalks and Streets Survey

Active Neighborhood Checklist: Protocol

Memphis Walkability Toolkit

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.

ADA on Construction. Guidance for Section C Plan Preparers

Accommodating Pedestrians in the Work Zone

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

ACTIVE TRANSPORTATION Active Community Checklist

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Designing for Individuals who are visually impaired or blind

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Arts Center Rail Station Accessibility Assessment

Appendix B - Street Sections

City of East Grand Forks. ADA Transition Plan. Inventory Manual. June, 2018 DRAFT

Niantic Center Elementary School

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Emerson Circle Entrance

Option W: N. Washington Street Project

Guthriesville Village Manual of Written & Graphic Design Guidelines

A. Pedestrian Facility Design

10/30/2012 VIA

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

City/ Town: Route: Intersection Name; Street Names:

Steps to Conducting a Complete Streets Assessment

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Clarkson Walkability Audit: Results and Recommendations Summary

Report on Walkability Survey and Workshop for ZIP Code Hosted by the Oklahoma City-County Health Department April 13, 2013

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

First-Mile, Last-Mile Connections to Transit Workshop Report

Derby Street. Project Updates. Salem, Massachusetts

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

Street resurfacing 45WARD

RE: Park Plaza Walgreens (P12-016)

Muizenberg Accessibility: Removing barriers to public spaces.

Victoria Park Master Plan

Burke Road North Tennis Facility Audit

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

Cyril Cummins Reserve Facility Audit

From 8 to 80: Creating Livable Communities for All Ages: Examples of connecting people to parks and providing opportunities for all to be active

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

Falls and Injury Prevention. Built Environments that Promote Active Living for Seniors. Safe States Alliance Annual Meeting

Waipio Point Access Road Acessible Path Concept Site Plan. Waipahu Aloha Clubhouse


Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Accessible Sidewalks and Street Crossings

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Walkability Study Prepared by

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

ACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES

In-Roadway Warning Light Systems Overview, Evaluation, Installation and Investment Considerations

Midtown Rail Station Accessibility Assessment N4

Preparing a Curb Ramp Project. December 15, 2010

GENERAL. 1. Description

PROJECT SUMMARY ALBERTA STREETSCAPE PROJECT

Tolono. Walkability/Bikeability. Map data 2018 Google

Segment Number Quick Pathways Accessibility Tool. Name of Street: Segment Identification:

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

Operations and Maintenance of Pedestrian Facilities Chapter 4. Operations and Maintenance of Pedestrian Facilities

SECTION 14: LANDSCAPING AND BEAUTIFICATION

What Is a Complete Street?

9. APPENDICES Disciplines of Mountain Biking

MARTIN LUTHER KING JR. WAY

Complete Streets. Designing Streets for Everyone. Sarnia

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Neighborhood Pedestrian Safety and Traffic Calming Study

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

St. Francis Drive through the City of Santa Fe Corridor Study

Walkability Audit Scores and Comments Lacey, Tumwater, and Olympia, WA September 2012

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Walkable Community Workshop Report

Walkable Communities Workshop Anderson, IN Final Report

11/28/2016 VIA

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Sarasota High School June 26, 2018

INTEGRATED ACCESSIBILITY STANDARDS REGULATION. Training Module for the Design of Public Spaces Standard

Portland Peninsula Sidewalk and Ramp Inventory

Transcription:

Starting Address: Ending Address: Date: Sidewalk Accessibility Checklist Please indicate your experience with any barriers you encountered when using the sidewalks in your neighborhood. 1. Did you have enough room on the sidewalk to walk/roll safely? If, please place a check mark by things you encountered No sidewalk existed Sidewalks started and stopped Sidewalks were too narrow Sidewalks were blocked with poles, signs, or other obstacles Sidewalks were blocked by branches or other vertical obstacles Adequate places for two people to pass each other were not provided Specific Location of : (i.e. Southeast corner of Halsted and 14 th Street or 1845 Lexington) Side Walk Accessibility Checklist 4/14/2010 1 of 6

2. Could you easily use the sidewalk? If, please place a check mark by things you encountered Sidewalks were excessively steep Sidewalks had severe cross slopes (does sidewalk slant one direction or the other) Adequate rest areas and/or level areas were not provided Adequate shaded areas were not provided Specific Location of : (i.e. Southeast corner of Halsted and Side Walk Accessibility Checklist 4/14/2010 2 of 6

3. Was the surface easy to walk/roll on? If, please place a check mark by things you encountered Sidewalk surface was not firm (sand, gravel or grass) Sidewalks were covered with leaves or other debris Sidewalk surfaces were slippery Sidewalks were broken or cracked Gratings for trees and drainage were unavoidable Sidewalk or street under construction Specific Location of : (i.e. Southeast corner of Halsted and Side Walk Accessibility Checklist 4/14/2010 3 of 6

4. Were curb cuts easy to use? If, please place a check mark by things you encountered No curb cuts were provided Curb cuts needed repair Puddles, gravel, or debris were collected in the bottom of the curb cut No tactile warning was provided (different texture (bumps, grooves, etc.) Steepness made entering or leaving the curb cut difficult Obstacles such as poles or grates blocked the curb cuts Curb ramp starts in the street Specific Location of : (i.e. Southeast corner of Halsted and Side Walk Accessibility Checklist 4/14/2010 4 of 6

5. Was it easy to cross the street? If, please place a check mark by things you encountered Difficult to tell the difference between where the sidewalk ended and the street starts Street too wide, takes too long to cross No traffic signals or pedestrian signals Traffic signals made you wait too long Traffic signals did not give you enough time to cross Pedestrian signal controls were difficult to locate Pedestrian signal controls were difficult to activate No Stop Sign No marked crosswalk Parked cars blocked your view of traffic Trees or plants blocked your view of traffic Specific Location of : (i.e. Southeast corner of Halsted and Side Walk Accessibility Checklist 4/14/2010 5 of 6

6. Was your walk/roll pleasant? If, please place a check mark by things you encountered Needs more grass, flowers, or trees Too much exposure to traffic Exposed to suspicious activity Walkway not well lit/did not feel safe Dirt, lots of litter and trash No benches were available to sit on No pedestrian shelters or shaded areas to rest Any additional comments you have about your walk/roll experience: Side Walk Accessibility Checklist 4/14/2010 6 of 6