FUSSELL S TRIAL BALANCE LOCK A BOAT LIFT NEAR MELLS

Similar documents
FUSSELL S TRIAL BALANCE LOCK A BOAT LIFT NEAR MELLS, SOMERSET

1.5 m. 2.4 m. Fig the pressure exerted by the oil on the base of the tank, the force exerted by the oil on the base of the tank.

In the liquid phase, molecules can flow freely from position. another. A liquid takes the shape of its container. 19.

In the liquid phase, molecules can flow freely from position to position by sliding over one another. A liquid takes the shape of its container.

Building a Wind Tunnel

The Mendip Way. Route Directions and Maps Wells to Frome

A. TO PREPARE THE MACHINE FOR USE.

Preliminary design of a high-altitude kite. A flexible membrane kite section at various wind speeds

WINDING HOLES towards a specification for the ideal turning place

2010 International Snow Science Workshop

Push & Pull You can see the forces push and pull at work with this door. We can push the door to close it, or pull the handle to open it.

Circular Turning Space. 8 Significant Changes to the ICC A

Marine Construction & Welding Prof. Dr. N. R. Mandal Department of Ocean Engineering & Naval Architecture Indian Institute of Technology, Kharagpur

Canals. All About. These notes are designed to help you with homework and other projects. canalriverexplorers.org.uk

First Team Sports, Inc. Stellar Recreational Volleyball System

Building Bridges. This pack consists of activity sheets for individual and group work, and whiteboard pictures for class discussion.

Hoxne Slaughterhouse and the Low Street Butcher s Shop

Hatch cover securing and tightness

PRO1030 Bi-Directional Assembly Replacement

Chain Drives. 1. As no slip takes place during chain drive, hence perfect velocity ratio is obtained

WIRE ROPE PULLING MACHINE

CAISSON SHAFT SYSTEM

Pulling strings to build pyramids

SECTION BUTTERFLY VALVES

Slide 1 / What is the density of an aluminum block with a mass of 4050 kg and volume of 1.5 m 3?

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE

FEE SCHEDULE POOL PERMIT FEES. Refundable Security (Cash of L.C.) 1 Hot Tub, Spa, etc. $ nil 2 Above Ground Pool $ nil

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division

Assembly Instructions. -Cantilever Boat Lifts

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND

First Team Sports, Inc. Blast Recreational Volleyball System

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

Solar panel. C ground profile (N-S) Omega ballast plate

Friday, December 28, 2001 United States Patent: 4,100,941 Page: 1. United States Patent 4,100,941 Ainsworth, et al. July 18, 1978

Cambrian Slate Mine 13 June 2008 by Simplyexploring & Gaz

Float operated valve TYPE (SWDS)

AHOC 2015 ANTLER BIOGRAPHY

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

Authors: Mário Rui da Cunha Pereira, Hands on Science

A by-law to regulate pool enclosures within the Town of Oakville

Lab 11 Density and Buoyancy

Quattrocycle BV. Quattrocycle. User Manual. Last update February Quattrocycle BV Bremkant EJ Middelbeers. User Manual Quattrocycle 1

The Dartboard. Anyone interested in doing some programming could also find a lot of things to do here.

Item 404 Driving Piling

Students will use two different methods to determine the densities of a variety of materials and objects.

Hannes et al. 45 Date of Patent: Mar. 3, 1992 (54) BICYCLE RACK FOR PICK-UP TRUCK OTHER PUBLICATIONS

Slide 5 / What is the difference between the pressure on the bottom of a pool and the pressure on the water surface? A ρgh B ρg/h C ρ/gh D gh/ρ

Walk - Run Activity --An S and P Wave Travel Time Simulation ( S minus P Earthquake Location Method)

Stourport motor barge Severn Collier

-SWEPT AWAY- Description & Overview. VEX Classroom Competition Swept Away

Simple Machines. Work (in) = Work (out)

Scout Skills Lashings

Contents GB+USA. What does dynamics mean? 12. Elevator/Conveying Equipment 12

Exploring the Prinz Eugen Indiana Jones Goes Underwater Lesson Plan

United States Patent (19) 11 Patent Number: 5,493,591 Kadowaki 45 Date of Patent: Feb. 20, 1996

BYLAW NUMBER

GOLFWORKS THE. INSTRUCTIONS FOR: Maltby Golf Club Gauge Code: GW1040. Maintenance and Care. Operating Instructions.

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL

. In an elevator accelerating upward (A) both the elevator accelerating upward (B) the first is equations are valid

-Round Down- Description & Overview. VEX Classroom Competition Round Down

Murray s Boat Disengaging Gear

Try it! You ll like it!

The Solano. The Solano model as she looked in fall Cabins and superstructure are about to be built following a winter break.

Squeegee Unit for MRS Multi-Recovery System

Draft Indian Standard SAFES Part 2 Tests for Burglary Resistance (Fifth Revision)

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

GEAR TECHNOLOGY NOTE - Towed Gear

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

Chain Drives ELEMEN MESIN II

2016 BRISCA MICRO STOCK CARS Technical Information & Procedures

Newport Trow Jonadab

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

UNDERWATER ROBOT COMPETITION

European Handball Federation TM EHF Beach Handball Commission

TRP 63 / TRP 72 / TRP 93 / TRP 110 CENTRE LATHES

Bowsprit Hinge on "Bumble Chugger" By Robin Whittle, Shrimper 124 (Bumble Chugger) (Winter 2003)

(12) Patent Application Publication (10) Pub. No.: US 2015/ A1

REQUIREMENTS FOR NEW AND EXISTING DOMESTIC SWIMMING POOLS

HOW TO DIG A TEST PIT

Building Clay Tennis Courts

Optimist Tuning Guide

Quiz name: Chapter 13 Test Review - Fluids

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Our experiences helping villagers to improving their water supplies in East Timor

Mini Glider Manual. Your Glider comes partially assembled. The front wheel and the handlebars require assembly.

Boat Boat Loader Fitting Instructions

Here is a summary of what you will learn in this section:

CITY OF TORONTO. BY-LAW No

One major challenge in this objective was the fact that the Forth and Clyde Canal lay 35m (115ft) below the level of the Union Canal.

TECHNICAL DATA - CHASSIS 99

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

BASIC AIRCRAFT STRUCTURES

MECHANICAL POWER-TRANSMISSION APPARATUS SELF INSPECTION CHECKLIST

robart HOW-TO Series Model Incidence Meter

Installation, operation & maintenance manual - original version

(12) Patent Application Publication (10) Pub. No.: US 2005/ A1

TR-AUGER. Section C INDEX BOOT / HOPPER

LAB 7. ROTATION. 7.1 Problem. 7.2 Equipment. 7.3 Activities

Wrecking barge Petrus

Cycle Shelters & Bike Racks

Transcription:

FUSSELL S TRIAL BALANCE LOCK A BOAT LIFT NEAR MELLS Derrick Hunt and Adrian Tuddenham Strung out along a secluded valley at the extreme eastern end of the Mendips in Somerset are a number of strange structures which appear to have served no purpose. At Edford there is a canal bridge in a field and in Coleford there is a spectacular aqueduct, high above the village, apparently connected to nothing whatsoever. Not far from Frome is the remains of a staircase of what appear to be deep, strangely misshapen, lock chambers excavated into a hillside. These are some of the surviving remains of the Nettlebridge branch of The Canal that Never Was, the Dorset and Somerset Canal. [See Fig. 1 for a map of the main line and Fig. 2 for the branch line] Started in 1796, the canal was never completed and many of its engineering features have been shrouded in mystery and were believed lost forever. With the formation of the Dorset and Somerset Canal Study Group in 1995, the scattered pieces of information have been gradually brought together and a clearer picture is emerging of how the canal was intended to have been built. This research was not helped by the fact that the Company Records have disappeared without trace. Of particular interest was the involvement of James Fussell (1748-1832), a shareholder in the canal and an ironmaster who had established an edge-tool works at Mells, near Frome, not far from the line of the canal. He had a number of patents to his name and one, No.2284 of 1798, [See Fig. 3] was worthy of special attention: it was for a Balance Lock for Raising and Lowering Boats, &c.; applicable to other purposes. Fussell s Balance Lock was a two-tank boat lift which pre-dated the better-known Anderton Boat Lift, in Cheshire, by a very long way and was the very first of that kind in the world. Fussell had taken out patents on several specialised chains of his own design and he hit upon the idea of using his newly invented sprocketed chain to synchronise the movement of the two ends of the long tanks of water. Without this invention to hold them level, the tanks would have been unstable and the water would have run to one end and capsised them. The large masonry structure containing the tanks was divided into two chambers and let into a hillside where the canal changed level. The staircase which appeared to be lock chambers at Barrow Hill near Buckland Dinham was in fact a staircase of boat lifts based on Fussell s principle. It had evidently fallen victim to the canal s premature demise because it had never been completed. The remains of five pairs of lock chambers have survived to this day [See Figs. 4 & 5 ]. There was tantalising contemporary newspaper evidence [Bath Chronicle 16 Oct 1800] that an earlier trial balance lock had been built elsewhere on the canal to test out the principle and that one had actually worked. The search homed-in on a section of canal on the Mells Estate where a change of level occured inside a densely-wooded valley. This was the site which had earlier been identified by the late Robin Atthill as the most likely position for the trial lock; fortunately, he had shown the location to Gerald Quartley, who passed this information on to the authors. A visit was arranged to the site [See Fig. 6], but the only clue that anything might possibly lie beneath the surface was a couple of dressed stones which appeared to have been laid as a course of masonry. With the landowner s permission the area was cleared [See Fig. 7] by work parties from the D&SC Group, Bradford on Avon Scouts and the Somersetshire Coal Canal Society (who have a particular interest in boat lifts of all types). Further work with a pickaxe [See Fig. 8] revealed that this indeed had been the site of a structure. One 8ft. wide masonry wall with returns at each end was uncovered. Evidence for another similar wall was also found about 8ft. 6in. to one side of it. The total size of the structure was not clear at this stage, but it gradually became apparent that a major work of excavation, beyond the capabilities of hand digging, would be needed to uncover it all. With archæologists on hand, a large excavator was brought in to see what else might be found. In particular, the length and depth of the structure was unknown at this stage, so we could not be certain that what we had found was a boat lift. This doubt was soon dispelled as the massive extent of the structure was revealed [See Fig. 10]. The result was vastly beyond anyone s expectations - the excavation opened up a masonry chamber 30 ft. long, 8 ft. wide, with other evidence suggesting that the structure had probably been over 30 ft. high [See Figs. 15a & 15b ]. An archway at basement level appeared to lead to a second parallel chamber, filled with rubble, making the entire structure 24 ft. wide. At this stage it was decided to analyse the results and sort through the evidence which had been found, before contemplating further excavation. The excavation of the second chamber was undertaken the following year and revealed a similar structure [See Fig. 16] and an even greater quantity of artefacts [See Figs. 12, 13 & 14].

With what we already knew from Fussell s patent description and the discoveries we had just made, we were now in a good position to describe the operation of the mechanism which occupied the two chambers. [See Figs. 9 & 11] CONSTRUCTION The Balance Lock comprised two tanks full of water, each long enough to contain a boat. At the place where the canal stepped from one level to another, they were arranged in a pit, side-by-side with one end towards the upper canal and one end towards the lower. Running the whole length of the space between the tanks was a wall, on top of which were iron wheels. These were larger in diameter than the thickness of the wall so that chains draped over them hung down slightly clear of the wall on each side. BALANCE The tanks were suspended from the chains by a pulley arrangement and the lengths of the chains were such that when one tank was level with the bottom canal, the other was level with the top. The tank weights were adjusted to be equal, so that they were in balance and easy to move up and down with little effort. They could be moved with a hand crank geared to one of the wheels or by adding or removing a little water from one of the tanks. MOVING THE BOATS The ends of the tanks could be clamped against the ends of the top and bottom canals to make a water-tight seal. Doors or sliding panels were then removed to allow a boat to be floated from the canal into the tank. As the boat entered the tank a certain amount of water would have to flow out to make room for it - the weight of this water would be exactly the same as the weight of each boat with its cargo, so the balance of the tanks would not be upset. With the boats in the tanks, the doors or panels were replaced to seal the ends of the canals and the tanks. The tanks could then move up on one side and down on the other so as to deliver the boats to their new levels. CONCLUSIONS 1) The Trial Balance Lock described in the Bath Chronicle was built at the site identified by Robin Atthill, half a mile from the main Barrow Hill flight. 2) The dimensions of the construction have been measured [Figs. 15a & 15b] and the maximum size of the boats estimated at 22ft long by 8ft wide. 3) The mechanical construction of the Lock was substantially as described in Fussell s patent 2284. Contact for further information: Derrick Hunt, 43 Greenland Mills, Bradford on Avon,Wilts. BA15 1BL 01225 863066 Bibliography: Old Mendip Robin Atthill ISBN: 0 905220 55 2 The Dorset & Somerset Canal Kenneth R. Clew ISBN: 0 7153 5228 8 Canal Inclines & Lifts David Tew ISBN: 0-86299-344-X

Fig 1 - Dorset & Somerset Canal main line Fig 1 - Dorset & Somerset Canal main line Fig 2 - Dorset & Somerset Canal branch line

Fig 3 Fussell s Patent 2284 Title page

Fig 4 The Staircase of Lock Cambers at Barrow Hill Fig 5 One of the Lock Cambers

Fig 6 Investigation of the site Fig 7 Clearance of the site viewed from the upper level

Fig 8 Uncovering the masonry of the chamber Fig 9 Fussell s Balance Lock, longitudinal section

Fig 10 Uncovering the extent of the first chamber

Fig 11 Fussell s Balance Lock, transverse section

0 2 4 CM 6 8 10 Fig 12 Some of the smaller artefacts A leather seal, a mason s chisel, nails, hook. 0 2 4 CM 6 8 10 Fig 13 Some further artefacts A brass bearing block, a wrought iron chain link

cm 0 10 20 30 Fig 14 Larger artefacts Two curved cast iron segments, a bolt & nut, unidentified casting

Longitudinal section (side view) Plan view Fig 15a Dimensions of the Balance Lock

Fig 16 Both chambers excavated Fig 15b Dimensions of the Balance Lock