Evaluating a Cycling Strategy

Similar documents
Appendix N(b): Portishead Station Outline Travel Plan

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

Our journey a 20 year Transport Manifesto for the North East

9. Parking Supporting Statement

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Active Travel Strategy Dumfries and Galloway

This report is PUBLIC [NOT PROTECTIVELY MARKED] WMCA Board. (1) To approve the adoption of the West Midlands Cycle Design Guidance.

Welcome. Background. Goals. Vision

Sandwell General Hospital Travel Plan 2014

University of Leeds Travel Plan

SUSTAINABLE TRAVEL TOWNS: RESULTS AND LESSONS

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

2. Context. Existing framework. The context. The challenge. Transport Strategy

WEST YORKSHIRE LTP CYCLE PROSPECTUS

Greater Cambridge City Deal Executive Board & Joint Assembly

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

Thursday 18 th January Cambridgeshire Travel Survey Presentation to the Greater Cambridge Partnership Joint Assembly

North West Non-Technical Summary of the Transport Assessment September 2011

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

London Cycle Network Annual Report 2000

Active Transportation Infrastructure Investment A Business Case

Westminster s Joint Health and Wellbeing Strategy

Living Streets response to the Draft London Plan

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Using a Mixed-Method Approach to Evaluate the Behavioural Effects of the Cycling City and Towns Programme

DRAFT for a State Policy for Healthy Spaces and Places

KEY FINDINGS OF THE INTERIM EVALUATION OF THE SMARTER TRAVEL AREAS PROGRAMME

Making the case for active travel

Regional Cycle Programme Update

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Bikerail - combined journeys by cycle and rail

Easton Safer Streets - Final Project Report BRISTOL

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

4.1 Introduction. 4.2 Aspects of walkable communities

Evaluation. Monitoring and 8.0

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

THE TWO BANKS OF THE TAGUS RIVER BY INTEGRATING THE BYCICLE INTO A MULTIMODAL SYSTEM

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Understanding barriers to participation across gender, age & disability

ABERDEEN: CITY OF THE FUTURE

The Safe System Approach

The Value of Cycle Tourism

What s the issue for transport in Cardiff?

Tonight is for you. Learn everything you can. Share all your ideas.

European Levels of Investment in Cycling: Results and Insights

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Section 2 Strategic Alignment. Contents

TRANSPORTATION TOMORROW SURVEY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Welcome! Public Open House on UBC s Transportation Plan

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Public Event 1 Community Workshops

Investment in Active Transport Survey

RE-CYCLING A CITY: EXAMINING THE GROWTH OF CYCLING IN DUBLIN

Transportation Master Plan Advisory Task Force

National cycling programme investment priorities and approach summary

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Roads and public rights of way

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Integrated Urban Mobility

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Department for Transport

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

Economic Appraisal of Active Travel Schemes

UNDERSTANDING WALKING NETWORKS TO ENABLE SMARTER CHOICES IN TRANSPORT PLANNING IN DUNDEE. Gillian Iversen Atkins

Route User Intercept Survey Report

GD 0043/18 ACTIVE TRAVEL STRATEGY

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Developing a Safer Cycling Strategy for the ACT ACRS Conference August 2012

Cambridge Access and Capacity Study

LEEDS BECKETT UNIVERSITY. Transport Strategy

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

Final Plan 20 December 2016

No-car lanes in Tyneside results from modelling and stakeholder analysis

Part 3: Active travel and public transport planning in new housing developments

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Transportation Assessment

Access BART: TOD and Improved Connections. October 29, 2008

Bicycle Queensland s Brisbane Council Election Priorities

Our Approach to Managing Level Crossing Safety Our Policy

Launceston's Transport Futures. Greater travel options for the people of Launceston

Interchange matters London TravelWatch 21 st June John Barry Head of Network Development - Buses Transport for London

Cambridgeshire Local Transport Plan Policies and Strategy

Measuring and growing active modes of transport in Auckland

Environment Committee 29 September 2016

QUEENSTOWN TOWN CENTRE TRANSPORT STRATEGY

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

A Strategy for Increasing Walking and Cycling

Government transport policy

Neighbourhood Development Plan: Ashtead INTRODUCTION 2 SUMMARY CONCLUSION CAR USE AND CONGESTION IN ASHTEAD 4

Transcription:

Evaluating a Cycling Strategy Developing a pragmatic methodology in Newcastle Tom King (Newcastle Cycling Forum) Rob Snowball (Newcastle City Council)

Context - Newcastle Cycling Strategy Ten year plan from 2012 with midterm review Cycle City Ambition funding - 6M (plus further investments) Delivering schemes for strategic route network Providing information for trips to change behaviour Removing barriers to cycling and increasing journeys Evidence-based with consultations and evaluation

Evaluation vs Audit Have we delivered what we were aiming for? Are we meeting service standards? Objectives Quality standards Cycle journeys Road surface User experience Journey times Public value Engineering

Scoping Evaluation Practice Strategy Monitoring data across cycle counters Bikelife surveys and stop and ask surveys Schemes Demand for before/after impact studies Lack of scheme-specific cycling objectives Process Regular reporting and consultation

Strategic Objectives Increase proportion of trips <3 miles cycled National Travel Survey derived DfT target Deliver strategic cycle network Radial routes into city centre diagrammed Scheme investments deliver strategic routes

Original Strategic Route Plan 2011 River Tyne to South of Central Nexus

Evaluating Strategic Routes Three joint evaluative rides in good conditions photos - observations - audit - recommendations Is it a route? Continuity; signage; extent; usage Is it strategic? Quality; connectivity; user experience; compromise

Routes - Frequently Asked Questions Where does it start? Which way now? Have you told anyone? What about this bit? Recommendation - plan for interim reintegration into traffic

Strategic Enhancements Directness and main road space suit higher speed cyclists (Aldred, 2014) Employer engagement for connectivity and destination provision needed e.g. BUGs Cyclists given priority is insufficient to reduce traffic speeds Linking to destinations beyond city centre between routes User communication and engagement on compromises

Auditing Infrastructure Demonstration and learning with experimental investments Revisiting historic (1990s) developments to calm traffic Cycle infrastructure can happen away from cycle routes Surface quality and space in cut throughs limiting Recommendation - user images of favourite infrastructure

Short sections of good quality surface badly linked up Tight turns Visibility Bollards

90s route infrastructure meets cycle city ambitions

Good design takes you by surprise protection from car park entrance on right of image

Local people may have established priorities for the road space Parking Trading

Increasing Cycling Trips Proportion of short trips lumps too many things together Trip character varies economically and demographically Perception of infrastructure for small number existing cyclists Trips can be be multimode stages between several stops Within and beyond city centre visitor travel behaviours vary Recommendation - collect data on diversity of trip types

Travel to Work Can be several stages - including cycling to rail station Excludes people not working - students; children; retired Travel to work - census 2011 roughly 3% cycle main mode Bikelife (household) telephone survey - 5% 2015-7% 2017 Recommendation - set target of 10% cycle to work in 2021

Strategic Evaluation Specify suitable objectives - cycling as transport for people Transport a means to an end - raising our eyes from the road Wait until completion to evaluate - relate process to strategy Contest established measurement and national deference Co-production really gives people space to think critically Recommendation - ride what you build in public perspective

Developing an Audit Approach Evaluation takes time and is easy to put off Many audit tools are available to quantify experiences Before/after is limited by dynamic nature of transport Audit needs to align with strategic objectives Infrastructure should empower and reduce barriers to cycling DfT is developing new guidance on local evaluation