SLOP RECEPTION AND PROCESSING FACILITIES

Similar documents
Assessment of Ships and Managers for the Acceptance of Extended Interval Between Bottom Surveys in Dry-Dock

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

STABILITY AND WATERTIGHT INTEGRITY, CLOSING APPLIANCES

Rules for Classification and Construction Ship Technology

RULES FOR CLASSIFICATION. Yachts. Part 5 Ship types Chapter 3 Passenger yachts. Edition October 2016 DNV GL AS

RULES FOR CLASSIFICATION Yachts. Part 5 Ship types Chapter 3 Passenger Yachts. Edition December 2015 DNV GL AS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

Part 7 Fleet in service Chapter 2 Inclining test and light weight check

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Electrical Shore Connections

STABILITY AND WATERTIGHT INTEGRITY

M-06 Nitrogen Generator (Nitrogen Making Machine)

CHEMICAL CARRIERS SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 4

Installation of Ballast Water Management Systems

GAS FUELLED ENGINE INSTALLATIONS

LNG BOIL-OFF RE-LIQUEFACTION PLANTS AND GAS COMBUSTION UNITS

CHEMICAL CARRIERS SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 4

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

GAS FUELLED ENGINE INSTALLATIONS

OFFSHORE SUPPORT VESSELS 2015

OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.]

NAVAL LANDING CRAFT HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT RULES FOR CLASSIFICATION OF DET NORSKE VERITAS

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

Technical Information

F All types of inert gas systems are to comply with the following:

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

PERIODICAL SURVEY REQUIREMENTS

LIQUEFIED GAS CARRIERS

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012

TEC-0461 To whom it may concern Date 25 June 2002

TYPE APPROVAL CERTIFICATE

PIPING SYSTEMS HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT RULES FOR CLASSIFICATION OF DET NORSKE VERITAS

INTERNATIONAL MARITIME ORGANIZATION

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 15 Stability. Edition October 2015 DNV GL AS

Part 3 Hull Chapter 2 General arrangement design

Tanker Familiarisation IMO Model Course Chapter 1-9

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 9 Fatigue. Edition October 2015 DNV GL AS

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

RESOLUTION MSC.236(82) (adopted on 1 December 2006) ADOPTION OF AMENDMENTS TO THE GUIDELINES FOR THE TRANSPORT AND HANDLING OF LIMITED AMOUNTS OF

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018

LIQUEFIED GAS CARRIERS

REGASIFICATION VESSELS

LIQUEFIED GAS CARRIERS

ANNEX 15. RESOLUTION MEPC.158(55) Adopted on 13 October 2006

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

Policy for Testing of Oil Discharge Monitoring and Control System Operational Procedure : QOP (17) Revision: 0 Page 1

RESOLUTION A.855(20) adopted on 27 November 1997 STANDARDS FOR ON-BOARD HELICOPTER FACILITIES

PIPING SYSTEMS HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT RULES FOR CLASSIFICATION OF DET NORSKE VERITAS

REGULATION on life boats operated from land, No 123/1999 CHAPTER I. General provisions Article 1

Testing Procedures of Watertight Compartments

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

RULES FOR CLASSIFICATION. Ships. Part 5 Ship types Chapter 6 Chemical tankers. Edition January 2017 DNV GL AS

FISHING VESSELS SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 6

CARGO OPERATIONS (TANKER) MANUAL CH.05 BALLAST HANDLING. Rev. No: 2. Page: 1 of PURPOSE

Product(s) approved by this certificate is/are accepted for installation on all vessels classed by DNV GL.

STCW Code Table A-V/1-1-1 Specification of minimum standard of competence in basic training for oil and chemical tanker cargo operations

Dynamic Positioning Systems

The Merchant Shipping (Marine Pollution) Regulations 2004

MSC Guidelines for Compressed Air Systems

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

RULES FOR CLASSIFICATION. Ships. Part 3 Hull Chapter 15 Stability. Edition July 2016 Amended January 2017 DNV GL AS

Summary of the MRA LPG Codes of Practice

RULES FOR CLASSIFICATION. Ships. Part 5 Ship types Chapter 6 Chemical tankers. Edition July 2017 DNV GL AS

ST. VINCENT AND THE GRENADINES

SOLAS requirements for nonpassenger ships 300 or above but less than 500 gross tonnage

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

Part 4 Machinery and systems Chapter 6 Piping systems, pumps and compressors

AIR VENT HEADS STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No OCTOBER 2008

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

Flexible hoses - Non-metallic materials

Guidelines for Clean Agent Fire Suppression Systems

Part E. Rules for the Classification of Ships. Service Notations. Effective from 1 January 2016

FISHING VESSELS SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 6

MARINE CIRCULAR MC-25/2012/1

RESOLUTION MEPC.64(36) adopted on 4 November 1994 GUIDELINES FOR APPROVAL OF ALTERNATIVE STRUCTURAL OR OPERATIONAL ARRANGEMENTS AS CALLED FOR IN

RESOLUTION MEPC.288(71) (adopted on 7 July 2017) 2017 GUIDELINES FOR BALLAST WATER EXCHANGE (G6)

AUTOMATIC HOSE TEST UNIT, TYPE SPU

PART 9 Rules for construction

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

DYNAMIC POSITIONING SYSTEMS

MSC Guidelines for Vents, Fills and Sounds

Health and Safety at Work (Hazardous Substances Reduced Secondary Containment for Certain Above Ground Stationary Tanks) Safe Work Instrument 2017

Reliability Analysis Including External Failures for Low Demand Marine Systems

NEWBUILDINGS MACHINERY AND SYSTEMS MAIN CLASS. Pressure Vessels JANUARY 2011

CARRIAGE OF DIRECT REDUCED IRON (DRI) BY SEA CHANGES TO THE IMO CODE OF SAFE PRACTICE FOR SOLID BULK CARGO

Circular No. 3/ March To the members. Dear Sirs,

MSC Guidelines for Review of Gas Carrier/Barge Structures

GUIDELINES FOR IMPLEMENTATION OF THE REQUIREMENTS FOR CONSTRUCTION AND EQUIPMENT OF TANKERS OF OIL INDUSTRY ORGANIZATIONS

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel

Life Extension of Mobile Offshore Units

RULES PUBLICATION NO. 119/P

Transport of gas tanks for motor vehicles

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS SCOPE

Procedural Requirement for Confined Space Safe Entry

Transcription:

RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 8 SLOP RECEPTION AND PROCESSING FACILITIES JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements... 4 Sec. 2 Hull Structures, Piping Arrangement, Separating System and Fire Protection... 6 Sec. 3 Operational Instructions and Log Book... 8 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11

CHANGES IN THE RULES General As of October 2010 all DNV service documents are primarily published electronically. In order to ensure a practical transition from the print scheme to the electronic scheme, all rule chapters having incorporated amendments and corrections more recent than the date of the latest printed issue, have been given the date January 2011. An overview of DNV service documents, their update status and historical amendments and corrections may be found through http://www.dnv.com/resources/rules_standards/. Main changes Since the previous edition (January 2003), this chapter has been amended, most recently in January 2004. All changes previously found in Pt.0 Ch.1 Sec.3 have been incorporated and a new date (January 2011) has been given as explained under General. In addition, the layout has been changed to one column in order to improve electronic readability. The electronic pdf version of this document found through http://www.dnv.com is the officially binding version Det Norske Veritas Any comments may be sent by e-mail to rules@dnv.com For subscription orders or information about subscription terms, please use distribution@dnv.com Computer Typesetting (Adobe Frame Maker) by Det Norske Veritas If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million. In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas.

Pt.5 Ch.8 Contents Page 3 CONTENTS Sec. 1 General Requirements... 4 A. Classification... 4 A 100 Application... 4 A 200 Class notation... 4 A 300 Documentation... 4 A 400 Certification control and monitoring system... 4 B. Assumptions... 4 B 100 Operational conditions... 4 Sec. 2 Hull Structures, Piping Arrangement, Separating System and Fire Protection... 6 A. Hull Strength and Arrangement... 6 A 100 General... 6 A 200 Fender arrangement... 6 B. Arrangement for Transfer of Oily Water and Oil Residues... 6 B 100 Hose and transfer arrangement... 6 B 200 Lighting... 6 C. Separating System... 6 C 100 General... 6 D. Oil Content Monitoring... 7 D 100 General... 7 E. Protection against Fire and Explosion... 7 E 100 General... 7 E 200 Fire protection, extinguishing and detecting systems... 7 E 300 Foam system... 7 E 400 Inert gas system... 7 E 500 Electrical installations in gas dangerous spaces and zones... 7 E 600 Miscellaneous... 7 Sec. 3 Operational Instructions and Log Book... 8 A. Instruction Materials... 8 A 100 Equipment and systems... 8 A 200 Procedures... 8 B. Safety and Oily Water/Oil Residues Log Book... 8 B 100 Log book contents and entries... 8

Pt.5 Ch.8 Sec.1 Page 4 SECTION 1 GENERAL REQUIREMENTS A. Classification A 100 Application 101 The rules in this chapter apply to newbuildings as well as to conversions of existing vessels to serve as floating facilities for reception and processing of oily water and oil residues. The subsequent requirements are to be regarded as supplementary to the requirements for main class and relevant requirements as given in Pt.5 Ch.3 for ships intended for carriage of oil with flashpoint below 60 C. A 200 Class notation 201 Facilities designed and built, surveyed and tested in compliance with the requirements in this chapter and other relevant requirements may be assigned the following additional class with the Society: Slop Reception and Processing Facility 202 The classification is aimed at safety against hazards to the personnel, the facility and the environment. 203 The assignment of class will be based upon: approval of documentation, i.e. specifications, plans, calculations, etc., approval of the instruction manuals for the facility, inspection during manufacturing of materials and equipment, inspection during construction, installation and testing of the facility, inspection upon completion, including testing of the separating system for proper function. Guidance note: In addition to the requirements of the Society, relevant requirements in the Regulations of National Authorities will have to be complied with in connection with the registration and or location of the facility. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e--- A 300 Documentation 301 In addition to the relevant parts of the documentation as required for oil tankers in Ch.3 Sec.1 C, the following is to be submitted for approval: Drawings and specification for the separating system. Drawings of the fendering arrangement. Specification of transfer hoses. Drawings of deck lighting arrangement. Instruction manuals for the facility. 302 The following control and monitoring systems shall be approved by the Society: oil separating system fire extinguishing system fire detection system inert gas system. For requirements to documentation, see Pt.4 Ch.9. A 400 Certification control and monitoring system 401 The following control and monitoring system shall be certified according to Pt.4 Ch.9: oil separating system fire detection system inert gas system. B. Assumptions B 100 Operational conditions 101 The classification of the facility will be based upon the following basic assumptions: that oily water and oil residues originating from oil with flash point below 60 C are considered to maintain

Pt.5 Ch.8 Sec.1 Page 5 a flash point below 60 C and that such liquids are not transferred to the facility's engine room, that transfer of oily water and oil residues between delivery vessel and the facility is only done under favourable weather conditions, that the facility is operated by qualified personnel, that a two-way communication system is provided between the delivery vessel and the facility during the transfer operation, ensuring reliable and direct contact with the personnel controlling the transfer pump. 102 The above basic assumptions will be stated in the Appendix to the Classification Certificate for the facility.

Pt.5 Ch.8 Sec.2 Page 6 SECTION 2 HULL STRUCTURES, PIPING ARRANGEMENT, SEPARATING SYSTEM AND FIRE PROTECTION A. Hull Strength and Arrangement A 100 General 101 In addition to the hull strength requirements of the rules for main class, the following shall be given special consideration: Additional openings in strength members. The local strength shall be considered in connection with openings and cut-outs in deck, bulkheads, etc. Loading conditions. The longitudinal strength shall be satisfactory for all relevant loading conditions and conditions during transfer to new location. In addition to a loading manual the facility is to be equipped with a loading instrument. Tank pressure. The local strength shall be considered for increased internal pressure in the tanks caused by the separating process. A 200 Fender arrangement 201 An efficient fender arrangement, effectively supported by hull strength members, is to be fitted. The fenders are to be able to keep the hulls of the delivery vessel and the reception facility apart at a safe distance, at least 3 metres. The fenders shall efficiently prevent steel to steel contact, in order to avoid risk for sparks. B. Arrangement for Transfer of Oily Water and Oil Residues B 100 Hose and transfer arrangement 101 The minimum bursting pressure for the hose assembly shall be 20 bar. The maximum allowable working pressure shall be at least 8 bar. 102 Hose diameters shall be sufficient for the maximum specified transfer rate for the facility in order to avoid excessive pressure drop. Hoses shall be suspended by suitable equipment. Excessive bending of the hoses shall be avoided. 103 A pressure gauge shall be fitted in the transfer line, before the reception tanks. 104 It shall be possible to drain or close mechanical loading arms or hoses before disconnection. Coamings of suitable height shall be arranged below manifolds and hose connections in order to minimize spill. B 200 Lighting 201 Deck lighting shall be arranged. Adequate illumination shall be provided: for the transfer area to facilitate control and handling of the equipment, for the fire extinguishing equipment, and for visual observation of possible oil in the processed water being discharged to the sea (see C104). C. Separating System C 100 General 101 The separating system shall be designed to reduce the oil content in the water being discharged into the sea to a concentration not exceeding 15 parts per million or any other lower value specified by the builder/ owner. The actual design performance will be stated in the Appendix to the Classification Certificate for the facility. 102 Precautions shall be taken to avoid overpressuring of the process tanks. When the separating system is arranged for pumping oil/water into a tank or series of tanks which by the design of the process piping arrangement will operate in the full condition, an overflow pipe with sectional area at least 25% greater than the area of the filling pipe shall be arranged from the first tank to another tank with surplus capacity. 103 Means for locating the oil/water interface in the tanks shall be provided. 104 Visual control of oil content in the processed water being discharged into the sea shall be possible by observing the sea surface at the outlet. Visual inspection of the surface in the last separating tank may

Pt.5 Ch.8 Sec.2 Page 7 alternatively be accepted. 105 Discharges of processed water from the separating process shall take place above waterline. 106 The maximum flow rate through the separating tanks shall be specified in the instruction manuals for the types of oil in question (different gravities, etc.). 107 Arrangements for handling and storage of sediments and separated oil residues shall comply with applicable requirements for cargo systems on oil tankers as given in Pt.5 Ch.3 of the rules. D. Oil Content Monitoring D 100 General 101 Automatic monitoring of oil content in the processed water shall be arranged. When the specified limit is exceeded, automatic stop of the discharge and an alarm shall be activated. 102 The oil content meter shall be type tested in accordance with relevant IMO specifications and guidelines (Res. A 393 (X) or revised version of same). 103 The oil content monitor shall be located outside gas dangerous spaces or zones unless the monitor is certified safe. E. Protection against Fire and Explosion E 100 General 101 Precautions shall be taken to prevent hydrocarbon gas from the delivery vessel to enter gas-safe spaces or zones on the facility and vice versa. The location and the periodical closing of doors and air intakes for ventilating systems, etc., shall be considered as well as the provision of air locks. 102 Means for preventing sparks from the funnel of the facility to reach gas dangerous spaces or zones (i.e. spark arrester) shall be provided. E 200 Fire protection, extinguishing and detecting systems 201 The fire protection, extinguishing and detection arrangements shall in general comply with the relevant requirements of SOLAS 74 for oil tankers. E 300 Foam system 301 A fixed deck foam system in accordance with Reg. 61 of Ch. II-2 of the 1981 Amendments to SOLAS 1974 shall be installed. E 400 Inert gas system 401 An inert gas system complying with the rules for the class notation INERT shall be arranged for supplying inert gas to all tanks which may contain hydrocarbon gases under normal operating conditions. 402 The capacity of the inert gas plant shall be at least 25% greater than the maximum discharge rate for processed water. E 500 Electrical installations in gas dangerous spaces and zones 501 Electrical installations shall comply with applicable requirements in Pt.5 Ch.3. E 600 Miscellaneous 601 Oil residues with flash point above 60 C originating from engine rooms may be transferred to tanks within the facility's engine room, and may be burnt or incinerated within the engine room.

Pt.5 Ch.8 Sec.3 Page 8 SECTION 3 OPERATIONAL INSTRUCTIONS AND LOG BOOK A. Instruction Materials A 100 Equipment and systems 101 Instruction manuals for the facility shall be prepared and kept onboard. The manuals are subject to approval by the Society. The manuals shall contain necessary information on: operation, maintenance, testing, identification of faults and repairs for the following equipment and systems: fire detection and extinguishing equipment, inert gas system, O 2 -content analyzer, oily water and oil residues transfer arrangement, oil content monitoring system, other equipment onboard necessary for a safe and pollution-free operation, the complete separating system, including possible limitations (pumping rates, types of oil, etc.). A 200 Procedures 201 The instruction manuals shall also contain relevant information about the operational procedures to be applied onboard, such as: mooring, safety actions (required closing of doors and ventilating intakes, etc.) to be carried out before commencing the transfer between the delivery vessel and the facility, general procedures for operation of the separating system and the inert gas system. 202 The operational procedures shall include the following: The O 2 -content of storage and separating tanks which are not completely filled, shall be checked upon discharge, and in any case at least twice a week. Two-way communication between the reception facility and the delivery vessel shall be established before the transfer commences. Before discharge into the sea is begun, visual inspection of the surface (see Sec.2 C104) shall be carried out and the automatic oil content monitor checked and started. 203 The maintenance procedures shall include: Intervals for checking and maintenance of the exhaust spark arresters. B. Safety and Oily Water/Oil Residues Log Book B 100 Log book contents and entries Guidance note: For the purpose of record keeping and for documentation versus local/national authorities it is recommended that the following guidelines are complied with: 1) General. The facility should be provided with a safety and oily water/oil residues log book. The officer in charge of the operations concerned should be responsible for the entries in the log book. The log book should be kept onboard available for inspection. The log book entries should be kept onboard for a period of at least three years. 2) Entries in the log book. The log book should be arranged for entries of the following which should be recorded without delay: - Before the transfer operations are commenced: - What will be transferred.

Pt.5 Ch.8 Sec.3 Page 9 - Stipulated pumping rate. - Total volume to be transferred. - Safety actions carried out. - Rate of transfer. - Total volume to be transferred. - Weather conditions during transfer. - Volume and the exact time when processed water is dis-charged into the sea. - Exact time when the oil content in the processed water being discharged into the sea exceeds the specified limit. - Internal transfer of oily water and oil residues. - Use of the inert gas plant. - Result and the exact time of checking O 2 -content in the tanks. - Inspection and testing of fire detection and extinguishing equipment. - Inspection and maintenance of the inert gas plant. - Inspection and maintenance of the exhaust spark arrester. - Inspection and maintenance of the transfer arrangement. - Inspection and maintenance of the oil content monitor. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e---