University of Minnesota Nano Center Standard Operating Procedure

Similar documents
Equipment Operating Procedure Glove Box

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

School of Chemistry SOP For Operation Of Glove Boxes

Standard Operating Procedure

Basic & Controlled Atmosphere Glove Boxes

Usage Policies Notebook for Trion RIE / ICP Dry Etch

University of MN, Minnesota Nano Center Standard Operating Procedure

Glove Box Installation Manual

Glove Box with Gas Purification System and Digital Control VGB-6. MTI Corporation

Usage Policies Notebook for Parylene Coating System

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

NTF-515. Operation Manual

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

OPERATION MANUAL NTF-15

Operating Procedures for Metal Evaporator I

Inert Air (N2) Systems Manual

OPERATION MANUAL NTF-60 Plus

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

MB-SP Series Solvent Purification System

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels

University of MN, Minnesota Nano Center Standard Operating Procedure

RH800 & 2000 BASIC OPERATIONS

Mass Spec will not Autotune

NGN Series nitrogen generator

Standard Operating Manual

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

5890II GC Standard Operating Procedure 9/2/2005

Manual Solvent Purification System. Innovative Technology, Inc.

Hazards associated with the gas system and how to mitigate them

NTF-230 OPERATION MANUAL

AX5000 Operational Manual

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

Arizona State University NanoFab XACTIX ETCHER. Rev A

Operating Instructions

March CS-1701F Reactive Ion Etcher

Precise Controlled Atmosphere Glove Boxes and Precise Basic Glove Boxes

What I have learned about SF 6 gas testing.a Practical explanation

DF-550E PROCESS ANALYSERS APPLICATIONS FEATURES

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

APPS-160 Gen 2 User Manual

Generating Calibration Gas Standards

SERIES 30. Spring Operated Tank Blanketing Valve PROTECTOSEAL.

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

Overview. Front Panel: Keypad and Display

Xactix XeF2 OPERATION MANUAL

SRL Series. Oil-less Scroll Air Compressors. Pharmaceutical. Research & Development. Food & Beverage. Chemical. Electronic

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

Birck Nanotechnology Center

Supplementary Operator s Manual 42/24-14 EN Rev. 3

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

STANDARD OPERATING PROCEDURES

OPERATOR S MANUAL Ar-Gone Weld Gas Analyzer

Plasma Asher: March PX-500 User guide (May-30, 2017)

Oerlikon Sputtering Evaporator SOP

Technical Information

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

THERMAL EVAPORATION UNIT (for Al evaporation)

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

Pressure Automated Calibration Equipment

Operating Procedures for the. SAMCO ICP RIE System

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

The HumiPyc ( Model 2) - Gas Pycnometer; Density, Moisture, Permeation Analyzer; Filter Integrity Tester; RH sensor Calibrator

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE

Propane Conversion Kit Instructions

E SC 412 Nanotechnology: Materials, Infrastructure, and Safety Wook Jun Nam The Pennsylvania State University

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE

Usage Policies Notebook for BMR HIDEP Low Temperature Plasma Enhanced CVD (LTPECVD)

ACV-10 Automatic Control Valve

TURBO OXYGEN NITROGEN PLANT

8.1 Calibration of gas sensors

7250 Sys. Ruska Multi-Range Pressure Calibration System. GE Sensing & Inspection Technologies. Features. Applications

Vacuum Insulated vertical cryogenic CO 2 & N 2 O Tanks

UNIVERSITY OF WATERLOO

Revised: June 7, 2017

Standard Operating Manual

Instructions for High Altitude Conversion

High Pressure Chem-SCAN Operating Manual

OXFORD PLASMALAB 80PLUS (CLOEY)

March Asher Operation

University of MN, Minnesota Nano Center Standard Operating Procedure

Draeger Fabius GS Pre-Use Check

Mitigation Starts With Design! Continues with Safe Operation, Mechanical Integrity and Training!

VACUUM & AIRLESS. Select from Kimble vacuum traps, manifolds, Schlenk tubes, adapters, and bubblers for your vacuum and airless glassware needs.

FPG8601 Force Balanced Piston Gauge

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition

Transcription:

University of Minnesota Nano Center Standard Operating Procedure Equipment Name: Controlled Atmosphere Glove Box Model: Labconco Protector Location: PAN 185 Badger Name: Not on Badger Revision Number: 1 Revisionist: J. Marti Last Revision Date: 8/04/2014 A. Introduction 1. Tool Description. The Labconco Protector Controlled Atmosphere Glove Box allows materials to be manipulated while isolated from oxygen and moisture. Starting with ambient air, the glove box uses a vacuum pump to purge its volume, and then fills the glove box with dry nitrogen gas form a cylinder. This process is repeated automatically for a programmed number of cycles. A level of <100 ppm of O 2 can be reached after about 75 purge-fill cycles. The glove box will typically be left filled with an inert atmosphere, so minimal pump down time should be required. Materials and tools may be introduced into the box using a load-lock, which removes the need to vent the box when adding or retrieving items. The system is equipped with an AtmosPure gas purifier that recirculates the glove box air and scavenges oxygen and water vapor to as low as 1 ppm. This system is engaged ONLY after oxygen and water levels in the box have reached 3000 ppm or below, using the automated purge/fill cycle of the main glove box. 2. Tool Components. Figure 1 shows a front view of the glove box. Key components visible in this view are a. Glove box body. The box is a stainless steel-lined single width chamber with two glove ports, large viewing window, and internal lighting. The chamber contains an AC power outlet and an internal door which opens to the load port. b. Transfer chamber. This load chamber can be vented and pumped down independently of the main chamber, so that equipment and tools may be passed into the main chamber without venting it. c. Vacuum pump d. Nitrogen cylinder e. AtmosPure Re-Gen gas purifier. This system recirculates the glove box atmosphere and scrubs oxygen and water from the gas. Using the Re-Gen purifier, it is possible to attain oxygen and H2O concentrations down to 1 ppm. f. Oxygen monitor. g. Water monitor. 3. Control panel. Figure 2 shows the front control panel menu to manage glove box operation. The panel display toggles between glove box pressure control, glove box purge and fill, and transfer chamber purge. The menus are selected using the upper right mode key on the front control panel. The function of these panels is discussed below. 1

Figure 1. Key components of the controlled atmosphere glove box. Glove box body Water monitor Oxygen monitor Transfer chamber Vacuum pump AtmosPure Re-Gen gas purifier Figure 2. Control panel display. This display toggles between glove box pressure control, glove box purge/fill, and transfer chamber purge/fill. 2

4. Safety. Although the glove box has been engineered to maintain optimum operator safety, caution should always be used while working. Prior to using the glove box, check to make sure that the main chamber pressure is set for comfortable glove manipulation. Changes in glove position will affect pressure in the glove box. 5. Restrictions/requirements. This product is NOT designed or intended to be explosion proof. It is the responsibility of the user to determine and avoid the lower explosive limits and flammability of the enclosed gases used within the controlled atmosphere glove box. If in doubt, consult with MNC staff. The use of flammable gases or solvents in the glove box should be limited. Care must be taken to ensure against the concentration buildup of flammable or explosive gases. The addition of oxygen inside the glove box (above the ambient concentration of 20%) must be avoided to prevent explosion, serious injury, or death. Perchloric acid use in this glove box is prohibited. Contact MNC staff if you plan to use hazardous materials in the glove box. Special venting connections will need to be in place prior to starting your project. Use good housekeeping in the glove box at all times. If you will be transferring liquids or powders inside the box, place Kimwipes or lab pads on your work surfaces to absorb any spills, and load extra wipes along with your materials at the start of your session. Remove these pads when done and discard. Do not use water or solvents to clean any surfaces. Contact lab staff in the event of a major spill. 6. Required Facilities. 120V AC power, dry nitrogen gas. 7. Definitions. a. Purge: pump-out of air inside the glove box, using the vacuum pump. The system purges the chamber down to a pressure 12.5 mbar (5 water) below atmospheric pressure. b. Fill: back-filling the purged glove box volume with dry nitrogen gas from the cylinder. The system fills the chamber to a pressure 12.5 mbar (5 water) above atmospheric pressure. c. Ambient/inert atmospheres: ambient atmosphere (room air) contains about 20% O2 by volume. An inert atmosphere may be defined as one where oxygen content has fallen below some critical threshold. For our purposes, an inert atmosphere is one having oxygen concentration at or below 0.3%, or 3000 ppm. d. ppm: parts per million. B. Using the Glove Box 1. Set Up. a. Begin a new entry on the Glove Box log sheet. List your name, the date, the material you are working with inside the box, the final O 2 and water concentrations measured at the end of your run (in ppm), and any issues you encountered during your run. b. Turn on the oxygen and water vapor monitors if not on already; the O 2 monitor 3

requires a warm up of about 5 minutes. When ready to start reading levels in the chamber, open the sampling valve located behind the monitor to allow real time gas monitoring. Because the monitor continuously withdrawals sample air, the valve should be closed after you are finished with the glove box, since leaving it open will gradually draw all the inert atmosphere out of the box. c. The box will usually be left with an inert atmosphere, that is, one having <3000 ppm (0.3 %) of oxygen or water. If the oxygen or water monitors indicate a higher level than this, you will need to do some purge/fill cycles to reduce these gas concentrations--see item 3 below. 2. Loading the Glove Box. To preserve the atmosphere inside the glove box, the transfer chamber is used to load items from the outside environment. a. Check to ensure that the inner transfer chamber door is closed and sealed. If not, close it and lock it with the locking handle. b. Check the position of the four manual valves on the front of the transfer chamber. Move all valves to the open position if not already open. c. Toggle the front panel display to bring up the transfer chamber pressure screen. The chamber should be at or near atmospheric pressure, given by a value of 0 +/- 3 mbar. If the chamber is under-pressured, use the fill key on the transfer chamber purge/fill menu to bring the pressure to ambient (i.e., a value of 0 ). d. Open the outer transfer chamber door and load your tools/materials, then close and lock the outer transfer chamber door. e. Use the front selector panel to bring up the transfer chamber purge/fill menu. Input a number of purge fill cycles to replace the air in the chamber with the dry N 2 atmosphere; 2-3 purge/fill cycles should be sufficient. Press Start to begin purging. f. After these cycles are complete, the inner transfer chamber door may be opened by reaching into the glove box. Retrieve and position your equipment and materials and close the inner transfer door. g. Close and lock the inner transfer door. h. Check the oxygen and water meters. The act of loading may have raised both oxygen and water vapor levels. Depending on your requirements, a pump down sequence for the main chamber may be necessary to reduce these gases. 3. Main Chamber purge/fill (pump down) sequence. To decrease the oxygen or water vapor levels in the box, do the following steps. a. Check the position of the four manual valves on the front of the transfer chamber. These valves are shown in Figure 3. Move all valves to the open position if not already open. b. Toggle the front panel display to bring up the glove box purge/fill screen. 4

Figure 3. Manual valves on the front of the transfer chamber. c. During a pump down, the glove box will automatically pump the box down to a pressure of 12.5 millibar (mbar) below ambient, then fill the chamber with dry nitrogen up to a pressure of 12.5 mb above ambient. This process is repeated for as many cycles as the user selects in this screen (1 to 199 cycles). Figure 4 shows a graph of the expected level of oxygen attained after a given number of purge/fill cycles. Figure 4. Oxygen concentration in the glove box after repeated purge/fill cycles. d. Consult Figure 4 to help select the number of purge/fill cycles that will bring the O 2 concentration down to 3000 ppm. Starting from atmospheric conditions (20% oxygen), about 40 cycles (taking about 40 minutes) will be needed. If starting at a lower level, fewer cycles should be used. e. After the purge/fill cycles have completed, verify that the levels of O 2 and H 2 O are 3000 ppm or lower. If not, run through 5-10 additional cycles. f. If you do not require levels lower than 3000 ppm, you may begin your work in the box. If lower levels are desired, go to Using the Gas Purifier below. NOTE: At the end of the purge/fill cycles, the glove box is usually over-pressurized, 5

and the gloves are fully inflated. This makes it impossible to insert your hands into the gloves. Use the purge key on the glove box pressure control panel to drop the pressure and pull the gloves inside the box to about -0.5 mbar. Adjust the pressure if needed during your session to ensure a comfortable position of the gloves. 4. Using the Gas Purifier. Very low levels of O 2 and H 2 O (down to 1 ppm) can be reached using the AtmosPure gas purifier, which recirculates the glove box atmosphere through a molecular sieve (to scrub water) and a chemical oxidation cell (to consume O 2 ). The gas purifier is to be used ONLY after the levels of O 2 and H 2 O have dropped to 3000 ppm or below. The front panel control is shown Figure 5. To engage the purifier: a. Turn on the main front panel switch on the AtmosPure. b. Switch the blower mode to on. c. Open both manual valves located on the right side of the unit. d. Monitor O 2 and H 2 O levels, which should start dropping soon after starting the purifier. Figure 5. Gas purifier front panel. 5. Glove box stability. The leak rate for the glove box is quite low. As shown in in Figure 6, the oxygen permeation rate is 0.30ppm/min. Depending on the length of your session, you may require additional purge/fills or use of the gas purifier to maintain your desired O 2 and H 2 O content. 6

Figure 6. Oxygen permeation rate into glove box. 6. Glove box Shutdown. When your work is complete: a. If using the gas purifier, close the manual valves on the right side of the purifier and turn it off. b. Check the transfer chamber pressure to ensure that it is close to that of the glove box (they should both read close to zero over- or underpressure). c. Open the inner transfer chamber door and move all your materials to the transfer chamber, along with clean up wipes and any equipment not approved by MNC staff to remain in the glove box. Ensure that the chamber surface has been cleaned of any material spills. d. Close and seal the inner chamber door. e. Retrieve your items by opening the outer transfer chamber door. Close and seal the door when through. f. Note the O 2 and H 2 O levels on the log sheet for the next user. g. Close the valve on the gas monitoring line, located behind the monitors. h. Shut down the O 2 and H 2 O monitors. 7