An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience

Similar documents
3.9 Marine Transportation

Oceanside Carlsbad. Solana Beach

3.9 Marine Transportation

Grays Harbor O&M and Deepening Dredging

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

Grays Harbor Federal Project

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

Cordova Harbor Page 2 of 9

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

Juneau Douglas Harbor

PORT OF SEATTLE TERMINAL 91 UNDERWATER REGRADING

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

HARBOR INFRASTRUCTURE INVENTORIES Lorain Harbor, Ohio

2013 FEDERAL STORM RESPONSE

AN OVERVIEW OF RECENT PROJECTS RELATED TO SAND BUDGETS, SOUTHERN CALIFORNIA BEACHES

Nome Harbor Page 2 of 12

KEYNOTE PRESENTATION FSBPA olsen

Ninilchik Harbor Page 2 of 11

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

R. Randall Center for Dredging Studies Texas A&M University

Assateague Island National Seashore North End Restoration Project Timeline

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

Intracoastal Waterway and other Federal Shallow Draft Inlets

Longshore Bar Creation: a viable option for seagrass restoration?

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Cat Island Chain Restoration

ADAPTATION TO SEA LEVEL RISE AND COASTAL IMPACTS

Unalaska Navigation Channel Improvements

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch

Juneau Aurora Harbor

LOCAL COASTAL PROGRAM UPDATE

Richards Bay Coal Terminal

Appendix C3. Cost Engineering

Hunters Point Naval Shipyard Environmental Remediation Program Overview

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

Assessment of Creosote-Treated Structures and Other Artificial Substrates in San Francisco Bay

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

David Revell, PhD And others. CSBPA Coastal Conditions 2018 Bodega Bay, CA

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc.

Sediment Management Plan Rehoboth Bay

Ketchikan Harbors Thomas Basin and Bar Point Harbor

PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY. MVD/Gulf Coast Regional Dredging Meeting November 5, 2013

Closure Plan for CCR Surface Impoundments

BIG RIVER COALITION RED RIVER VALLEY ASSOCIATION Sean M. Duffy, Sr. Executive Director

Estimated on-the-ground start and end dates: 1 June October 2018

AGENDA. Pinellas Assembly Update County Administrator (Videotape)

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

CHAPTER 281 INFLUENCE OF NEARSHORE HARDBOTTOM ON REGIONAL SEDIMENT TRANSPORT

Dare County Nourishment Project Town of Duck

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

3.3 OCEANOGRAPHY/COASTAL PROCESSES

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction SURF CITY AND NORTH TOPSAIL BEACH, NORTH CAROLINA.

Vieques Munitions Response: Current Issues

REAL ESTATE DEVELOPMENT LAW

AD-A II~lllII I I 7

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

CONSERVATION AND MANAGEMENT OF COASTAL WETLANDS IN CALIFORNIA

FINAL HARRIS CHAIN OF LAKES RESTORATION COUNCIL SITE VISIT SUMMARY. of the. Projects Tour March 3, 2006

14 NOISE AND VIBRATION

الاسكندريه مصر Tel Fax: (+2) Mob: (+2)

Project Update & Local Suppliers

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS

APPENDIX C. Fluvial and Tidal Hydraulics Report

Southwest Washington Littoral Drift Restoration Project: Design, Construction, and Monitoring

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling

SUBJECT: AMENDING PORT OF LOS ANGELES TARIFF NO. 4, SECTION THREE, ITEM NO CHARGES FOR PILOTAGE

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

SHOALING PREVENTION: AN ALTERNATIVE TO DREDGING

Innovative Technologies for a Resilient Marine Transportation System

Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report

National Oceanic and Atmospheric Administration (NOAA)/ Mulberry Phosphate Trustee Council September 12, 2013

Utilizing Vessel Based Mobile LiDAR & Bathymetry Survey Techniques for Survey of Four Southern California Breakwaters

Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift.

Coastal Erosion Impact on Rincón Infrastructure

EcoLogic Memorandum. TO: Ben Brezell; EDR FROM: Mark Arrigo RE: Possible Impacts of Dredging Snooks Pond DATE: 6/4/07

VENICE LOCAL COASTAL PROGRAM UPDATE: COASTAL HAZARDS WELCOME

ARTIFICIAL REEF CONSTRUCTION: AN ENGINEERED APPROACH. Timothy K. Blankenship, P.E. R. Harvey Sasso, P.E.

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers

BENEFIT-COST ANALYSIS OF HARBOR DREDGING ON THE GREAT LAKES

Appendix E Cat Island Borrow Area Analysis

TAC February 1, 2012 Prepared by Metro Bike Program

Members of the Board of Directors. Wendy Knowles, Clerk of the Board

Coastal and marine recreation in New England is ingrained in the region s economic and

AUTOMATIC DREDGING PROFILE AND CONTOUR CONTROL

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Follets Island Nearshore Beach Nourishment Project

Trusted Partners Delivering Value, Today and Tomorrow BUILDING STRONG

Transcription:

An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience AAPA/USACE Quality Partnership Initiative 4 th Annual Project Managers Workshop Port of Ponce, Puerto Rico December 1-4, 2008 Presented by: Steve Cappellino - Anchor Environmental CA L.P. Mo Chang USACE, Los Angeles District 1

Presentation Overview Project Background and Design Overview Partnership Strategy Cost Sharing Allocations Lessons Learned 2

Project Team USACE, Los Angeles District Construction Operations Project Management Regulatory Planning Engineering Legal 3

Project Team Cont. U.S. Navy Naval Base Ventura County Southwest Division Legal Planning Oxnard Harbor District Anchor Environmental LLC Everest International Consultants, Inc ilanco Environmental 4

5 Port Hueneme

Port Hueneme History Oxnard Harbor District (OHD) formed in 1937 with 322 acres Harbor constructed and operations began in 1940 Constructed harbor = not state lands U.S. Navy acquired harbor by paying off bonds in May, 1942 Navy agrees to lease 16 acres to OHD in 1947 commercial operations begin again 6

Current Uses Oxnard Harbor District (Port of Hueneme) Produce import/export RO/RO automobile imports U.S. Navy (Naval Base Ventura County) Construction Battalion Center Naval Surface Warfare Center Pacific Missile Test Range 7

Port Hueneme Joint Use Naval Base Ventura County Oxnard Harbor District 8

9

10

11

Challenges for Port Hueneme Federal Channel has accumulated ~200,000 meters of O&M material USACE has authority to deepen Federal Channel by ~1.5 meters None of the berths have been dredged in decades resulting in modified operations Contaminated sediments exist throughout Harbor 12

Port Hueneme Sediment Issues Naval Base Ventura County 13

Port Hueneme Sediment Issues Naval Base Ventura County Oxnard Harbor District 14

Port Hueneme Sediment Issues Naval Base Ventura County USACE Federal Channel Oxnard Harbor District 15

Sediment Contamination Total ~250,000 cubic meters Approximately 60% from berths/40% from Federal Channel COCs include PAHs, PCBs, DDT, TBT Mostly fine sands, silts and clays low organic carbon 16

Management Alternatives Landfill Disposal On-site near shore Confined Disposal Facility (CDF) Port fill site at POLA or POLB Contained Aquatic Disposal (CAD) 17

Management Alternatives Landfill Disposal On-site near shore Confined Disposal Facility (CDF) Port fill site at POLA or POLB Contained Aquatic Disposal (CAD) 18

Rationale for CAD Selection Provides on-site solution Not tied to other development or funding Environmentally protective Opportunities for beach nourishment Allows for Harbor deepening to advance Restores 100% use of Naval/OHD wharves Provides total solution for all 3 projects Shared resources = cost effective 19

Port Hueneme CAD Solution Naval Base Ventura County Target CAD Site (700 x 700 ) Oxnard Harbor District 20

Expected Construction Sequencing Step 1: Excavate Pit 21

Expected Construction Sequencing Step 1: Excavate Pit Beach Fill 22

Expected Construction Sequencing Step 2: Place Contaminated Sediment in Pit 23

Expected Construction Sequencing Step 3: Place Cap Material 24

Proposed CAD Cross-Section Existing Mudline -35 MLLW -42 MLLW Future Mudline Cap Layer -52 MLLW Contaminated Layer -83 MLLW 25

Challenges Funding Strategy Raising funds (total project ~ $15 million) Coordinating schedules Contractor negotiations and scheduling Opportunities All participants had some funds allocated for reduced individual projects Staff committed from the top down Significant project momentum 26

Cost Sharing Approach Break project into segments (e.g., CAD excavation, Navy wharves, cap armor placement, etc) Estimate costs associated with each segment Assign segments to participants based on either ownership or limitations in authority 27

Cost Sharing Approach Cont. Fine tune cost segments to accommodate secondary cost sharing strategies and funding schedules Can include financial balancing to make project more equitable among all partners Recognize previous agreements Account for contaminated sediment ownership allocation 28

Project Feature Responsibility USACE U.S.Navy OHD Project Development - CEQA/NEPA Permitting X X - Engineering Design X X Contracting - Contract Management X Construction - Equipment Mobilization X - CAD Cell Excavation X X - Dredging Navy Wharves X - Dredging OHD Wharves X - Dredging "Hotspots" within O&M Channel X - Capping X - Placing Rock Armor X X - Water Quality Monitoring X X X - Sediment Confirmational Sampling X X X - Construction Management X X X Post-Construction Activities - Long-Term Monitoring X X 29

Contracting Approach USACE has existing contract with Manson Construction for O&M dredging in Port Hueneme and Channel Islands Harbor Modification issued for additional work OHD/USACE Cost Sharing Agreement USACE/Navy Cost Sharing Agreement already in place for dredging 30

Contracting Approach Cont. OHD/Navy Agreement for CAD construction and long-term monitoring/liability All funds transferred to USACE for contracting and management 31

Project Schedule Conceptual design for project completed in April 2007 Design and permitting completed in August 2008 Construction will begin in December 2008 Estimated completion is June 2009 32

Lessons Learned Obtaining senior management approval early on is key Pre-negotiate the permit conditions during the design phase of the project Develop an accurate construction cost estimate early in the process Involve the lawyers sooner rather than later in the process 33

34 Questions?