McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

Similar documents
McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Welcome to the McKenzie Interchange Project Open House!

Frequently Asked Questions (FAQ)

Summary Report. Lower Lynn Improvements - Mountain Highway Interchange Public Information Sessions and Comment Period. February 21 March 11, 2017

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Governance and Priorities Committee Report For the July 2, 2015 Meeting

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Highway 1 Kamloops to Alberta Four-Laning Program

Why invest in the 1 Street S.W. Corridor?

Tonight is for you. Learn everything you can. Share all your ideas.

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Terwillegar Drive Expressway Draft Concept Plan

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Decision on North Waterloo Routing

122 Avenue: 107 Street to Fort Road

Technical Working Group November 15, 2017

PROJECT FACT SHEET March 21, 2018

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Hospital Link Project Project Update September 2017

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

PROJECT FACT SHEET May 25, 2018

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

ECONOMY PEOPLE ENVIRONMENT

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

George Massey Tunnel Replacement Project

Community Task Force November 15, 2017

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Transportation Master Plan Advisory Task Force

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

North Coast Corridor:

Standing Committee on Policy and Strategic Priorities

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018

Hospital Link Project Project Update November 2017

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

5. RUNNINGWAY GUIDELINES

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Sixth Line Development - Transit Facilities Plan

Bus rapid transit network

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Complete Streets. Designing Streets for Everyone. Sarnia

1. Provide a dedicated westbound approach bus lane at the intersection;

Southcote Road Improvements Class Environmental Assessment Study

Active Transportation Infrastructure Investment A Business Case

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Victoria Transit Priority Corridor Plan

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

Welcome to the Open House

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

102 Avenue Corridor Review

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Why do we need a Gondola?

PEDESTRIAN ACTION PLAN

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

George Massey Tunnel Replacement Project

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Durham Region Long Term Transit Strategy

Public Information Meeting

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Community Task Force March 14, 2018

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Changes to Traffic Circulation with Centrerunning

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Implementation Report # False Creek Bridges

Safe Routes to School Action Plan Aberdeen, Idaho

Scope of the Transit Priority Project

Traffic Control Inspection Checklist Segment:

Date: February 18, 2015 Page: 1 of 9. ICBC invests $1.195 million to improve Surrey, Delta & White Rock roads

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Public Event 1 Community Workshops

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

STONY PLAIN ROAD STREETSCAPE

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Pre-Plan Consultation Summary

Kelowna On the Move. Pedestrian and Bicycle Master Plan

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Part-time Shoulder Use Guide

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Transcription:

McKenzie Interchange Project Spring 2016 Comment Period Appendix 1: Display Boards and Feedback Form August 2016

Welcome to the McKenzie Interchange Project Information Session! Purpose of this Information Session To show you the selected project design announced on April 26, 2016, including: Transit, cycling and pedestrian connections Environmental mitigation strategies Noise mitigation Anticipated construction schedule and traffic management plans To seek feedback regarding any aspect of the project and how you would like to stay informed as the project moves into construction We Want to Hear From You Provide us with your feedback by: Completing a feedback form and leaving it with our team Filling out the online feedback form at by June 10, 2016 Sending an email to mckenzieinterchange@gov.bc.ca by June 10, 2016 An artist s rendering of the McKenzie Interchange Project The Province of B.C. and the Government of Canada are investing $85 million in the McKenzie Interchange Project, a new interchange on the Trans-Canada Highway at the intersection with Admirals Road and McKenzie Avenue in Saanich.

Project Need and Benefits The project is needed to improve safety, congestion and reliability The intersection has a collision rate almost three times the provincial average The number one bottleneck on Vancouver Island Unpredictable travel times affect transit service levels and commuters Project benefits will include: Reductions in frequency and severity of crashes Substantial travel time savings Improved transit facilities, including bus-on-shoulder lanes Improved travel time reliability Reductions in idling and fuel consumption, leading to significantly lower greenhouse gas emissions Improved cycling and pedestrian safety, by separating the Galloping Goose Trail from McKenzie Avenue Congestion on the Trans-Canada Highway For these reasons, the McKenzie Interchange Project was identified as a priority in B.C. on the Move, the Province of B.C. s ten-year transportation plan.

Public and Stakeholder Engagement Spring 2016 353 people attended an open house on February 24, 2016 and nearly 400 pieces of feedback were received. Summary of Key Feedback: Support for Option 2: Partial Cloverleaf Support for proposed transit, cycling and pedestrian facilities Support for proposed mitigation measures for Cuthbert Holmes Park Fall 2015 610 people attended an open house on November 17, 2015 and over 1,200 pieces of feedback were received. Summary of Key Feedback: Provide an interchange that operates efficiently Address congestion at the McKenzie and Burnside intersection Ensure the project accounts for future forecasted traffic Improve safety at the intersection Ensure good pedestrian and cycling connections Take a copy of the Fall 2015 or Spring 2016 Engagement Summary Report or read online at Ensure the project design accommodates and encourages transit use Protect Cuthbert Holmes Park and other environmental values Ensure solution incorporates current and future transit needs Address neighbourhood issues including short-cutting traffic Maintain traffic flow during construction

Selected Project Design: Partial Cloverleaf The partial cloverleaf option was selected as it: Is the safest, most efficient option and best meets the long-term needs of the region Substantial travel time savings Elimination of long queues on Highway 1 and McKenzie, eliminating shortcutting through neighbourhoods Elimination of long queues on Admirals Road northbound, enhancing local access to neighbourhoods Improved transit reliability and connections, encouraging increased transit use Reduced noise for neighbouring residents through lowering of Trans-Canada Highway and addition of noise walls Enhanced enjoyment and safety for Galloping Goose Trail users through grade separation and noise walls Reduced idling and fuel consumption, leading to lower greenhouse gas emissions Will reduce the frequency and severity of crashes Providing $30 million in safety benefits over the first 20 years, $4 million more than any other option Was the preferred option during Spring 2016 engagement, with 75% of respondents supporting the partial cloverleaf option Admirals Road Trans-Canada Highway To Victoria McKenzie Avenue

Selected Project Design: Partial Cloverleaf To Victoria Galloping Goose Trail Multi-use path McKenzie Avenue McKenzie Avenue facing south towards the Trans-Canada Highway

Selected Project Design: Partial Cloverleaf Multi-use overpass Trans-Canada Highway To Victoria Trans-Canada Highway facing east towards Victoria

Transit Facilities Bus-on-shoulder lanes to provide bus priority Transit stop locations, coordinated with cycling and pedestrian facilities Retaining a corridor for future LRT Alignment with BC Transit s Victoria Regional Transit System Transit Future Plan Bus stops with shelters will be provided, similar to those at other interchanges along the Trans-Canada Highway Bus Rapid Transit Traffic Lane Traffic Lane Bus-On- Shoulder Lane 1.3m 3.7m 3.7m 4.0m Median Curb The Trans-Canada Highway is identified as a future rapid transit corridor serving travel between the West Shore and downtown Victoria and the University of Victoria The project will support Bus Rapid Transit (BRT) facilities, as services are increased in the future Bus on shoulder lane and queue jumper priority lanes at ramp intersections will allow buses to bypass queues and provide more reliable service Attractive and fully accessible pedestrian connections to comfortable bus stops with shelters will be provided

Transit Facilities Transit buses will get priority at the traffic signals, resulting in improved transit travel times All stops will be fully accessible Stops will be well lit with shelters Bus-on-shoulder lanes on the highway All changes consistent with Victoria Regional Transit System Transit Future Plan Forms part of Transit Future Strategy to have RapidBus from Westshore to downtown Victoria

Pedestrian and Cycling Facilities Mix of sidewalks, multi-use pathways and shoulders Pedestrian and cycling connections coordinated with transit facilities Multi-Use Overpass Admirals Road

Pedestrian and Cycling Facilities Galloping Goose Trail will go over McKenzie, providing safe and secure access The trail will be widened to 5 metres throughout the project area with some sections widened to 6 metres Galloping Goose Trail overpass over McKenzie will be 5.6 metres wide New pedestrian and cycling overpass over the highway will be 4.1 metres wide Both overpasses will have security screening for safety of all users Gentle grades on pedestrian and cycling overpasses, not exceeding 4% Pedestrian and cycling facilities will be well lit for safety Traffic Lane Traffic Lane Westbound On Ramp Westbound On Ramp Galloping Goose Trail Galloping Goose Trail 1.3m 3.7m 3.7m 3.7m 3.7m 2.5m Median Curb Noise Wall Fence To McKenzie Avenue

Access to Schools Travel Routes and Ensuring Safety Multi-use path Pedestrian sidewalk Existing travel routes Shoulder bike lane Existing bus stops Planned 2018 bus stops Planned future bus stops Existing travel routes for students Future travel routes for students with the McKenzie Interchange Project Safety of students is a priority for the Ministry and we will continue to work closely with schools as the project advances New pedestrian and cycling routes will provide significant safety benefits for students as they will no longer need to walk along the shoulder of the Trans- Canada Highway or cross the highway at a traffic signal The Galloping Goose Trail will be widened, with lighting for safety; access points to schools will remain Routes to/from schools will have direct access to transit stops, as students are frequent transit users During construction, all cyclists and pedestrians, including students, will be kept away from construction activities Students currently walk along the shoulder of the Trans-Canada Highway

Noise Mitigation Noise walls can reduce noise in areas exposed to current or future high noise levels Raised portions of the Galloping Goose Trail act as a sound barrier, so no noise walls are required in these locations Dropping the Trans-Canada Highway under McKenzie/ Admirals reduces noise through the interchange Noise walls will typically be 3 metres high and made of concrete Noise walls will be placed on Ministry right-of-way Exact lengths, heights and locations will be finalized during detailed design An example of a noise wall at the Helmcken Interchange

Environmental Management The Ministry is committed to mitigating environmental impacts associated with this project An independent environmental assessment was undertaken by McElhanney Engineering (available online) Overview of Environmental Assessment Report: A high level overview environmental assessment was undertaken to identify environmentally sensitive features in and around the project footprint, and determine potential impacts, possible mitigation, and regulatory compliance requirements The environmental assessment was completed with information obtained from desktop studies, a field site visit and conceptual design drawings Potential environmental impacts include: temporary and permanent loss of vegetation and wildlife habitat within the project footprint, direct footprint impacts to a portion of a red-listed Garry Oak Arbutus ecosystem, and temporary disturbance of sensitive life stages (breeding) of wildlife and birds due to construction activities The report recommends the following mitigation, as described on other display boards: Implementation of standard construction best management practices to protect nearby water resources, fish and fish habitat Scheduling of particularly noisy construction activities outside the bird breeding season, in compliance with the Wildlife Act and the Migratory Birds Convention Act. Habitat offsetting through a 1:1 land area transfer to ensure no net loss of habitat area and amenities within Cuthbert Holmes Park Offsetting for loss of Garry Oak Arbutus ecosystem Construction mitigation strategies will be addressed in a project specific Construction Environment Management Plan developed by the contractor (see display board related to Construction Environment Management Plan)

McKenzie Interchange Project Environmental Management Plan Cuthbert Holmes Park The Ministry is working collaboratively with District of Saanich to mitigate impacts to Cuthbert Holmes Park and ensure consistency with the approved Cuthbert Holmes/Tillicum Park Management Plan 3m Park Trail Replacement Storm Water Management Area Tree Replanting Replacement Park Path Replacement of Park Property Current Park Boundary Limit of Construction Area to be Cleared of Invasive Species Replacement Park Path Potential Trembling Aspen Replacement Area Replacement Parking Area Park Info and Map Kiosk Revegetated Slopes Tree Replanting

Environmental Management Plan Garry Oak Ecosystem and School Properties Mitigation Measures Garry Oak Ecosystem: The Ministry of Transportation and Infrastructure is working with the Garry Oak Ecosystems Recovery Team to develop a mitigation plan to offset project impacts Mitigation Measures School Plantings: The Ministry of Transportation and Infrastructure is working with the schools and Habitat Acquisition Trust to establish new planting areas along the school properties

Stormwater Management Plan All road drainage within the project boundaries will be directed to the stormwater management pond Stormwater will go through a biofiltration process prior to release into Colquitz Creek Non-invasive plants will break down oil and grease and absorb heavy metals An example of a stormwater management pond

Construction Environmental Management Plan The Ministry will require the successful contractor to develop and implement a Construction Environmental Management Plan The plan will be prepared by a qualified professional and will: Describe the approach the contractor will take to address the environmental issues associated with construction of the project Address protection of key resources such as air quality, cultural resources, fish and fish habitat, environmentally sensitive areas, rare and endangered flora or fauna, soil handling, vegetation, water quality and quantity, and wildlife Outline management practices to minimize noise and vibration, including selection, operation and maintenance of equipment, contractor training, timing of activities, communications and complaint management Cuthbert Holmes Park

Minimizing Travel Delays During Construction Activity Construction of relocated Galloping Goose Trail prior to any change in vehicle traffic patterns Construction of ramps to carry all Trans-Canada Highway traffic and shift McKenzie; relocation of traffic to ramps and shifted McKenzie Excavation of Trans-Canada Highway and construction of overpass and highway Construct new north-south pedestrian overpass and decommission existing pedestrian overpass Anticipated Timing Late 2016/Spring 2017 Spring/Summer 2017 Late 2017/Spring 2018 Spring/Summer 2018 No traffic detours are expected until Spring 2017 The Ministry of Transportation and Infrastructure provides regular construction updates and advance notification of specific construction activities. Notification would be provided through social media, DriveBC website (www.drivebc.ca) and changeable message signs.

Next Steps Finalize partial cloverleaf design details considering input from this engagement period and from other stakeholder groups and First Nations Prepare and tender first construction contract this summer which will include relocation of the Galloping Goose Trail, preloading and relocation of the Capital Regional District water main Prepare and tender second construction contract in Spring 2017 which includes all remaining works Thank You for Coming! Please remember to provide us with your feedback by: Completing a feedback form and leaving it with our team Filling out the online feedback form at by June 10, 2016 Sending an email to mckenzieinterchange@gov.bc.ca by June 10, 2016 WE ARE HERE Detailed Design Announcement of Federal and Provincial Project Funding July 2015 Conceptual Design Engagement November December 2015 Functional Design Engagement Spring 2016 Spring/ Summer 2016 Construction Start Late 2016 Project Completion Late 2018

The McKenzie Interchange Project is a new interchange on the Trans-Canada Highway at the intersection with Admirals Road and McKenzie Avenue in Saanich. The intersection is the number one bottleneck in the province outside of the Lower Mainland. The McKenzie Interchange Project will improve traffic flow of passenger, transit and goods movement vehicles and reduce collisions and congestion-related impacts to the economy, environment and public health. Construction of the project will begin in Fall 2016. No changes to traffic patterns are anticipated to occur until Spring 2017. We Want to Keep You Informed The Ministry of Transportation and Infrastructure provides regular construction updates and advance notification of specific construction activities through social media, the DriveBC website (www.drivebc.ca) and roadside changeable message signs. We want to know how you want to stay up-to-date on upcoming construction activities and traffic pattern changes. Please provide your feedback by June 10, 2016. Feedback Form 1. Please indicate how likely you would be to use each of the following channels to get updates about construction activities and traffic pattern changes for the McKenzie Interchange Project: Very Likely Somewhat Likely Not Very Likely Very Unlikely DriveBC website (www.drivebc.ca) Project website () Email Updates (sign-up required through project website) Newspaper Advertisements Radio Advertisements Roadside Changeable Message Signs Social media (Twitter, Facebook) 1 McKenzie Interchange Project Feedback Form

2. Please provide any additional comments you may have regarding any aspect of the McKenzie Interchange Project: Privacy Policy Personal information collected through this survey will inform the McKenzie Interchange Project under the authority of s.26 of the Freedom of Information and Protection of Privacy Act. If you have any questions about the collection, use and disclosure of your personal information, please contact: David Hume Executive Director, Citizen Engagement PO BOX 9029, STN PROV GOV Victoria BC V8V 9L9 Ph: 250 589-9043 McKenzie Interchange Project Feedback Form 2