WSDOT s Main Street Highways Initiative

Similar documents
Performance measures for nonmotorized

Creating Livable Streets and Corridors (S526) Harrison Rue, ICF International APA Conference, Los Angeles April 16, 2012

Outline. Safe Routes to School and Community Planning. School Basics. School Basics 1/12/2014

Access Management Regulations and Standards

C C C

Designing Complete Streets: What you need to know

Road Diets FDOT Process

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Access Location, Spacing, Turn Lanes, and Medians

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.

Access Management Regulations and Standards

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

What Is a Complete Street?

In November 2015, the City of Bellingham, WA, USA completed $4.3 million in safety

Citywide Sidewalk and Crosswalk Programs

City of Jacksonville Mobility Fee Update

Street Paving and Sidewalk Policy

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Lisa Quinn Executive Director

Building Great Neighbourhoods LANSDOWNE

Does It Work? THE BENCHMARKING PROJECT. State Department of Transportation Project Assessment. Bill Wilkinson and Bob Chauncey

Services and Funding from WSDOT Local Programs

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Omaha s Complete Streets Policy

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Balancing Highway Speeds and Community Needs

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Linking Transportation and Health in Nashville & Middle Tennessee

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Pedestrian Safety at Roundabouts. Presentation to the Howard-Suamico School Board November 26, 2007

Citizen Advisory Committee (CAC) Meeting #5 West Anaheim Youth January 27, 2016

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan

ADA Retrofits Triggered by Paving: What, When, and Why

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia

Overview. Existing Conditions. Corridor Description. Assessment

Access Management in the Vicinity of Intersections

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Building Great Neighbourhoods QUEEN ALEXANDRA

Highway Project Scoring Worksheet Project Name: Ike Brooks Rd/Rives Chapel Church Rd Improvements (SPOT ID: H090571)

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Pedestrian Safety at Interchanges

Multimodal Through Corridors and Placemaking Corridors

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

Driveway Design Criteria

TRAFFIC CALMING POLICY & PROCEDURES

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

MARTIN LUTHER KING JR. WAY

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

STANLEY STREET December 19, 2017

Project Description Form 8AA

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

City of San Diego Vision Zero Draft Strategic Plan FY 2017

INDEX. Geometric Design Guide for Canadian Roads INDEX

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

Perryville TOD and Greenway Plan

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Project Description Form 8EE

Rightsizing Streets: The Seattle Experience

LOUISIANA COMPLETE STREETS POLICY. Ellen W. Soll, AICP Principal Soll Planning

Fleur Drive Reconstruction

Report. Typical Sections. City of Middleton, WI

DANGEROUS BY DESIGN WISCONSIN. Solving the Epidemic of Preventable Pedestrian Deaths (And Making Great Neighborhoods)

Design Considerations for Complete Streets. The Kiewit Center for Infrastructure and Transportation

Retrofitting Urban Arterials into Complete Streets

Chapter 4: Funding and Implementation

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

LANE ELIMINATION PROJECTS

SCHOOL CROSSING PROTECTION CRITERIA

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Town of Orangetown Neighborhood Traffic Calming Program

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

10.0 CURB EXTENSIONS GUIDELINE

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

Cycle Track Design Best Practices Cycle Track Sections

BIKE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT. November 2006

Complete Streets 101: The Basics

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Section 7 Complete Green Street Guidelines DRAFT

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

NEIGHBORHOOD TRAFFIC CALMING POLICY

Transcription:

WSDOT s Main Street Highways Initiative Paula Reeves, AICP CTP WSDOT Highways and Local Programs Reconnecting America Webinar October 16 th, 2013

WSDOT s Local Programs Division We provide educational, technical, and financial support with federal oversight to local customers to help them achieve their transportation goals We are stewards of federal transportation funding We provide technical expertise and services related to federal and state requirements. We promote cooperative planning and partnerships.

Summary of the Research: State Highways as Main Streets: A Study of Community Design Some State Highways in Washington serve as main streets providing local access as well as regional mobility Design affects community livability and safety: these roads have the highest rates of pedestrian and traffic collisions in the state. Late stage design changes in projects on these highways have increased costs and delayed projects. SR 203 Carnation WA Visualization by SVR Design

The Research System Analysis Case Studies Storefront Studio Program University of Washington College of Built Environments Department of Architecture

Variables What s a Main Street Highway? Step 1: Screening State Route within City Limits Y, N Highway of Statewide Significance Y, N National Highway System Y, N State Access Control Classification Y, N Federal Functional Classification Design Speed Posted Speed Year of Incorporation Freight Classification Collision History Units of Measure Principal arterials, Minor arterial streets, Collector streets, Local streets MPH MPH Year T-1 more than 10 million tons per year; T-2 4 million to 10 million tons per year; T-3 300,000 to 4 million tons per year; T-4 100,000 to 300,000 tons per year; T-5 at least 20,000 tons in 60 days Number of collisions involving bicyclists and pedestrians

Step 2 Defining Main Street Highways Variables Units of Measure Proportion of visible buildings that are commercial Percentage (25%, 50%, 75%, 100%) Proportion of street frontage with dead space Percentage (25%, 50%, 75%, 100%) Proportion of street frontage with parked cars Percentage (25%, 50%, 75%, 100%) Proportion of street frontage with tree canopy Percentage (25%, 50%, 75%, 100%) Number of travel lanes Number both directions Average travel lane width Feet Average shoulder width Feet Average median width Feet Average sidewalk width Feet Total curb to curb width Feet Total back of sidewalk to back of sidewalk width Feet Posted speed limit MPH Crosswalk spacing Feet Visible curb extensions (y, n) Y,N Average building setback Feet Average building height (stories) Stories Uniform building height (y, n)) Y,N Number of pedestrians visible Count Average daily traffic Volume Visible bicycle lane Y,N Visible buildings that are historic Y,N

Why Define Main Street Highways? Ensure a measurable link between goals and transportation investments --Outcomes vs. throughput or volume to capacity ratio Develop the most cost effective transportation projects --Ensure fewer scope and schedule changes Identify partnerships opportunities and resources. --Transportation, historic preservation, environmental, economic development, utilities, etc..

Research Findings Scope changes: -- More common on Main Street Highways -- 48% of all projects vs. 38% on other parts of the state system Retrospective review: -- 40 projects or 20% of WSDOT s scope, schedule and budget changes could have directly benefited from additional community design before projects were scoped Average possible cost avoidance per project: -- Estimated at over $9 million dollars or 30% of project cost

Main Street Highways Safety and Livability WSDOT s Gray Notebook December 2012

Implementing the Research Complete Streets Act (2011 Washington Legislation ESHB 1071) New Design Approach (2012 Washington Legislation HB 1700) State Route 14 Bingen State Route 12 Morton

Raising Awareness about Complete Streets Source: Association of Washington Cities

Better Coordination - Design & Traffic Operations RCW 47.24.020 When city streets also operate as state highways within the corporate limits of cities and towns, the city has full responsibility for and control over any facilities beyond the curbs and, if no curb is installed, beyond that portion of the highway used for highway purposes. City Responsibility

WSDOT Resources State Highways as Main Streets: A Study of Community Design and Visioning Publications http://www.wsdot.wa.gov/research/reports/700/733.1.htm Contacts: Paula Reeves Manager, Community Design WSDOT Highways and Local Programs Reevesp@wsdot.wa.gov, 360-705-7258 http://www.wsdot.wa.gov/localprograms/planning UW Storefront Studio http://www.storefrontstudio.org/