B741 - TEMPORARY CONCRETE BARRIERS - OPSS 741

Similar documents
B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

Traffic Management Guidelines for Structure Rehabilitation Projects

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

Accommodating Pedestrians in the Work Zone

ADA on Construction. Guidance for Section C Plan Preparers

Design Criteria. Design Criteria

SMART STEEL CRASH CUSHION

Driveway Design Criteria

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

CHAPTER 1 STANDARD PRACTICES

MNDOT PAVEMENT DESIGN MANUAL

Plan prepared for: Brennan Paving and Construction. Plan prepared by: Direct Traffic Management

FOR HISTORICAL REFERENCE ONLY

Manual Of Standard Traffic Signs And Pavement Markings Alberta

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

COMPLETE STREETS DURING CONSTRUCTION

Traffic Control Inspection Checklist Segment:

Errata Date February 2016 Errata Edition Field. Ontario Traffic Manual Book 7 Field Edition (FE) - ERRATA

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

General Notes. Project No /15/2018 Page 1 of 1

South Carolina Department of Transportation. Engineering Directive

GDOT Cross Section Elements. Course ID: GDOT PDH Credits

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Temporary Vehicle Restraint System Policy

Clear Zone Conflicts in AASHTO Publications

Restoration Requirements

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

On Road Bikeways Part 1: Bicycle Lane Design

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Appendix C. Bicycle Route Signage

H3 Roadside Design Process

SECTION TRAFFIC REGULATIONS

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

SECTION 3 STREET DESIGN

(This page left intentionally blank)

General Notes. Project No /15/2018 Page 1 of 1

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

10.0 CURB EXTENSIONS GUIDELINE

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Chapter 17. Work Zone Management. 17 Work Zone Management

DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:

Temporary Traffic Control for Highway Work Zones

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

ITEMIZED LIST FOR TRAFFIC CONTROL TOTAL UNITS S

ASSET ASSET IDENTIFICATION SIGNAGE

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

H3 Roadside Design Process

Route 47 (North Main Street) Reconstruction

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

SECTION 12 ROAD MARKINGS AND DELINEATION

Long Island Rail Road Expansion Project Floral Park to Hicksville

Bases, Ballasts, and Paving

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

2.0 LANE WIDTHS GUIDELINE

2017 Temporary traffic control guidelines for pedestrians. v.2

Access Management Standards

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

STATEMENT of POLICY and PROCEDURE

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

TRAFFIC ACCOMMODATION IN WORK ZONES

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 6H. TYPICAL APPLICATIONS

General References Definitions. (1) Design Guidance. (2) Supporting Information

Off-Road Facilities Part 1: Shared Use Path Design

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

Work Zone Traffic Safety

24,801 Roadway Departure Fatalities Nationally. The Safety Edge : Minimizing The Effects of Shoulder Drop-off. 41,059 Highway Fatalities a Year

PART 5. TRAFFIC CONTROL DEVICES FOR LOW-VOLUME ROADS TABLE OF CONTENTS

Roadway Design Manual

SECTION 12 ROAD MARKINGS AND DELINEATION

APPENDIX L. Design Criteria

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN

Hospital Link Project Project Update November 2017

CONSTRUCTION SPECIFICATION

TRAFFIC CONTROL DEVICES

Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects

Transcription:

B741 - - OPSS 741 741.1 GENERAL Temporary concrete barrier (TCB) is a portable barrier system consisting of freestanding precast concrete segments that are positively connected together to form a continuous barrier system. Policies and descriptions for the various types of TCB systems accepted for use and specified on provincial highway projects are provided in the Roadside Design Manual. The systems are designed and crash tested for placement on paved surfaces, and paved surfaces should extend at least one metre beyond the back of unrestrained TCB systems. 741.1.1 TCB Restraint Systems TCBs are often used to provide separation between traffic and work zones, or at the edge of bridge decks. In locations where the offset from back of TCB to edge of excavation, edge of structure, scaffolding, temporary protection (support) system or sign support is less than one metre, it may be necessary to restrain the barrier to minimize deflection. Restraining details have been successfully crash tested to NCHRP Report 350 TL-3 for the Type M TCB. The three restraint systems acceptable for use in MTO contracts include the following: 1) Pinning to asphalt pavement (or concrete); 2) Strapping to concrete pavement or bridge deck (with or without asphalt overlay); 3) Bolting through concrete bridge deck (with or without asphalt overlay) Only the TCB Type M connection should be used with restraint systems. Unrestrained TCB should be transitioned to restrained TCB as shown on the applicable OPSD. Similarly, unrestrained TCB should be transitioned to permanent concrete barrier as shown on the applicable OPSD. The three TCB Restraint System tender items cover only the supply, installation, and removal of the restraint system. Temporary Concrete Barrier and Temporary Concrete Barrier, Relocation tender items are computed separately. Designers should refer to Roadside Design Manual for guidance on when to restrain TCB. January 2018 Page 1 of 5 CDED B741

741.1.1 TCB, Reduced Deflection System In locations where the offset from back of TCB to edge of excavation, edge of structure, scaffolding, temporary protection (support) system or sign support is less than one metre, the reduced deflection TCB may be used instead of the restrained system. The Type X TCB does not require any restraint systems and has been successfully crash tested to NCHRP Report 350 TL-3 and AASHTO MASH TL-3. Only the Type X TCB should be used for reduced deflection TCB and transitions to freestanding TCB as shown on the applicable MTODs. 741.2 REFERENCES Roadside Design Manual 741.3 TENDER ITEMS Temporary Concrete Barrier Temporary Concrete Barrier, Relocation Temporary Concrete Barrier, Drainage Gap Temporary Concrete Barrier Restraint System, Pinned Temporary Concrete Barrier Restraint System, Strapped Temporary Concrete Barrier Restraint System, Bolted Temporary Concrete Barrier, Reduced Deflection Temporary Concrete Barrier, Reduced Deflection, Relocation (Normal, each, PQP) The tender item "Temporary Concrete Barrier" is used for the following work: a) Supplying and transporting the barriers to the site; b) The initial installation and including any additional barriers required for subsequent staging; and c) Removal of barriers after construction has been completed. The tender item "Temporary Concrete Barrier, Relocation" is used for the following work: a) Relocating the barriers within the work area as required for staging or seasonal shutdown for carryover projects; and b) The temporary storage of barriers at the site or other designated locations as necessitated by staging or seasonal shutdown for carryover projects. January 2018 Page 2 of 5 CDED B741

741.4 SPECIFICATIONS The requirements for TCBs and TCB restraint systems are contained in OPSS 741. 741.5 SPECIAL PROVISIONS Refer to Chapter 'E' of this Manual to review the applicable standard special provisions. Non-standard special provisions are required to specify and provide payment for: TCB that is to remain on a project upon its completion; The identification of specific temporary storage sites for TCB that cannot be accommodated within the project limits during staging or seasonal shutdown on carryover projects; and Restoration of asphalt and concrete surfaces that are disturbed during the installation and removal of TCB restraint systems. 741.6 STANDARD DRAWINGS Applicable standard drawings are contained in the 900 series of the Ontario Provincial Standards Drawings (OPSD) and 900 series of the Ministry of Transportation Ontario Drawings (MTOD). 741.7 DESIGN TCB should be used on a paved surface, such as asphalt or concrete. TCB drainage gaps should only be used when justified based on the results of a hydraulic analysis. Prior to the 60% completion stage of detail design, the designer should send to the Ministry s Design and Contract Standards Office and Bridge Office the proposed location and quantity of TCB restraint systems along with a typical section(s) showing lane widths, shoulder widths, and offset of the TCB to edge of the excavation or structure. In constrained areas where it is necessary to reduce the width of the level area behind the TCB to the upper edge of each wall of an excavation or temporary protection (support) system to less than one metre, an Engineer shall design and provide January 2018 Page 3 of 5 CDED B741

documentation according to the Policies in the Roadside Design Manual, for use during construction according to Ontario Regulation 213/91. 741.8 COMPUTATION These are Plan Quantity Payment items. Quantities are computed in metres. Measurements are scaled or measured along the centreline of each installation. The unit of measurement for TCB drainage gaps is each complete installation. Transitions from restrained TCB to unrestrained TCB are included in the computed length for the appropriate TCB restraint system. Transitions from reduced deflection TCB to unrestrained TCB are included in the computed length for reduced deflection TCB. When a transition from unrestrained TCB to permanent concrete barrier is included in the contract, the length of the transition is included in the computed length for the appropriate TCB restraint system. 741.9 DOCUMENTATION TCBs are depicted on the contract drawings with the designation TCB or TCB Relocation shown adjacent to the symbol. Detail the station and offset for the start and end of each change in direction and/or offset of TCB. Show the locations of the TCB drainage gaps on the contract drawings with the OPSD reference and station shown adjacent to the symbol. Temporary Concrete Barrier - This item pays for the supply of the precast units, the total cannot exceed the largest number of units in place at any one time during the contract. Measurement is from end to end of all locations, restrained and unrestrained. Temporary Concrete Barrier, Relocation - This item will be comprised of all relocations during the contract. Measurement is from end to end of each individual relocation. Temporary concrete barrier lengths, temporary concrete barrier, relocation lengths, temporary concrete barrier, reduced deflection lengths, and temporary concrete barrier, reduced deflection, relocation lengths are computed and entered on the Quantities-Miscellaneous" sheets, showing station to station and location, left or January 2018 Page 4 of 5 CDED B741

right of centreline. Provide offsets if required. For contracts that include multiple construction stages, the quantities shall be broken down by each individual stage. Enter each TCB drainage gap installation in the Quantities Miscellaneous sheets as a separate line entry under the appropriate column heading showing station and location, left or right of centreline. Provide offsets if required. For contracts that include multiple construction stages, the quantities shall be broken down by each individual stage. TCB restraint system locations are depicted on the contract drawings with the appropriate OPSD number shown adjacent to the symbol. The limits of restraint shall be clearly indicated. The applicable standard drawings shall be included in the contract. TCB restraint system lengths are computed and entered on the Quantities- Miscellaneous" sheets under the appropriate column heading, showing station to station and location, left or right of centreline. Provide offsets if required. Total each column and transfer the tender totals to the tender document. For contracts that include multiple construction stages, the quantities shall be broken down by each individual stage. Reduced deflection TCB system lengths are depicted on the contract drawings with the designation TCB-RD shown adjacent to the TCB symbol. The minimum 32 m long transitions required on each end of the TCB-RD system are depicted with the designation TCB-RD-T shown adjacent to the TCB symbol. Detail the station and offset for the start and end of each change in direction and/or offset of TCB-RD and TCB-RD-T. 741.9.3 Documentation Accuracy Station and quantity entries are recorded to the nearest whole metre. Offsets when required are recorded to 0.1 of a metre. Spot checking required. January 2018 Page 5 of 5 CDED B741