CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Similar documents
Contractor / Exhibitor Handbook

OFFICE OF STATE HUMAN RESOURCES

Contractor handbook. Purpose

2.0 Management Systems and Documentation

Temporary load-bearing support for structural alterations or repairs

How severely could the risk hurt someone? Low/Insignificant First aid

PERSONAL PROTECTIVE EQUIPMENT

Safe Work Method Statement

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Safe Work Method Statement (SWMS)

Risk Assessment. Appendix A contains

Safe Work Method Statement

Code of Practice and Instructions to Contractors Working for Viridor

Permit-To-Work Guidance and Templates

techconnect CARPENTRY Objectives Unit 2 Workplace Safety TechConnect - STUDENT WORKBOOK 2-1 Workplace Safety - Unit 2

CONTRACTOR SAFETY RULES

TABLE OF CONTENTS PART 11 - FIREFIGHTING

C-Consequence, P Probability, R-Risk Rating Value Page 2 of 2

Risk Controls Proposed: (in hierarchy order from the most preferred control)

Hautbois Risk Assessment

Safety at Work. Rules for Staying Alive

POWER DELIVERY. Contractor Health & Safety General Terms and Conditions. Appendix B Personal Protective Equipment

Northern Kentucky University Issue Date: 11/02/2018 Revised Date: Title: PERSONAL PROTECTIVE EQUIPMENT PROCEDURE OBJECTIVE AND PURPOSE

How severely could the risk hurt someone? Low/Insignificant First aid

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Health & Safety Contractor rules

Leicester City Council Health & Safety Risk Assessment Form Ref:

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD

Safe Work Procedure for installation of external cladding

How severely could the risk hurt someone? Low/Insignificant First aid

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

How severely could the risk hurt someone?

BHC-P-07.2 Health Hazards in Construction

Title: Plant and Equipment Risk Management Form Issue Date: Review Date: Page Number: 1 of 11

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE PLAN Kenyon College

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

Personal Protective Equipment 29 CFR 1926

JOB HAZARD ANALYSIS FOR PPE

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A.

CLUB RISK ASSESSMENT TEMPLATE

Conducting An Effective. Welcome!

SAFE WORK METHOD STATEMENT Part B

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

Safe Work Method Statement

Mobile Training Unit (MTU)

Environmental Health & Safety Policy Manual

Risk Assessment Form (Qualitative)

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

RISK INFORMATION SCHOOLS SCHOOL GROUNDS MAINTENANCE

CONTRACTOR SAFETY INDUCTION HANDBOOK

Course Title: Industrial Safety in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type

ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT HAZARD ASSESSMENT AND CERTIFICATION GUIDELINES

WHS CONTRACTOR INFORMATION PACKAGE

Job Hazard Analysis Analysis by:

TRADE AREA: ELECTRICAL INDUSTRY

in Australian Workplaces

14. Personal Protection Chapter , WAC

Safe work method statements


Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Prevention of Falls and Working at Heights

S31 Opening Statement Working at Height

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Personal Protective Equipment. Individual Unit Function: Safety Procedure No.: SOP-0147 Page: 1 of 9

SAFETY TRAINING LEAFLET 02 BASIC RULES FOR SAFETY AND GOOD HOUSEKEEPING

Bogo Operations Pollution Incident Response Management Plan

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

In an emergency the safety of all personnel and the public is of priority.

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

University of Vermont Department of Physical Plant Personal Protective Equipment Program

MATERIAL SAFETY DATA SHEET WALNUT SHELL GRIT. Abrasive Blasting Service & Supplies Pty Ltd (ABSS) 18 Beckett Avenue, Keilor East, Vic 3033

Identify, evaluate and assess workplace improvements to reduce hazards. Provide personal protective equipment based on hazard assessment

Work Activity (e.g. Road Work): Work Location:.

Recognition, Evaluation, and Control of Hazards

Safety Risk Assessment Roofing Works / Surveying / Inspections

Appendix C Health and Safety Guidelines for investigators

OSHA Federal Standards October 1, 2016 September 30, 2017

Compliance Requirements

Print this activity then complete it and keep it as evidence in your folder, or portfolio.

Working safely in an engineering environment

Chairman: Doctor: Ambulance: Secretary: Gardai: Other: The Club will comply with Schedule 3 of the Safety, Health and Welfare at Work Act 2005 by:

HEALTH & SAFETY HANDBOOK. Venues/HSE/08/16

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

SAFETY MANAGEMENT SYSTEM

University College Dublin Machinery/Equipment Risk Assessment Template

Safe Work Method Statement

Contractor Hazard Identification and Control Guide

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

OSHA Compliance Saves Money, See How They Are Connected. Ryan S. Hellman, MS Principal EHS Consultant

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

TOOL BOX TALK NO3. Use of P.P.E

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

75 Years of Health and Safety Guidance

2012 NFPA 70E: Electrical Safety In The Workplace

B S Glass Ltd Safety procedures- outsourced Workplaces

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

A Checklist for a Health and Safety Risk Assessment

Transcription:

RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16

All ladders to be placed on level surface R1 All aluminium ladders to have rubber feet All ladders to be in a well maintained state Ladder can slip and fall over/ User can fall from a ladder leading to injuries and damage All ladders must be secured and stabilised before and during use All persons working at a height must have a valid Certificate of Fitness 2 2 5 Where practical, a tower scaffold must be used instead of a ladder Wear appropriate PPE; safety shoes, safety harness e.t.c. Ensure that harness hooking points are suitable to carry required weight No working from ladders during inclement weather Project Risk Assessment Page 2 of 16

All persons working at heights must have valid Certificates of Fitness R2 All persons working at height must have valid Working at Height training Working on/ in elevated surfaces People and tools fall from elevated height leading to injuries and damages Appropriate PPE No work may be done if the surface is wet Ensure there is enough light in the work area 2 2 5 Ensure all tools being used are properly secured Where practical, a tower scaffold must be used instead of a ladder Scaffold must be erected as per the relevant SANS Code R3 Working from a scaffold Scaffold collapse causing injuries and property damage Only qualified persons may erect scaffold All scaffolds must be formally inspected and signed off as Safe for use before work may commence 1 4 10 Persons working from scaffold must be trained in the proper use of scaffolds Project Risk Assessment Page 3 of 16

All persons working at heights must have valid Medical Certificates of Fitness R4 Appropriate PPE must be used Use scaffold only for its intended purpose Contractor/ client to engage with occupants regarding scaffold safety Persons/ tools falling from scaffold All persons working at height must have valid Working at Height training 1 3 6 Secure all tools being used No scaffold work is allowed during inclement weather Persons working from scaffold must be trained in the proper use of scaffolds Barricade a one meter safe area around the base of the scaffold Project Risk Assessment Page 4 of 16

All persons working at heights must have valid Medical Certificates of Fitness R5 Appropriate PPE must be used Use MEWPs only for its intended purpose Working from a sky-jack and other Mechanically Elevated Work Platforms (MEWP) Contractor/ client to engage with occupants regarding MEWP safety All persons working at height must have valid Working at Height training 1 3 6 Secure all tools being used No MEWP work is allowed during inclement weather Barricade a one meter safe area around the base of the MEWP Working with power tools e.g. angle grinders, drills, lawn mowers, and hand tools High noise levels Noise Induced Hearing Loss Appropriate hearing protection must be warn during all activities where people are exposed to noise levels above 85dB R6 2 2 5 Project Risk Assessment Page 5 of 16

Air born particles Eye injuries and arc-eyes Wear appropriate eye protection Ensure all machine guarding is all in place R7 2 3 9 Inhalation of dust Wear appropriate dust mask R8 2 2 5 Skin lacerations and burns Wear appropriate clothing and gloves Ensure machine guarding is all in place R9 2 1 2 All tools to be in a good state of repair R10 Electricity Electric shock All tools must be registered and inspected at the start of the work shift and record must be kept 1 4 10 All electrical wiring must be in good repair Do not work with electrical tools in wet or unsuitable conditions Project Risk Assessment Page 6 of 16

First assess the work area to identify and eliminate possible fire hazards e.g. protect by welding curtains R11 Hot shavings causing fires Fires lead to property damage and injuries Ensure functional firefighting equipment is in close proximity during all hot work 1 2 3 Call the fire brigade if fire becomes uncontrollable People must be trained in appropriate work procedures General housekeeping and storage of tools Un-authorised usage or accidental damage/ injuries All tools to be stored in an appropriate manner Tools in use must always be under the control of an authorised person R12 2 2 5 Ensure the machine is cool before re-fuelling R13 Gasoline operated equipment Refuelling of machinery Fire Only refill using appropriate equipment within a safe environment 1 3 6 Ensure fire-fighting equipment in a close proximity Splashes into eyes causing eye damage and/ or skin irritation Refill in a safe manner R14 2 1 2 Project Risk Assessment Page 7 of 16

Installation and replacing of windows Glass Lacerations and cuts Appropriate measures must be used to remove, carry and install and dispose glass to ensure no injuries to employees or public R15 4 2 12 Digging of excavations Excavation People and animals fall into the excavations getting injured Excavations must be properly fenced off with snow/ orange netting Excavations must be registered and inspected on a daily basis R16 3 3 13 Display appropriate warning signs Excavation collapse All excavations to comply with the Construction Regulations requirements for excavations R17 1 2 3 Existing underground services Damage of existing services Injuries to people Client to communicate the location of existing underground services (electrical, water, gas etc.) R18 3 2 8 Working with Hazardous Chemical Substances Inhalation of fumes Various medical conditions MSDS guidelines to be followed when working with HCS s R19 2 2 5 Project Risk Assessment Page 8 of 16

Ingestion of chemicals Various medical conditions MSDS guidelines to be followed when working with HCS s All containers containing HCS s must be clearly identified R20 1 3 6 Splashes in eyes Various medical conditions MSDS guidelines to be followed when working with HCS s Appropriate eye protection must be worn R21 1 2 3 Contact with skin Various medical conditions MSDS guidelines to be followed when working with HCS s Appropriate PPE must be worn R22 1 2 3 Spillage causing environmental contamination Environmental contamination MSDS guidelines to be followed when working with HCS s R23 1 1 1 Flammable or combustible chemicals Explosions and fires MSDS guidelines to be followed when working with HCS s When working with flammable or combustible chemicals an appropriate fire extinguisher must be kept close R24 2 3 9 Project Risk Assessment Page 9 of 16

Incorrect disposal of chemical waste Environmental pollution and health risk Dispose as per relevant MSDS R25 1 3 6 Incorrect storage of HCS s Environmental pollution Health risk Fire Damage to property All HCS s must be stored as per MSDS and in such a way to prevent un-authorised access R26 2 3 9 COC s must be issued for all gas installations R27 Gas installations Asphyxiation Explosions causing property damage and personal injuries/ death Regular inspection of gas installations No smoking/ open flames in a close proximity to gas bottle storage areas Gas bottles to be stored in purpose made cages and locked 1 2 3 Immediately report any gas leaks Cleaning of common areas Whet slippery surfaces Slip and fall Ensure that appropriate warning signs are displayed while cleaning Prevent excessive use of water R28 3 3 13 Project Risk Assessment Page 10 of 16

Appropriate PPE must be worn R29 Using mechanical cleaning and polishing equipment Injury to operator and public Appropriate warning signs must be displayed Ensure that machinery are always in a state of good repair 2 2 5 Operators to be declared competent to safely use machinery Project Risk Assessment Page 11 of 16

Only qualified and registered electricians to alter and maintain electrical reticulation R30 COC s must be issued for all alterations Electrical installations Alterations and maintenance, e.g. changing of light bulbs, changing circuit breakers etc., to electrical reticulation system Electrical shock Electrical fires Before starting with maintenance/ alterations, ensure that the installation is rendered safe (consider Lock-Out system) Ensure that work area is dry and safe Ensure that appropriate shoes are worn Ensure that an appropriate fire extinguisher is close when performing electrical work 2 3 9 No electrical work may be done close to flammable HCS s Only non-conductive equipment and tools may be used when working on electrical installations Project Risk Assessment Page 12 of 16

Appropriate warning sighs must be displayed by the owner R31 General Pets Being attacked by dogs leading to injuries Don t engage strange dogs Don t enter property without prior arrangements 2 4 14 Owners must ensure that dangerous animals are under control at all times Service providers/ contractors to ensure that the first aid requirements of GSR are adhered to R32 First aid equipment Lack of first aid equipment can result in injuries being aggravated Where a client employs 5 or more people, a first aid box must be available 2 2 5 Where a client employs 10 or more people, a qualified first aid attendant must be trained and appointed Project Risk Assessment Page 13 of 16

Third party involvement Injuries and property damage of third parties Appropriate control measure must be implemented and maintained to minimise third parties exposure to hazards and risks Sufficient third party liability insurance to be in place and up to date at all times R33 2 3 9 Inclement weather Injuries/ fatality Assess and ensure that the weather conditions are conducive to safe working conditions R34 2 2 5 Emergency situations People being injured/ trapped Client to formulate and communicate/ display an Emergency Response Plan R35 2 4 14 Poorly maintained fire - fighting equipment can lead to fires spreading Fire equipment must be formally serviced annually by an AIA R36 2 4 14 Road/ lane obstructions Road/ lane obstructions can lead to accidents Appropriate signage must be displayed to warn of road/ lane obstructions Flag-men must be used where necessary R37 2 3 9 Project Risk Assessment Page 14 of 16

Bodies of water (swimming pools, dams etc.) Drowning Applicable legislation to be adhered to R38 2 4 14 RISK ASSESSMENT CONDUCTED BY: RISK ASSESSMENT ATTENDANCE The following persons were involved in conducting the above risk assessment: Full name and Surname Signature Date Project Risk Assessment Page 15 of 16

Initial Assessment 1 st Review 2 nd Review 3 rd Review 4 th Review 5 th Review RISK ASSESSMENT REVISIONS The risk assessment will be reviewed monthly during the internal self-audits and upgraded and changed when necessary as the project develops. Date Risk Numbers Changed Signature Risk Assessor Project Risk Assessment Page 16 of 16