CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Similar documents
Transportation Impacts: Toronto York Spadina Subway Extension

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Transportation Master Plan Advisory Task Force

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

4 Ridership Growth Study

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Sixth Line Development - Transit Facilities Plan

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Construction Staging Area Vaughan Road

York Region Population and Employment Growth

2 BOLTON COMMUTER RAIL SERVICE FEASIBILITY STUDY

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Transportation Assessment

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF APRIL 19, 2017

Public Works and Infrastructure Committee. General Manager, Transportation Services

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

Governance and Priorities Committee Report For the July 2, 2015 Meeting

St. John's Sideroad and Leslie Street Trail System Underpasses

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Public Event 1 Community Workshops

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

102 Avenue Corridor Review

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

TORONTO TRANSIT COMMISSION REPORT NO.

Service Business Plan

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

Item No Halifax Regional Council January 16, 2018 January 30, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

Chapter 5 Future Transportation

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Chapter 3 DESIGN SPECIFICATIONS

We believe the following comments and suggestions can help the department meet those goals.

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017

2.0 LANE WIDTHS GUIDELINE

Building Great Neighbourhoods BONNIE DOON

TRANSPORTATION NEEDS ASSESSMENT

CITY OF KINGSTON INFORMATION REPORT TO ENVIRONMENT, INFRASTRUCTURE & TRANSPORTATION POLICIES COMMITTEE Report No.: EITP

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road

Why invest in the 1 Street S.W. Corridor?

Appendix J Transportation Master Plan Assessment

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Nomination. Halton Region in Context

REPORT. Engineering and Construction Department

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

CPC Parking Lot Riverside Drive. Transportation Rationale

Classification Criteria

TRANSPORTATION TOMORROW SURVEY

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Building Great Neighbourhoods QUEEN ALEXANDRA

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

Appendix 1 Transit Network Analysis

Design of Stanley Park S-Curve

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

Omaha s Complete Streets Policy

City of Waterloo Complete Streets Policy

Workshop Feedback Report

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

Basalt Creek Transportation Refinement Plan Recommendations

Welcome. If you have any questions or comments on the project, please contact:

Copenhagen Cycling Map. Red Lines Cycling facilities

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

2. Executing a legal agreement with respect to (1) above.

Kelowna On the Move. Pedestrian and Bicycle Master Plan

CONNECTING PEOPLE TO PLACES

7 Yonge and Steeles Area Regional Transportation Study City of Markham and City of Vaughan

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Cycling Facilities on Woodbine Avenue and Corley Avenue

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

122 Avenue: 107 Street to Fort Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Active Transportation Infrastructure Investment A Business Case

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Highway 56 Traffic Study Rymal Road to Cemetery Road

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

REimagining Yonge (Sheppard to Finch) Municipal Class Environmental Assessment Study

Bloor Street Design Feasibility Study and Bike Lane Pilot Project. Public Works and Infrastructure Committee

Transcription:

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on October 30, 2012. 31 TORONTO-YORK SPADINA SUBWAY EXTENSION (TYSSE) STEELES WEST SECONDARY PLAN STREET C CONSTRUCTION WARD 4 VICINITY NORTH OF STEELES AVENUE BETWEEN JANE AND KEELE The Committee of the Whole recommends approval of the recommendation contained in the following report of the Commissioner of Engineering and Public Works, dated October 16, 2012: Recommendation The Commissioner of Engineering and Public Works, in consultation with the Commissioner of Finance / City Treasurer recommends: 1. THAT Council authorize staff to reimburse the Toronto Transit Commission the certified cost attributable to the additional widening of Street C to accommodate on-street bike lanes as recommended by the Commissioner of Engineering and Public Works with funding from Capital Project DT-7066-11. Contribution to Sustainability The Toronto-York Spadina Subway Extension (TYSSE) project will provide higher order transit infrastructure to support compact urban form and will offer an alternative mode of transportation to the single occupant vehicle. In addition, the subway extension into the City will stimulate the establishment of transit orientated development within the Steeles West Secondary Plan Area and the Vaughan Metropolitan Centre. The TYSSE is committed to applying sustainability standards in the design and construction of the subway project. Economic Impact The TYSSE has advised that the incremental cost associated with widening Street C to accommodate on-street bike lanes has been estimated to be approximately $176,000. Approved Capital Project DT-7066-11 (Steeles West Station Infrastructure TYSSE) allocates $3,000,000 for the design and construction of infrastructure required to support the Steeles West Subway Station, with funding from City-wide Development Charges. Accordingly, there are sufficient budgeted funds to cover this expense. Communications Plan The TYSSE Project Team will be advised of the approved recommendations originating from this report. Purpose The purpose of this report is to seek approval to reimburse the Toronto Transit Commission (TTC) for the incremental cost associated with the construction of bike lanes on Street C in the Steeles West Secondary Plan area. Background - Analysis and Options The TYSSE Project is currently under construction and scheduled to open for full revenue service to the Steeles West Secondary Plan area by late 2015. /2

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, CW Report No. 39 Page 2 Steeles West Plan will accommodate 5,500 residential units, 120,000 square metres of office/commercial space and subway station The Steeles West Secondary Plan area is bounded by Steeles Avenue to the south, Hydro Corridor and Canadian National Railway right-of-way to the north, Jane Street to the west and Keele Street to the east as shown on Attachment No. 1. At full build out, the Plan is expected to accommodate approximately 5,500 residential units and 120,000 square metres of office/commercial uses thereby generating a residential population of approximately 11,000 people and an estimated 5,000 employees. The area is currently comprised of vacant land with some existing low-rise employment uses including the United Parcel Service operations building east of Jane Street. There are significant public and private developments currently underway within the area, including the TYSSE Steeles West Subway Station, a York Region Transit (YRT) Bus Terminal and commuter parking lot. In addition, an active site development application for the vacant lands west of Keele Street is currently under review and consideration by staff. On-going subway construction provides opportunity to advance the construction of elements of the ultimate infrastructure needs for the Steeles West Plan The construction of the Steeles West Subway Station building and underground subway box is currently underway. Construction of the YRT bus terminal, commuter parking lot, passenger pickup/drop off and Street C will be included in the second phase of TYSSE construction for this area. Based on recent discussions with TTC staff, it is anticipated the detailed design and tender for phase two construction works will occur over the next six months. Street C is part of the primary north-south road network within the Steeles West Plan linking to the York University lands south of Steeles Avenue. The ultimate vision for Street C is to serve as a primary north-south multi-modal transportation corridor within the Steeles West Plan. Given the immediate proximity of Street C to the Steeles West Subway Station, YRT Bus Terminal and commuter parking lot, it is likely that development activity along this corridor will occur in conjunction with, or soon after opening day for the subway. The relationship between Street C and the overall plan for the Steeles West area, subway station, bus terminal and commuter parking lot is illustrated on Attachment No 2. A four lane roadway will be built and funded as part of the subway project The projected traffic volumes associated with the subway station and commuter parking lot requires four lanes of capacity on Street C on opening day; accordingly, the TYSSE project has identified the following base municipal infrastructure elements for Street C to be fully funded by the project: 26 metre right-of-way Pavement structure to accommodate four general purpose traffic lanes Fully urbanized cross section including concrete curb and gutter Streetlighting to City standards Concrete sidewalk along the west boulevard A temporary turn-around facility or suitable alternative at the north limit of Street C to accommodate larger vehicles such as snow ploughs and garbage trucks Storm sewers and watermain as required to service Street C, the subway station, bus terminal and commuter parking lot TTC has advised that the City will be responsible for the cost of any additional municipal infrastructure beyond the base elements, which the City may want, constructed in conjunction with the project. /3

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, CW Report No. 39 Page 3 City staff has negotiated for bike lanes on Street C to be built concurrently with the subway project at the City s cost In reviewing the TYSSE Project base case design elements, a number of ultimate design considerations for Street C were considered by staff, including: Ultimate multi-modal transportation objectives Pedestrian realm Facilitation of development Constructability, land requirements Financial implications Based on this review, staff is recommending that the ultimate right-of-way configuration for Street C should include a four lane cross-section, dedicated on-street bicycle lanes, and ample space for high quality streetscape furnishings and pedestrian zones. A 26.0 metre right-of-way will be required to accommodate these features. The provision of dedicated bike lanes on Street C is in keeping with the objectives of the Vaughan Official Plan and Transportation Master Plan, and will provide safety for cyclists by separating cyclists from traffic. Street C will become a busy corridor as it is the main access point for the subway station and commuter parking lot. In addition to good public transit links, the City is encouraging commuters to use active transportation to reduce the need to use the car for commuting and local trips. The east-west corridors in the Steeles West area will also have cycle facilities providing connectivity to the bike lanes on Street C, as well as the local and surrounding areas. Construction of the bike lanes concurrently with the road construction will minimize future disruptions due to construction activities along the proposed subway alignment and allow opportunities for development to proceed in a timely manner and in support of the anticipated inservice date for the subway extension to the VMC area. Accordingly, staff supports the need to advance the ultimate roadway construction to include on-street bike lanes along Street C. The City s is to reimburse TTC for the design and construction of the bike lanes on Street C TTC provided a preliminary cost estimate for the widening of the pavement structure on Street C to provide for the on-street bike lanes (inclusive of detailed design and construction), which amounted to approximately $176,000. TTC has requested the City formally confirm the availability of funding for this additional work before advancing the design of the infrastructure. Relationship to Vaughan Vision 2020/Strategic Plan In consideration of the strategic priorities related to Vaughan Vision 2020, the recommendations of this report will assist in: The pursuit of excellence in service delivery; Planning and managing growth, and economic vitality; and The demonstration of leadership and promotion of effective governance. Specific Strategic Plan Initiatives applicable to the recommendations made in this report include Vaughan s corporate priorities to support and plan high capacity transit at strategic locations throughout the City. Accordingly, this report is consistent with the priorities previously set by Council. /4

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, CW Report No. 39 Page 4 Regional Implications York Region is a funding partner for the Toronto-York Spadina Subway Extension project. Conclusion Construction of Street C to a four lane cross-section is required for opening day of the TYSSE project. Accordingly, the scope of this work will be designed, constructed and paid by the TYSSE project. The City is responsible to pay the cost of the additional road widening needed to facilitate on-street bike lanes. The TTC has requested confirmation the City will reimburse the funds for the incremental cost associated with this work before the construction contract is awarded. Accordingly, it is recommended that Council authorize staff to reimburse the TTC the certified cost attributable to providing bike lanes on Street C with funding from Capital Project DT-7066-11. Attachments 1. Steeles West Secondary Plan Location Map 2. Overall Development Plan Report prepared by: Michael Frieri, Manager of Engineering Planning & Studies Ext. 8729 (A copy of the attachments referred to in the foregoing have been forwarded to each Member of Council and a copy thereof is also on file in the office of the City Clerk.)

COMMITTEE OF THE WHOLE OCTOBER 16, 2012 TORONTO-YORK SPADINA SUBWAY EXTENSION (TYSSE) STEELES WEST SECONDARY PLAN STREET C CONSTRUCTION WARD 4 VICINITY NORTH OF STEELES AVENUE BETWEEN JANE AND KEELE Recommendation The Commissioner of Engineering and Public Works, in consultation with the Commissioner of Finance / City Treasurer recommends: 1. THAT Council authorize staff to reimburse the Toronto Transit Commission the certified cost attributable to the additional widening of Street C to accommodate on-street bike lanes as recommended by the Commissioner of Engineering and Public Works with funding from Capital Project DT-7066-11. Contribution to Sustainability The Toronto-York Spadina Subway Extension (TYSSE) project will provide higher order transit infrastructure to support compact urban form and will offer an alternative mode of transportation to the single occupant vehicle. In addition, the subway extension into the City will stimulate the establishment of transit orientated development within the Steeles West Secondary Plan Area and the Vaughan Metropolitan Centre. The TYSSE is committed to applying sustainability standards in the design and construction of the subway project. Economic Impact The TYSSE has advised that the incremental cost associated with widening Street C to accommodate on-street bike lanes has been estimated to be approximately $176,000. Approved Capital Project DT-7066-11 (Steeles West Station Infrastructure TYSSE) allocates $3,000,000 for the design and construction of infrastructure required to support the Steeles West Subway Station, with funding from City-wide Development Charges. Accordingly, there are sufficient budgeted funds to cover this expense. Communications Plan The TYSSE Project Team will be advised of the approved recommendations originating from this report. Purpose The purpose of this report is to seek approval to reimburse the Toronto Transit Commission (TTC) for the incremental cost associated with the construction of bike lanes on Street C in the Steeles West Secondary Plan area. Background - Analysis and Options The TYSSE Project is currently under construction and scheduled to open for full revenue service to the Steeles West Secondary Plan area by late 2015. Steeles West Plan will accommodate 5,500 residential units, 120,000 square metres of office/commercial space and subway station

The Steeles West Secondary Plan area is bounded by Steeles Avenue to the south, Hydro Corridor and Canadian National Railway right-of-way to the north, Jane Street to the west and Keele Street to the east as shown on Attachment No. 1. At full build out, the Plan is expected to accommodate approximately 5,500 residential units and 120,000 square metres of office/commercial uses thereby generating a residential population of approximately 11,000 people and an estimated 5,000 employees. The area is currently comprised of vacant land with some existing low-rise employment uses including the United Parcel Service operations building east of Jane Street. There are significant public and private developments currently underway within the area, including the TYSSE Steeles West Subway Station, a York Region Transit (YRT) Bus Terminal and commuter parking lot. In addition, an active site development application for the vacant lands west of Keele Street is currently under review and consideration by staff. On-going subway construction provides opportunity to advance the construction of elements of the ultimate infrastructure needs for the Steeles West Plan The construction of the Steeles West Subway Station building and underground subway box is currently underway. Construction of the YRT bus terminal, commuter parking lot, passenger pickup/drop off and Street C will be included in the second phase of TYSSE construction for this area. Based on recent discussions with TTC staff, it is anticipated the detailed design and tender for phase two construction works will occur over the next six months. Street C is part of the primary north-south road network within the Steeles West Plan linking to the York University lands south of Steeles Avenue. The ultimate vision for Street C is to serve as a primary north-south multi-modal transportation corridor within the Steeles West Plan. Given the immediate proximity of Street C to the Steeles West Subway Station, YRT Bus Terminal and commuter parking lot, it is likely that development activity along this corridor will occur in conjunction with, or soon after opening day for the subway. The relationship between Street C and the overall plan for the Steeles West area, subway station, bus terminal and commuter parking lot is illustrated on Attachment No 2. A four lane roadway will be built and funded as part of the subway project The projected traffic volumes associated with the subway station and commuter parking lot requires four lanes of capacity on Street C on opening day; accordingly, the TYSSE project has identified the following base municipal infrastructure elements for Street C to be fully funded by the project: 26 metre right-of-way Pavement structure to accommodate four general purpose traffic lanes Fully urbanized cross section including concrete curb and gutter Streetlighting to City standards Concrete sidewalk along the west boulevard A temporary turn-around facility or suitable alternative at the north limit of Street C to accommodate larger vehicles such as snow ploughs and garbage trucks Storm sewers and watermain as required to service Street C, the subway station, bus terminal and commuter parking lot TTC has advised that the City will be responsible for the cost of any additional municipal infrastructure beyond the base elements, which the City may want, constructed in conjunction with the project.

City staff has negotiated for bike lanes on Street C to be built concurrently with the subway project at the City s cost In reviewing the TYSSE Project base case design elements, a number of ultimate design considerations for Street C were considered by staff, including: Ultimate multi-modal transportation objectives Pedestrian realm Facilitation of development Constructability, land requirements Financial implications Based on this review, staff is recommending that the ultimate right-of-way configuration for Street C should include a four lane cross-section, dedicated on-street bicycle lanes, and ample space for high quality streetscape furnishings and pedestrian zones. A 26.0 metre right-of-way will be required to accommodate these features. The provision of dedicated bike lanes on Street C is in keeping with the objectives of the Vaughan Official Plan and Transportation Master Plan, and will provide safety for cyclists by separating cyclists from traffic. Street C will become a busy corridor as it is the main access point for the subway station and commuter parking lot. In addition to good public transit links, the City is encouraging commuters to use active transportation to reduce the need to use the car for commuting and local trips. The east-west corridors in the Steeles West area will also have cycle facilities providing connectivity to the bike lanes on Street C, as well as the local and surrounding areas. Construction of the bike lanes concurrently with the road construction will minimize future disruptions due to construction activities along the proposed subway alignment and allow opportunities for development to proceed in a timely manner and in support of the anticipated inservice date for the subway extension to the VMC area. Accordingly, staff supports the need to advance the ultimate roadway construction to include on-street bike lanes along Street C. The City s is to reimburse TTC for the design and construction of the bike lanes on Street C TTC provided a preliminary cost estimate for the widening of the pavement structure on Street C to provide for the on-street bike lanes (inclusive of detailed design and construction), which amounted to approximately $176,000. TTC has requested the City formally confirm the availability of funding for this additional work before advancing the design of the infrastructure. Relationship to Vaughan Vision 2020/Strategic Plan In consideration of the strategic priorities related to Vaughan Vision 2020, the recommendations of this report will assist in: The pursuit of excellence in service delivery; Planning and managing growth, and economic vitality; and The demonstration of leadership and promotion of effective governance. Specific Strategic Plan Initiatives applicable to the recommendations made in this report include Vaughan s corporate priorities to support and plan high capacity transit at strategic locations throughout the City. Accordingly, this report is consistent with the priorities previously set by Council.

Regional Implications York Region is a funding partner for the Toronto-York Spadina Subway Extension project. Conclusion Construction of Street C to a four lane cross-section is required for opening day of the TYSSE project. Accordingly, the scope of this work will be designed, constructed and paid by the TYSSE project. The City is responsible to pay the cost of the additional road widening needed to facilitate on-street bike lanes. The TTC has requested confirmation the City will reimburse the funds for the incremental cost associated with this work before the construction contract is awarded. Accordingly, it is recommended that Council authorize staff to reimburse the TTC the certified cost attributable to providing bike lanes on Street C with funding from Capital Project DT-7066-11. Attachments 1. Steeles West Secondary Plan Location Map 2. Overall Development Plan Report prepared by: Michael Frieri, Manager of Engineering Planning & Studies Ext. 8729 Respectfully submitted, Paul Jankowski, P.Eng. Andrew Pearce, C.E.T. Commissioner of Engineering Director of Development / And Public Works Transportation Engineering