WELCOME. City of Eden Prairie West 70 th Street

Similar documents
Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

PUBLIC REALM MASTER PLAN

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

TRANSPORTATION STANDARDS

City of Wilsonville 5 th Street to Kinsman Road Extension Project

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Schutte Park Master Plan February 14, 2017

Elm Street Business District: Streetscape and Signage Plan

MARTIN LUTHER KING JR. WAY

S T A T I O N A R E A P L A N

Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

Transportation Planning Division

VT15 / Allen Martin Drive Intersection Scoping Study

Community Task Force November 15, 2017

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Agenda. Citizen Advisory Committee. CSAH 101 (CSAH 62 to Hutchins Drive) City of Minnetonka May 29, :00 pm

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Tonight is for you. Learn everything you can. Share all your ideas.

Henderson Ave. Complete Streets Project

Knox Street Complete Streets Project

Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area.

Financial Project ID No(s).: and ETDM No(s).: and 14181

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Transportation Planning Division

4 GENERIC COST ESTIMATING TOOL

Hennepin County Transportation Department

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

UDC Street Cross Sections

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Ocean Park Boulevard Green Street Project Community Workshop

Lawrence Avenue Streetscape Concepts August 30, 2011

LAKE-TO-LAKES TRAIL. City Planning Commission October 7, 2014

Meade Street Bridge Design Alternative Study

DEFINING THE STREETSCAPE DRAFT

Route 79/Davol Street Corridor Study

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Building Great Neighbourhoods BONNIE DOON

Cross Street Corridor Non-Motorized Enhancement Project Project Description

NJDOT Complete Streets Checklist

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

RZC Appendix 8A Marymoor Subarea Street Requirements

Derby Street. Project Updates. Salem, Massachusetts

Building Great Neighbourhoods LANSDOWNE

Pre-Construction Meeting

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

122 Avenue: 107 Street to Fort Road

STREETSCAPE CONCEPT PLAN

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Omaha s Complete Streets Policy

Why invest in the 1 Street S.W. Corridor?

Chapter 3: Multi-Modal Circulation and Streetscapes

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

TRANSPORTATION NEEDS ASSESSMENT

83 AVENUE PRE-CONSTRUCTION MEETING

Broad Street Bicycle Boulevard Design Guidelines

Application of a Complete Street

ADA Training Standard Plans

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Diamond Springs Parkway Project

Freeway ramp intersection study

Lincoln Neighborhood Corridor Plan The LiNC

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

A-1 Arcadia with Signal

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

e. 173rd/AVALON bicycle boulevard Shaker Heights Review Meeting - May 9, 2013

5. RUNNINGWAY GUIDELINES

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Major Bike Routes 102 Avenue Workshop April 21, 2015

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Monroe Street Reconstruction Planning

Streetscape: Core Shopping District

Sloat Blvd. Pedestrian Safety Improvement Project

Tysons-Old Meadow Road Bike/Ped Improvements

Paoli Road Improvement Feasibility Study

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Transcription:

WELCOME City of Eden Prairie West 70 th Street

Project Schedule Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug >>> May WEST SEGMENT Concept Plan Fall 2014 Plan Development Winter 2014 Summer 2015 Construction Summer/Fall 2015 OPEN HOUSE EAST SEGMENT Concept Plan Fall 2014 Plan Development Winter 2014 Summer 2015 Construction TBD/ Coordinated with LRT Anticipated 2017 City of Eden Prairie West 70 th Street

Conceptual Plan Process Stakeholder Meeting Stakeholder Meeting Stakeholder Meeting OPEN HOUSE Primary Project Considerations: Multi-modal Operations Safety Aesthetics Environmental/ Sustainability Property Impacts & Cost Concept Development Feedback on Four Preliminary Design Elements On-street Bike Lanes On-street Parking Left Turn Lanes Medians Concept Refinement Feedback on Concept Plans & Streetscaping Recommended Concept Plan City of Eden Prairie West 70 th Street

On-Street Bike Lanes Separates pedestrians and bikes in heavy usage area near LRT station Utilizes the additional pavement width needed for large vehicles Provides enhanced commuter bike facilities Recommend providing on-street bike lanes City of Eden Prairie West 70 th Street

On-Street Parking Existing land uses do not need or utilize on-street parking Design will consider the potential for future on-street parking with redevelopment Increases the overall footprint (size) of the roadway Not recommending providing on-street parking City of Eden Prairie West 70 th Street

Left Turn Lanes A two-lane roadway provides acceptable operations Forecasted traffic volumes are not high enough to warrant left turn lanes (5,000-7,000 vehicles per day) Left turns will be provided at Flying Cloud Drive and Shady Oak Road for improved intersection operations Increases the overall footprint (size) of the roadway Not recommending left turn lanes along the corridor City of Eden Prairie West 70 th Street

Provides gateway and aesthetic enhancement Allows pedestrian refuge Can be designed to accommodate turning movements for large vehicles Increases overall footprint (size) of the roadways To minimize the overall footprint, could be placed at key locations Considering medians at each end and at the LRT station, not along the entire corridor Median City of Eden Prairie West 70 th Street

Legend Deciduous Tree Turf Establishment Street Light Wetland Future LRT B Bus/Drop-off A Bus/Drop-off Stormwater Treatment Opportunities: Rain gardens in boulevards or behind walk Tree trenches in boulevard Depressed median with rain gardens Pervious pavement in drop off areas Stormwater pond A B Alternative 1 Layout Plan Concrete Bike Lane Shady Oak Road Flying C loud Dri ve Roadway Key Design Elements: On-street bike lanes No on-street parking No left turn lanes Medians at each end of corridor and at LRT station ~ $2.6M + 12,900 SF ROW Cost is for full reconstruction of roadway Impervious surface area = + 9,600 SF 0 12 Thru Alternative 1 Cross Section A 70 Right of Way 12 Thru Concrete Bike Lane Concrete Bike Lane 14 Thru 10 Median 14 Left Turn 9 Right of Way Striped Bike Lane 14 Right Turn 60 120 feet Alternative 1 Cross Section B Alternative 1 Two Lane Roadway with Concrete Bike Lanes, s and Medians Roadway Alternative 1 - Two Lane Roadway with Concrete Bike Lanes, s, and Medians at Ends West 70th Street Improvements City of Eden Prairie November 13, 2014 Cit y of Eden Prairie West 70th Street

Legend Deciduous Tree Turf Establishment Street Light Wetland Future LRT B Bus/Drop-off A Bus/Drop-off Shady Oak Road ve Flying C loud Dri Roadway Key Design Elements: On-street bike lanes No on-street parking No left turn lanes No medians Smallest footprint ~ $2.3M + 5,600 SF ROW Cost is for full reconstruction of roadway Impervious surface area = + 8,200 SF B Stormwater Treatment Opportunities: Rain gardens in boulevards or behind walk Tree trenches in boulevard Pervious pavement in drop off areas Stormwater pond A Alternative 2 Layout Plan Striped Bike Lane Alternative 2 Cross Section A 0 12 Thru 12 Thru 70 Right of Way Striped Bike Lane Striped Bike Lane Alternative 2 Cross Section B 12 Thru 12 Left Turn Striped Bike Lane 84 Right of Way 14 Right Turn 60 Alternative 2 Two Lane Roadway with Striped Bike Lanes and s Roadway Alternative 2 - Two Lane Roadway with Striped Bike Lanes, and s West 70th Street Improvements City of Eden Prairie November 13, 2014 Cit y of Eden Prairie West 70th Street 120 feet

Base Streetscape Design Elements: Turf Grass s and medians Roadway height street lights Standard gray concrete Basic bench and bike rack Tree box for stormwater treatment in boulevard Roadway light (30 height) Deciduous Trees in s Basic Bench Base Level Streetscape City of Eden Prairie West 70 th Street

Moderate Streetscape Design Elements: Deciduous trees in boulevards and medians Low maintenance plantings in medians Ornamental height street lights Colored concrete accents in median Bollards at median noses Simple railing or plantings at parking lot edges Tree trench with plantings in boulevard Ornamental light (15 20 height) Bollards at median noses West 70th Street Improvements Moderate City of Eden Prairie Level Streetscape Metal bench and simple plantings Trees and low maintenance plantings in medians November 13, 2014 Cit y of Eden Prairie West 70th Street

High Level Streetscape High Level Streetscape Design Elements: Deciduous trees in boulevards and medians Ornamental plantings in medians Ornamental/Ped height street lights w/ banners Enhanced paving such as pavers or colored and textured concrete Bollards at median noses Banner poles at ends and middle of medians Gateway treatments at intersections Ornamental Light (15-20 height) with Banners West 70th Street Improvements Rain garden in boulevard Pedestrian seating plaza with ornamental fence Decorative concrete and ornamental plantings in median Ornamental plantings in boulevard and medians City of Eden Prairie Streetscape High Level Banner poles and bollards in medians November 13, 2014 Cit y of Eden Prairie West 70th Street

DESIGN ELEMENT LEVEL 1 (BASE) LEVEL 2 (MODERATE) LEVEL 3 (HIGH) 5% - 10% of Base Road Cost 15% - 25% of Base Road Cost 30% -50% of Base Road Cost PAVING Standard gray concrete Colored concrete Concrete Pavers Stamped or textured concrete PLANTING Turf grass Deciduous trees Low maintenance plantings Higher maintenance ornamental plantings LIGHTING Roadway level lights Ornamental level lights Pedestrian level lights Banners, flower baskets FENCING AND FURNISHINGS Bench Bike Rack Banner poles Bollards Ornamental fencing Gateway treatment APPROXIMATE COST Comparison of Streetscape Treatments West 70th Street Improvements City of Eden Prairie November 13, 2014 Cit y of Eden Prairie West 70th Street

Stormwater Treatment Opportunities Rain garden and screening along parking lot Tree trench with ornamental plantings in boulevard Tree trench with curb inlet in boulevard Tree trench in paved boulevard Tree trench in paved boulevard Note: Effectiveness and constructiblity of various storm water treatment BMP s depends on factors to be determined, including site conditions and final engineering design. Infiltration swale along parking lot Depressed median with infiltration and plantings West 70th Street Improvements Stormwater Treatment Oppor tunities City of Eden Prairie November 13, 2014 Cit y of Eden Prairie West 70th Street