ABOUT THIS OPEN HOUSE

Similar documents
FOLSOM-HOWARD STREETSCAPE OVERVIEW

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Welcome! San Jose Avenue Open House August 25, 2015

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Bicycle Network. Vision Zero San Francisco The City and County of San

CURBSIDE ACTIVITY DESIGN

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Freeway ramp intersection study

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Polk Streetscape Project

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Mission Bay Loop (MBL) Public Meeting

EXECUTIVE SUMMARY. Vision

Active Transportation Facility Glossary

ABOUT THIS STUDY The Tenderloin-Little Saigon Community-Based Transportation Plan

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Vision Zero Priority Projects (March 2017)

Better Market Street Project. Project Update January 15, 2015

PEDESTRIAN ACTION PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

The Wiggle Route in Context

WELCOME Mission-Geneva Transportation Study

Better Market Street Project Update. Urban Forestry Council September 17, 2014

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Richmond-Adelaide Cycle Tracks

122 Avenue: 107 Street to Fort Road

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

EMPHASIS AREA 1: PEDESTRIANS

Bicycle Master Plan Goals, Strategies, and Policies

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Geary Corridor Bus Rapid Transit

FINAL REPORT DECEMBER 2011

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

VISION ZERO SF: ELIMINATING TRAFFIC DEATHS BY 2024 JANUARY 5, 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

VISIONZEROPHL.COM #VISIONZEROPHL

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Living Streets Policy

Governance and Priorities Committee Report For the July 2, 2015 Meeting

THIS PRINT COVERS CALENDAR ITEM NO. : 12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY. DIVISION: Sustainable Streets BRIEF DESCRIPTION:

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Broad Street Bicycle Boulevard Design Guidelines

Southside Pilot Proposal

Tonight is for you. Learn everything you can. Share all your ideas.

Cycle Track Design Best Practices Cycle Track Sections

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

CONNECTING PEOPLE TO PLACES

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

TASK FORCE UPDATE MARCH 29, 2016

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

THE OFFICIAL GUIDE TO CYCLING SAFELY IN PHILADELPHIA

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

ACTIVE TRANSPORTATION

San Francisco 2009 Collisions Report April 21, 2011

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Introduction. North 12 th Complete Street Project Overview

A Survey of Planning, Design, and Education for Bikeways and Bus Routes on Urban Streets

Why invest in the 1 Street S.W. Corridor?

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Tunnel Reconstruction South 5 th Street Association October 16, 2018

SFMTA PROJECT TIMELINE

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Arlington s Master Transportation Plan

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Pedestrian and Bicycle Improvements in Balboa Park Station Area

City of Seattle Edward B. Murray, Mayor

Today. Develop Plans. Public Listening Session

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Shared Lane Markings: When and Where to Use Them. Mike Sallaberry, SFMTA Pro Walk/Pro Bike in Seattle September 4, 2008

FALL 2014 WORKSHOPS TAKEAWAYS

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Broadway Complete Streets Project

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

SPEED MANAGEMENT FOR VISION ZERO

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Community Task Force July 25, 2017

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

VISION ZERO: What will it take?

Bicycle Facilities Planning

Transcription:

ABOUT THIS OPEN HOUSE Welcome, and thanks for joining us today for the Folsom-Howard Near-Term Project! The purpose of today s open house is to: Understand how the near-term project ties into the larger streetscape project Share near-term designs for better bike lanes, parking and loading, and transit Provide comments on what you ve seen today

LINKING THE NEA-TEM AND STEETSCAPE POJECTS In April, we shared possible alternatives for the Folsom- Howard Streetscape Project. They included wider sidewalks, better bike facilities, green space, and better transit facilities. egardless of which alternative is chosen, the streetscape project will be a major construction effort. Construction along the 2.5 mile corridor will not be completed until 2022. Therefore, we have been exploring ways to bring Existing Folsom St. SoMa safety, transit, and loading improvements sooner. The Folsom-Howard Near-Term Project will make SoMa safer faster by implementing quick and effective measures - similar to the recent improvements on 7th and 8th streets. These upgrades will improve how people walk, bike, take transit, and load goods and passengers. ecently Upgraded 8th St. Similar to Near-Term Folsom and Howard ecommendations Near-Term Project Goals: Improve safety sooner Make biking and walking more comfortable Upgrade transit facilities to improve travel time and safety Improve loading for local businesses Inform the final design for the larger streetscape project Possible Final Streetscape Design David Baker Architects

WE NEED TO CHANGE FOLSOM AND HOWAD Folsom and Howard streets are on San Francisco s High Injury Network, which represent the 12 percent of city streets that account for 70 percent of severe and fatal traffic collisions. Over the last 5 years, 308 people were injured and 3 people were killed from 421 crashes on Folsom and Howard streets including: 1 Pedestrian fatality on Howard at 7th Vision Zero High Injury Network Map 1 Bicyclist fatality on Folsom at 6th 1 Bicyclist fatality on Howard at 7th 88 Pedestrian injuries 72 Bicyclist injuries Primary Crash Factors on Folsom and Howard Streets 80 7% 60 30% 20% # of Incidents 40 20 22% High Injury Streets High Injury Intersections Project Area Every year, 30 people are killed and 200 more are seriously injured in San Francisco traffic crashes. 0 89% 59% Vehicle Violating Pedestrian ight of Way Turning Vehicle un Factor ed Light / Stop Sign Speeding Folsom and Howard Crash Facts Hazardous Vehicle Movements of bike and pedestrian collisions with motorists occur at intersections. of collisions occur due to unsafe motorist behavior such as running red lights, 21% speeding, and encroaching on pedestrian right-of-way. Our city s Vision Zero commitment is to end all traffic deaths. 42% of bike crashes are broadside collisions (t-bone).

POPOSED NEA-TEM IMPOVEMENTS The Near-Term Project will include improvements for bicyclists, pedestrians, transit riders and people who park and load. To implement these changes on Folsom, about 9% of parking spaces will be repurposed for commercial loading and 26% of parking spaces will be removed to enhance safety and visibility. Near-term changes could be implemented this winter and the SFMTA will continue outreach to neighbors, local business and community groups about these inexpensive and proven techniques that improve safety. South of Market 12th St 13th St 10th 11th St Folsom Mission Howard h St Western SoMa 6th S East SoMa Mission Howard Central Corridor Folsom 2nd St Harrison H Folsom Near-Term painted parking protected bikeways will be pursued on between 12th and 4th Potential Howard Near-Term painted parking protected bikeway between 11th and 6th A new buffered bike lane will be added on southbound Folsom between 11th and 13th The full will include landscaping and curb changes Parking protectted bikeways separate pedestrians and bicyclists from cars. They also reduce vehicles blocking bike lanes - currently, a frequent problem. Double the number of yellow zones on Folsom to provide additional space for commercial loading and reduce the frequency of double parking. Boarding islands will reduce conflicts between the 12-Folsom and bicycle riders while decreasing travel time and improving reliability. Daylighting increases safety by using red zones near crosswalks to improve the visibility of everyone using the street The next several boards describe the bicycle, pedestrian, and transit improvements that will be included in the near-term project. A rendering of Folsom and Howard with these improvements is located at the center of the room. Please tell us what you think.

ELEMENTS OF A PAKING-POTECTED BIKEWAY A parking-protected bikeway swaps the position of existing curbside parking and buffered bike lanes. Instead of riding between moving traffic and parked cars, bicyclists ride between a striped buffer and the sidewalk. Parking-Protected Bicycle lanes are to the right of parked vehicles rather than the left Greater separation between pedestrians and bicyclists and moving vehicles Prevents double parking in the bike lane Additional room for bicyclists to pass each other educes potential for dooring Accommodates on-street parking and loading needs Transit boarding islands eliminate weaving with buses at bus stops Mixing Zones Positions vehicles to the curbside lane to reduce right-hooks with bicyclists Dashed green striping is used to caution where travel modes mingle Yield teeth markings indicate rightturning vehicles must yield to cyclists Two-Stage Turn Box Clarifies where cyclists can turn left to connect to other bike routes Brings awareness to all road users of where cyclists can be expected. educes conflicts between turning cyclists and vehicles Existing Typical Midblock Cross-Section: Bike lane between parked cars and moving vehicles Proposed Near-Term Typical Midblock Cross-Section: Bike lane between parked cars and the sidewalk

TANSIT AND PEDESTIAN IMPOVEMENTS The Folsom-Howard Near-Term Project includes improvements to the 12-Folsom to make it safer, quicker, and more comfortable to travel on Folsom and Howard through SoMa. Advanced limit lines and daylighting provide additional space and visibility between vehicles and pedestrians. Transit Boarding Islands Prevents merging conflicts between buses and bicyclists near bus stops Improves travel time since buses no longer need to pull over to the curb educes street crossing width for pedestrians Advanced Limit Lines Provides extra space between stopping vehicles and pedestrians in the crosswalk Typically placed between 5 to 10 before crosswalks Increases the visibility of pedestrians in the crosswalk to motorists New Bus Shelters Provides protection from weather People waiting for the bus don t block pedestrians on the sidewalk Elevates the visibility and role of transit Ability to provide real-time arrival information is increased with a shelter Intersection Daylighting Increases the visibility of pedestrians and cyclists at intersections Helps kids and people in wheelchairs be seen Parking is restricted near crosswalks and interections to increase visibility Existing Typical Bus Stop Cross-Section Proposed Near-Term Typical Bus Stop Cross-Section

IMPLEMENTING THE NEA-TEM POJECT The Near-Term Project prioritizes quick and cost-effective improvements for bicycle and pedestrian safety, transit, and loading. There are a limited number of designs that make sense with streetscape improvements coming later. There are big differences between Folsom and Howard which affect if the nearterm designs can be implemented on each street. We hope to install the changes on Folsom this winter while working to solve the challenges on Howard. Folsom Street The design for Folsom Street is nearly complete. We are hopeful the Folsom improvements can be implemented this winter. Howard Street Howard Street is similar to Folsom Street but faces greater technical challenges. The primary difference is the presence of overhead wires servicing Muni buses. Implementation Challenges Final review by San Francisco Fire Department Construction before rainy season Implementation Challenges San Francisco Fire Department is not supportive of parking protected bike lanes on streets with overhead wires After This Continued outreach for loading zone preferences SFMTA Board of Directors project approval anticipated this fall Staff will provide notification for the Public Hearing, SFMTA Board of Directors meeting, and start of construction A parking-protected bikeway means parked cars may create conflicts between emergency vehicles and overhead wires Moving overhead wires is very expensive, takes a long time, and may not comply with Muni bus operations After This SFMTA staff will continue to work with other city agencies to possibly find a quick and effective design for Howard Working out these technical challenges will take additional time Depending on the cost and complexity of the solutions to provide protected bike facilities on Howard Street, implementation may not occur prior to the streetscape project. Existing overhead wires on Howard Overhead wire maintenance Existing Folsom Street

WOKING WITH THE COMMUNITY We met business owners, community groups, and stakeholders to understand preferences for the project, parking and loading needs, and what is and isn t working on Folsom and Howard. Our commitment to working with the SoMa community will continue throughout the whole streetscape project. COMMUNITY OUTEACH SUMMAY 1,300 questionnaire responses Meetings with 20 community groups 300 people attended open houses At the December 2016 open houses we asked attendees about community values and preferred amenities for the project. Knocked on 165 businesses doors 80 meetings with local businesses 61 business loading surveys completed At the April 2017 open houses we shared four alternatives based on community input from the first open house and asked people to rank the four alternatives. 11,000 open house notification postcards delivered Distributed 400 open house notification posters 100s of hours of staff outreach

SOMA POJECT COODINATION Several SoMa streets are being transformed to support the Central SoMa Plan and the city s traffic safety goals. Project improvements may include reconfiguring the street, repaving, upgrades to sidewalks and crosswalks, new protected bike lanes, bus stop improvements, and more. The projects below are in various stages of planning, conceptual design and even construction. A list of project managers and their contact info is located at the sign-in desk. St Harrison SoMa Neighborhood Project Map South of Market Bryant 13th 12th St Utah Market St F Proposed Projects Existing Bike Network 11 11th St 10th St Folsom 15th St Protected Bike Lane Design Completed Central SoMa Plan Area Howard ode Island Hyd Mission 9th St Division 1 7/8 Western SoMa Bryant Jon Townsend Tay 6th St Ma Sto Mission Howard Gra Kear Folsom Bryant Mon 2nd St Harrison Harrison Brannan Brannan Showplace Square/Potrero Hill 7/8 F/H T Berry 6th St 6 East SoMa Bluxome ailyard Central SoMa Plan Area 5 Central Corridor 4th St F/H C B King T AT&T Park 2 BMS H Market Transit Center District TFS incon Hill Beale Main Spear N EEP 2 6 5 7/8 11 B C BMS EEP F/H H T TFS F 2nd Street Improvement Project 6th Street Improvement Project 5th Street Streetscape Project 7th/8th Streets Safety Project 11th Street Streetscape Project Brannan Safety Project Central Subway Project Better Market Street Project Embarcadero Enhancement Project Folsom/Howard Streetscape Project Harrison Street Project Townsend Bicycle Strategy Project Transbay Folsom Streetscape Project Folsom 11th St. to 13th St. Southbound Bike Gap Closure Vision Zero amp Intersection Study

POJECT TIMELINE The Folsom Near-Term Project be will constructed this winter while the Streetscape Project will be constructed between 2020 and 2022. 2016 Streetscape #1 Introduced the project and gathered feedback on amenity preferences January February 2017 Streetscape Alternatives Design Project team developed four roadway designs incorporating community comments from #1 March Near-Term Design Streetscape #2 Designs developed improvements for people who bike, walk, ride transit and load goods and people April May Shared and gathered feedback on four possible street designs WE AE HEE Near-Term Share near-term design with community and ask for feedback on minor design details Folsom Near-Term Approval June July August Streetscape Preferred Design Project team will select a Preferred Design considering community feedback, project goals and objectives, and SFMTA preferences Folsom near-term presented at Public Hearing and approved at SFMTA Boards of Directors. Opportunity for public testimony. September October Streetscape #3 Share Preferred Design with the community; request feedback on minor design details. Folsom Near-Term Construction Folsom near-term improvements implemented this fall and winter November December Streetscape Approval Preferred Design presented at Public Hearing and approved at SFMTA Board of Directors. Opportunity for public testimony. 2018 2019 Streetscape Detailed Design Tenatively scheduled 2018-2019 2020 2021 Streetscape Construction Tenatively scheduled 2020-2022 2022