US Route 4 Traffic and Pedestrian Improvement Project

Similar documents
Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Board of Supervisors February 27, 2017

Roundabout Feasibility Memorandum

Public Information Meeting

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

6.4 RECOMMENDED IMPROVEMENTS

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

Making Great Urban Streets Confessions of a Highway Engineer. Timothy R. Neuman.. P.E. Chief Highway Engineer CH2M HILL

Financial Project ID No(s).: and ETDM No(s).: and 14181

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Mark Malone, P.E. SD DOT

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Chapter 4 Traffic Analysis

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Fairfax County Parkway Widening Fairfax County

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions

Boston Post Road Design Feasibility Study

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Frequently Asked Questions

Executive Summary June 2015

PennDOT ICE Policy An Introduction

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

TRANSPORTATION COMMISSION Agenda Staff Report

Glenn Avenue Corridor Traffic Operational Evaluation

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Thank you for attending

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Columbia Pike Implementation Team (CPIT) Meeting

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

SH 68. Meeting with Affected Property Owners September 9, 2014

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

LOOP 360 IMPROVEMENT STUDY

Road Diets FDOT Process

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

CTH M Reconstruction

Clackamas County Comprehensive Plan

MASTER BICYCLE AND PEDESTRIAN PLAN

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Traffic Calming Program Update

AMATS Complete Streets Policy

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Albany Shaker Road Corridor Study Public Meeting # 2

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Fleur Drive Reconstruction

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Proposed Action, Purpose and Need Technical Memorandum

APPENDIX L. Design Criteria

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

DRAFT. Memo. Range of the Alternatives Considered in the EIS

STANLEY STREET December 19, 2017

VT15 / Allen Martin Drive Intersection Scoping Study

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Living Streets Policy

122 Avenue: 107 Street to Fort Road

Figure 1: Vicinity Map of the Study Area

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

City of Moorhead Committee of the Whole Meeting

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

CSAH 101 Preliminary Design

Executive Summary. September 3, 2014

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Application of a Complete Street

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Executive Summary Route 30 Corridor Master Plan

Diamond Springs Parkway Project

Click to edit Master title style

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

East Burke Transportation, Safety and Capacity Improvements

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Roundabouts are good for business

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

Access Management Regulations and Standards

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Committed to Service

I-105 Corridor Sustainability Study (CSS)

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Access Management Regulations and Standards

Performance Criteria for 2035 Long Range Transportation Plan

Giles Run Connector Road

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Transcription:

Welcome to the public meeting for US Route 4 Traffic and Pedestrian Improvement Project June 5, 2018

Introduction Project Team Town of North Greenbush, Tony Germano, Town Comptroller Lou Desso, Town Supervisor Creighton Manning Engineering Don Adams P.E., Greg Gibbons P.E., Josh Wilsey P.E., Matt Reluzco Laberge Group Rich Laberge P.E. Rensselaer County Wayne Bonesteel P.E. NYSDOT

Background Planning Studies 2007 Route 4 and I 90 Connector Study 2016 Town of North Greenbush Route 4 Design Guidelines US Route 4 Funding Locally Administered Federal Aid (LAFA) Project Total Funding $9.83M; Construction Funding $8.26M 80% Federal/20% Local Match

Agenda Project Objectives Existing Conditions Public Input Possible Improvements Project Schedule Public Input

Project Objectives Improve Safety and Mobility Meet the Project Schedule and Budget Reduce Traffic Congestion and Improve Capacity Minimize Impacts

Project Process Project Initiation Data Collection Develop Feasible Improvements Public Review Assemble Draft Design Approval Documents Review Assess Agency/Public Comments Recommend Preferred Alternative Final Design Approval Document Design Approval Detailed Design/ ROW Acquisition Construction

NEPA/SEQRA Process Project Identification, Needs and Objectives Preliminary Alternatives - Engineering Geometrics, Safety, Utilities, Landscaping, Pedestrians and Bicyclists, Cost Estimates Environmental, Social and Economic Considerations Environmental Historical resources, Endangered Species

Progress to Date Ground Survey and Highway Boundary Environmental Screenings (ESA, SHPO, NYSDEC) Crash Data - Collected/Analyzed Traffic Data Recorded Existing Developed Future Volumes (Year 2039) Recorded Existing Vehicle Speeds

Project Limits From NY Route 43. 2.8 miles to City of Troy Border

Existing Conditions US 4: Bloomingrove Drive to Valley View Blvd Oak Hill Apartments Partridge Hill Apartments 1 US Route 4 4 3 2 Van Rensselaer Shopping Center

Existing Conditions Bloomingrove to Valley View US 4 and Bloomingrove facing Northeast Bloomingrove Drive Intersection facing West Valley View Intersection facing North US 4 facing South, Existing parking for businesses

Existing Conditions US Route 4 and Winter Street Ext. Alexis Diner 3 2 US Route 4 1

Existing Conditions Winter Street Ext. US 4 & Winter Street Ext. facing North Winter Street Ext. facing East Ravine adjacent to US 4

Existing Conditions US Route 4 and Williams/Glenmore Road Stewarts Shop 2 1 WS Auto Sales 3 La Salle Institute

Existing Conditions Williams/Glenmore Road Williams & US 4 Intersection facing East US 4 facing North, Existing Sidewalk Limits Bloomingrove Drive and Williams Road

Public Comments Existing Conditions What are your existing concerns? What did we miss?

Proposed Improvements How are improvements developed? Previous Studies Stakeholder Objectives Engineering Design Standards Public Comment

Proposed Improvements Bloomingrove Drive and US Route 4 Intersection US Route 4 Widening Winter Street Ext. Traffic Signal US Route 4 and Williams/Glenmore Intersection Alternative 1: Intersection widening, replace traffic signal Alternative 2: Roundabout Additional Sidewalk Locations

Proposed Improvements Bloomingrove Drive 5 4 4 3 1 3 1. Realigned Intersection with New Traffic Signal 2. Widening for Turn Lane and curbed median on Bloomingrove 3. Widening for Turn Lanes on US 4 4. Proposed Sidewalks 5. Western Leg for Commercial Development 4 2

Proposed Improvements Widening Bloomingrove to Valley View 4 3 4 2 1 1 1 3 1. Proposed Road Widening 2. Two-Stage Left-Turns 3. Multiple Parking Alternatives at Businesses 4. Proposed Sidewalk

Proposed Improvements Winter Street Ext. Traffic Signal 2 3 1 3 1. Winter Street Ext. Realignment 2. Coordinate Signal with Jordan Road 3. Proposed Sidewalk

Proposed Alternative Williams Road Traffic Signal 4 1. Proposed Traffic Signal 2. Widen for Turn Lanes 3. Bloomingrove Realignment 4. Sidewalks ROW Impacts = 0.22 Ac 2 1 2 4 3 2 4

Proposed Alternative Williams Road Roundabout 4 1. Roundabout 2 lanes SB and WB Traffic Calming Gateway to NG 2. Realign Bloomingrove 3. Driveway Access Control 4. Sidewalks ROW Impacts = 0.37 Ac 1 4 3 2 4

Roundabouts Why? FHWA Proven Safety Countermeasure 78-82% Reduction in Severe Crashes Improve safety for all users, including pedestrians and bicycles Applicable for both urban and rural locations Traffic Calming (24/7/365)

Roundabouts Vehicle Safety Source: FHWA Roundabout Guide, 2 nd Edition, Exhibits 5-1, 5-2

Proposed Alternative: Williams Road Traffic Signal

Proposed Alternative: Williams Road Roundabout

Alternative Analysis Criteria Traffic Signal Roundabout Safety Improvement Yes Yes++ Traffic Calming No Yes Proposed Peak Hour Level of Service Estimated Property Impacts LOS C 26 Sec. Delay 3 Properties (.22 Acres) LOS C 27 Sec. Delay 3 Properties (.37 Acres) Estimated Cost $1.5M $2.5M

Sidewalk Alternatives In 2017, the project team created a Planning Document to prioritize sidewalk improvements in the Corridor Criteria Evaluated Included: Known Pedestrian Generators Existing Facilities Logical Termini Topography Cost

Proposed Improvements: Sidewalks NY 43 to Valley View Drive Proposed Sidewalk 2200 along west side of Route 4 from NY Route 43 to Valley View Drive 350 along south side of Bloomingrove Drive to Van Rensselaer Shopping Plaza Connects Ped. Generators and Destinations

Proposed Improvements: Sidewalks Jordan Road to Williams Road Proposed Sidewalk 5900 along West side of Route 4 from Jordan Rd to Glenmore/Williams Rd Intersection (Stewarts) Minimal property impacts (Temporary Easement and/or grading release)

Project Schedule Draft Design Document Summer 2018 Preliminary Design Fall 2018 Detailed Design/Property Acquisition Winter 2018/2019 Project Out to Bid Fall 2019 Construction Begins Fall 2019

Public Comments/Questions Town Procedure for comments: Oral Comments Persons may make statements, and/or submit documents concerning the proposed project tonight. Written Comments emailed to the Town s Comptroller or Creighton Manning. Electronic Comments submitted through project website, https://route4corridorng.com/contact/ A copy of this presentation and display boards will be made available on the project website

We Appreciate Your Input! www.route4corridor.com Tony Germano Town Comptroller (518)-283-3525 agermano@northgreenbush.org -Or- Greg Gibbons Creighton Manning Engineering, LLP (518) 446-0396 ggibbons@cmellp.com Please submit comments within the next 14 days (June 19 th ). THANK YOU!!!!