Tips for Using & Printing Spreadsheets

Similar documents
Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

The Blue Heron Slough Conservation Bank

Environmental Review and Permitting for Wild Trout

FACT SHEET I. LOCATION

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Mountain Columbia Province

Report prepared for: Prepared by: January 2002 BEAK Ref

Warner Lakes Redband Trout

Big Spring Creek Habitat Enhancement and Fishery Management Plans

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Three Mile Creek 2011

MISSISSIPPI MAKEOVER A Plan for Restoration, Just Around the Bend

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

X.B WETLANDS ROGUE RIVER ESTUARY

Understanding the Impacts of Culvert Performance on Stream Health

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 18, 2017

Western native Trout Status report

Climate Change Adaptation and Stream Restoration. Jack Williams;

Cat Island Chain Restoration

Interim Guidance Fish Presence Absence

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

STREAM SURVEY File form No..

Presented by Fred Halterman, URS Jennie Agerton, URS

OPPORTUNITIES & CONSTRAINTS

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek.

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

Habitat Fact Sheets. Rocky habitats are dominated by seaweeds and often mussels, which rely on the rocks for attachment.

MCCAW REACH RESTORATION

Swimming against the tide gates. Paul Franklin

Eastern Brook Trout. Roadmap to

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins

RESTORING THE CONNECTION BETWEEN CREEK AND LAKE: FRESH WATER ESTUARINE CREATION IN MISSISSAUGA

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Brook Trout in Massachusetts: A Troubled History, A Hopeful Future

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Final Fish Salvage & Temporary Tailrace Barrier Report for the Wallowa Falls Hydroelectric Project Tailrace. (FERC No. P-308) December 20, 2018

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Site Tour, August 24, Fish Science - Big Lake Coho Salmon Migration and Habitat Use

Trout Buffer Variance

Three point plan to addressing land use and habitat loss impacts on Chesapeake Bay tidal fish and shellfish

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

STUDY PERFORMANCE REPORT

RESILIENCE THROUGH RESTORATION

RI Regulatory Setbacks & Buffers: Coastal Management Issues

Study Update Fish Distribution and Species Composition

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE Auburn, Washington Phone: (253) Fax: (253)

Information for File # SEW

Chagrin River TMDL Appendices. Appendix F

Columbia Lake Dam Removal Project

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Little Traverse Bay Watershed Road/Stream Crossing Inventory

Okanagan Sockeye Reintroduction

STEELHEAD SURVEYS IN OMAK CREEK

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

Implementing the New Fisheries Protection Provisions under the Fisheries Act

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

Stream Assessment. Date. Data Collected by. Location. Name of Stream and River Basin. Stream Order. Streambank Materials. Streambank Vegetation

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

INVASIVE SPECIES MANAGEMENT OPTIONS FOR THE DOS PALMAS AREA

UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION [RC0ZCUPCA0, 155R0680R1, RR ]

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM

Benchmark Statement Respecting the Fish, Fish Habitat and Fisheries of Fish and Little Fish Lake, within the Taseko River Watershed.

Management of headwater streams in the White Mountain National Forest

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

River Restoration: Culvers Island weir removals and river naturalisation project.

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Estuarine Shoreline Stabilization

1.Warm Springs Creek (Anaconda) Watershed Description and Land Use

Eastern Brook Trout Joint Venture Completed Project Report Form

Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit * Thanks to The Nature Conservancy

Study Update Tailrace Slough Use by Anadromous Salmonids

Fighting for Life in French Creek

Habitat Development: Habitat Boulders Lawson Pier Foreshore Enhancement

Packwood Hydroelectric Project Barrier Analysis December 12, 2006

Black Sturgeon Regional Plan

Advancing Fish Passage in the Menomonee River Watershed

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

1.Mill Creek Watershed Summary Description and Land Use

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek.

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Fairhaven Creek 2000

Design Assessment Checklist: Infiltration / Detention Basin

Does DFO Need to Review My Project?

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Texas Water Resources Institute

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

2014 Island Lake Survey June 13 th, 2014 Andrew Plauck District Fisheries Biologist Report Prepared 4 March 2015

JAP Additional Information Sheet

Restoring the Iconicc Lower Cache River

Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,

Western Pocono Chapter. Trout Unlimited. 67 West Butler Drive fc ^

Jason Blackburn, Paul Hvenegaard, Dave Jackson, Tyler Johns, Chad Judd, Scott Seward and Juanna Thompson

SKIATOOK LAKE MANAGEMENT PLAN

Everything a Lake Should Be

COMPENSATION LAKE DESIGN CONCEPTS AND CONSTRUCTION LESSONS LEARNED

Transcription:

Key to Spreadsheets Spreadsheet # Type Description/Purpose a Development & Construction in Waterways b Debits Development & Construction in Other Aquatic Areas c Indirect Impacts to Waterways from Development & Construction in Other Aquatic Areas a List of Waterway Polygons List b List of Other Aquatic Area Polygons a Normalization of WAMA Scores Normalization b Normalization of AWAM Scores a Restoration, Enhancement or Establishment of Waterways b-res Restoration of Other Aquatic Areas b-enh Enhancement of Other Aquatic Areas b-est Establishment of Other Aquatic Areas Credits c Assessment of Functional Improvement for Enhancement of Waterways d Assessment of Functional Improvement for Enhancement of Wetlands 5a Preservation of Waterways 5b Preservation of Other Aquatic Areas 6a Project Debits 6b Summary Project Credits 6c Debit-Credit Balance Tips for Using & Printing Spreadsheets To add a row within the body of a spreadsheet, click in any cell in the row below where you want the new row to be, then select "Row" from the "Insert" menu. You will also need to copy formulas into the new row. To do that, right-click on the row number (far left) above or below the new row and select "Copy;" right-click on the new row and select "Paste." To hide rows you don't need, highlight those rows, right-click anywhere in the highlighted area, and select "Hide." The row numbers (far left) for the hidden rows will also be hidden. To "unhide" those rows, highlight the row numbers above and below, right-click and select "Unhide." Follow the same procedure for hiding columns. To hide spreadsheets you don't need, click on the spreadsheet tab and select "Sheet," then "Hide" from the "Format" menu. To reveal a hidden spreadsheet, select "Sheet," then "Unhide" from the "Format" menu. Spreadsheets 6a through 6c auto-populate from other spreadsheets and will display error messages if you delete the source sheets. To print only the spreadsheets you used, click on the tabs for those spreadsheets, while holding down the "Ctrl" button, and then select "Active sheet(s)" in the "Print what" section of the Print dialog box. 5

Spreadsheet a: Debits for Development & Construction in Waterways Applicant: Waterway Name: Existing Polygons Direct Impacts New Indirect Impacts Z. K. L. M. N. O. P. Q. R. S. T. U. V. W. X. Y. Existing Indirect Financial Impacts Impacts Assurance Duration of New Total Note # Debit Size of Permanent Size of Using ID's for Temporary ID's Indirect Debits Description Ratio Impact or Debits Impact Debits Standard or Temporary Impacts Impacts (U+Y) (sq ft/db) (sq ft) Temporary? (sq ft) Differentiated Impacts? (in days) (P or T)? (S or D) (Y or N) Sub- 0 Sub- 0 Sub- 0 /8/00

Sub- 0 0 Notes: /8/00

Spreadsheet b: Debits for Development & Construction in the Subtidal, Intertidal, Waterbodies, Wetlands & Certain Uplands Applicant: Name of Aquatic Area: Existing Polygons Direct Impacts New Indirect Impacts J. K. L. M. N. O. P. Q. R. S. T. U. V. W. X. Y. Existing Indirect Financial Impacts Impacts Assurance Duration of New Debit Permanent Using ID# Size for Temporary ID# Size Indirect Landform Description Ratio or Debits Debits Standard or (acres) Temporary Impacts (acres) Impacts (ac/db) Temporary? Differentiated? Impacts? (in days) (P or T) (S or D) (Y or N) Z. Total Debits (U+Y) Note # 0.00 Wetlands 0.00 0.00 0.00 Waterbody Intertidal Subtidal Uplands 0.00 Notes: /8/00

/8/00

/8/00

/8/00

Spreadsheet c: Debits for Indirect Impacts to Waterways from Development & Construction in Other Aquatic Areas Applicant: Waterway Name: Affected Waterway Polygons Affected Setback/Buffer Polygons P. Q. R. S. T. U. V. W. X. Y. Extent of Description New Direct Width of New Indirect ID's Debit Ratio Pre-project Impacts in Description Encroachment Impacts (ac/db) Width Setback or (feet) Buffer (acres) Setback.0 Buffer.5 Setback.0 Buffer.5 Setback.0 Buffer.5 Setback.0 Buffer.5 Sub-totals Setback.5 Buffer.5 Setback.5 Buffer.5 Setback.5 Buffer.5 Setback.5 Buffer.5 Sub-totals Setback.0 Setback.0 Setback.0 Setback.0 Setback.0 Setback.0 Sub-totals Setback.5 Setback.5 Setback.5 Setback.5 Setback.5 Setback.5 Notes: Sub-totals Z. Debits [(X/U)x(W/V)xY] Note # /8/00

Spreadsheet a: List of Waterway Polygons Applicant: Sheet/Figure # Depicting Polygon #'s (list by sheet, if more than one): Q. R. S. T. U. V. W. X. Y. Z. Existing Indirect Impacts s Right Left Polygon ID Polygon Description Upstream Downstream Descending Descending Size Aggregate Polygon Size In-channel In-channel Bank Bank /8/00

Spreadsheet b: List of Subtidal, Intertidal, Waterbody, Wetland & Upland Polygons Applicant: Sheet/Figure # Depicting Polygon #'s (list by sheet, if more than one): N. O. P. Q. R. S. T. U. V. W. X. Y. Z. Landform Polygon ID Polygon Description Within Existing Indirect Impact (s) of Category Activity? Category Activity? Category Activity? Existing Indirect Impacts s Category Category Category Size Aggregate Polygon Size Wetlands Waterbody Intertidal Subtidal Uplands /8/00

Spreadsheet a: Normalization of WAMA Scores for Waterways Applicant: V. W. X. Y. Z. Function Score Highest Possible Score HYD 0 HAB 0 SPP 96 SOC 60 Normalized Score (W/X) Contribution to Overall WAMA Score [(Y/ Y)x00%] /8/00

Spreadsheet b: Normalization of AWAM Scores for Wetlands Applicant: V. W. X. Y. Z. Function Score Highest Scores for Sub-area HYD 9 HAB 90 SPP 7 SOC 0 ANCHORAGE BOWL WETLANDS (i.e., AWMP Units #-86A) Normalized Score (W/X) Contribution to Overall AWAM Score [(Y/ Y)x00%] V. W. X. Y. Z. Function Pre-project Score Highest Scores for Sub-area HYD HAB 77 SPP 7 SOC 8 KNIK ARM WETLANDS (i.e., AWMP Units #00-50) Normalized Score (W/X) Contribution to Overall AWAM Score [(Y/ Y)x00%] V. W. X. Y. Z. Function Pre-project Score Highest Scores for Sub-area HYD HAB 0 SPP 96 SOC 6 TURNAGAIN ARM WETLANDS (i.e., AWMP Units #60-9) Normalized Score (W/X) Contribution to Overall AWAM Score [(Y/ Y)x00%] /8/00

Spreadsheet a: Credits for Restoration, Enhancement or Establishment of Waterways Name of Project to which Credits Apply: Waterway Name: L. M. N. O. P. Q. R. S. T. U. V. W. X. Y. Z. Post-project Indirect Post-Project Polygons Pre-Project Polygons Impacts Extent Credit Contribution to Type of ID's Size Function(s) Function Credits Improvement Ratio Overall Score Activity (if nec.) (sq ft) Improved Improved [(V/R)xTx(+X)xY] Description Description (P-M) (sq ft/cr) (from SS a) (from SS c) Using Standard or Differentiated? (S or D) Note # Sub-totals RES Sub-totals Sub-totals Sub-totals ENH Sub-totals Sub-totals Sub-totals Sub-totals EST Sub-totals Sub-totals Notes: /8/00

/8/00

Spreadsheet b-res: Credits for Restoration of the Subtidal, Intertidal, Waterbodies, Wetlands & Uplands Name of Project to which Credits Apply: Name of Aquatic Area: L. M. N O. P. S. T. U. V. W. X. Y. Z. Q. R. Post-project Indirect Pre-Project Polygons Impacts Landform Description Description Improvement (P-M) Credit Ratio (ac/cr) Using Standard or Differentiated? (S or D) ID's Size (acres) Functions Improved Extent Function Improved (fr SS d) Contribution to Overall Score (from SS b) Credits [(V/R)xTx(+X)xY] Note # Sub-totals Wetlands Sub-totals Sub-totals Sub-totals Waterbody Sub-totals Sub-totals Intertidal Sub-totals Sub-totals Subtidal Sub-totals Sub-totals Restoration Notes: /8/00

Spreadsheet b-enh: Credits for Enhancement of the Subtidal, Intertidal, Waterbodies, Wetlands & Uplands Name of Project to which Credits Apply: Name of Aquatic Area: L. M. N O. P. S. T. U. V. W. X. Y. Z. Post-Project Polygons Pre-Project Polygons Q. R. Post-project Indirect Impacts Extent Contribution ID's Size Functions Function to Overall (acres) Improved Improved Score Description Description (fr SS d) (from SS b) Landform Improvement (P-M) Credit Ratio (ac/cr) Using Standard or Differentiated? (S or D) Credits [(V/R)xTx(+X)xY] Note # Sub-totals Wetlands Sub-totals Sub-totals Sub-totals Sub-totals Waterbody Sub-totals Sub-totals Sub-totals Uplands Sub-totals Sub-totals Intertidal Sub-totals Sub-totals Subtidal Sub-totals Sub-totals Enhancement Notes: /8/00

Spreadsheet b-est: Credits for Establishment of Subtidal, Intertidal, Waterbodies, Wetlands & Uplands Name of Project to which Credits Apply: Name of Aquatic Area: L. M. N O. P. S. T. U. V. W. X. Y. Z. Post-Project Polygons Pre-Project Polygons Q. R. Post-project Indirect Impacts Extent Contribution ID's Size Functions Function to Overall (acres) Improved Improved Score Description Description (fr SS d) (from SS b) Landform Improvement (P-M) Credit Ratio (ac/cr) Using Standard or Differentiated? (S or D) Credits [(V/R)xTx(+X)xY] Note # Sub-totals Wetlands Sub-totals Sub-totals Sub-totals Sub-totals Waterbody Sub-totals Sub-totals Intertidal Sub-totals Sub-totals Subtidal Sub-totals Sub-totals Establishment Notes: /8/00

Spreadsheet c: Assessment of Functional Improvement for Enhancement of Waterways Name of Project to Q. R. S. T. U. WAMA Parameters Percent Preprojecproject Post- Function Function # Description Improved Score Score ( U- T) / T) HYD HAB SPP SOC a b c d e f g h i j a b c d e f g h i j a Source of Stormwater Input Position in Watershed Vulnerability to Flooding Bankfull Discharge Constriction Ratio Channel Sinuosity Sensitivity to Water Quality Degradation Pollutant Uptake & Filtration Pollutant Sources in Catchment Basin Entrenchment Ratio Bank Stability Diversity of Channel Form Riffle Frequency/Sinuosity Density of Instream Habitat Structures Embeddedness/Suitability of Pool Substrate Average Width of Stream Buffer Availability of Off-channel Refuge Habitat Extent of Bank Vegetation Persistence & Seasonality of Flow Wetted Perimeter Pollutant Inputs Use by Birds or Anadromous Fish Significant to the Municipality V. W. X. Y. Z. Parameter # Aquatic Wildlife Passage Barriers Pre-project Value b Significance for Fish Spawning Channel Constriction e See Table at Right Ratio c Significance for Fish Rearing f Bed Gradient d Aquatic Macroinvertebrates: EPT Taxa Richness g Low Flow Depth h Perch Height a Existing Recreational Use Total Percent Improvement b Educational Use c Existing Facilities & Programs d Types of Aesthetic Disturbance e Extent of Aesthetic Disturbance f Existing Research/Studies g Identification as Parkland h Ownership & Accessibility Post-project Value Percent Parameter Improved (Y-X)/X) Credits earned only through Improvement; Spreadsheet c not applicable. Enter "All" in Column W of Spreadsheet a. Credits earned through either Improvement (Spreadsheet c not applicable) or Improvement of Function. Not subject to change/not a source of credits. /8/00

Spreadsheet d: Assessment of Functional Improvement for Enhancement of Wetlands Name of Project to which Credits Apply: V. W. X. Y. Z. AWAM Parameters Percent Preprojecproject Post- Function Function # Description Improved Score Score ( Y- X) / X) HYD HAB SPP SOC.....5.6.7.8.9.0........5.6.7.8.9.0.........5.6.7.8.9.0......5.6.7.8.9.0 Type of Stormwater that Wetlands Detains Position of Wetlands within Watershed Land Use along Waterway or Wetlands Size Evaluation Wetlands Area as % of Catchment Basin Size Subject Wetlands as % of Total in Catchment Basin Site Type (Cowardin Classification) Sensitive Areas below Subject Wetlands Area Dominated by Robust Emergents & Submergents Generalized Land Use in Catchment Basin Long-term Nutrient Trap Water Quality Maintenance Erosion Buffer Vegetation Community Structure Number of Wetlands Plant Communities Intraspersion/Edge Effect of Community Types Diversity of Surrounding Habitat Proximity to Other Wetland Habitats Open Water Types Hardiness Soils Type Type of Wetland Nutrient Status of Surface Water Surface Water Persistence Water Body Size Wetland Contiguity with Stream or Lake Wetland Size Habitat for Plant Species of Statewide Significance Use by Birds or Fish Significant to the Municipality Habitat for Plants Rare or Unique in the Municipality Scarcity Value Nesting of Colonial Waterbirds Waterfowl Staging Waterbird Production Breeding Bird Diversity Migratory Bird Staging Area Significance for Fish Spawning Significance for Fish Rearing Type of Wetland-associated Recreational Use Educational Use Facilities and Programs Landscape Distinctness Types of Disturbance Degree of Disturbance/Aesthetic Values Public Use/Open Space Value Land Identification as Parkland Research and Studies Ownership/Accessibility Credits earned through either Improvement (SS c not applicable) or improvement of function. Not subject to change; not a source of credits. /8/00

Spreadsheet 5a: Credits for Preservation of Waterways Name of Project to which Credits Apply: Project Proponent: Waterway Name: P. Q. R. S. T. U. V. W. X. Y. Z. Polygon Description Regulatory Constraints Accessibility Threat (SxT) Credit Ratio (ac/cr) Post-project Indirect Impacts Using Standard or Differentiated? (S or D) ID# Size (sq ft) Credits [(Y/U)xW] Note # Sub-totals Sub-totals Sub-totals Sub-totals : Notes: /8/00

Spreadsheet 5: Credits for Preservation of the Subtidal, Intertidal, Waterbodies, Wetlands & Certain Uplands Name of Aquatic Area: Name of Project to which Credits Apply: O. P. Q. R. S. T. U. V. W. X. Y. Z. Landform Polygon Description Regulatory Constraints Accessibility Threat (SxT) Credit Ratio (ac/cr) Post-project Indirect Impacts Standard or Differentiated? (S or D) ID# Size (acres) Credits [(Y/U)xW] Note # Sub-totals Wetlands Sub-totals Sub-totals Sub-totals Sub-totals Waterbody Sub-totals Sub-totals Sub-totals /8/00

Sub-totals Uplands Sub-totals Sub-totals Sub-totals Intertidal Sub-totals Sub-totals Subtidal Sub-totals Sub-totals : Notes: /8/00

Applicant: Spreadsheet 6a: Project Debit Summary Number of Debits per Landform S. T. U. V. W. X. Y. Z. Subtidal Intertidal Total Debits Waterways Waterbodies Wetlands Uplands (T+U+V+W+X+Y) N/A 0.00 0.00 N/A 0.00 N/A N/A 0.00 0.00 /8/00

Applicant: Spreadsheet 6b: Project Credit Summary Name of Project to which Credits Apply): R. S. T. U. V. W. X. Y. Z. Type of Project Subtidal Restoration Enhancement Establishment Preservation Intertidal Number of Credits per Landform Waterways Waterbodies Wetlands Uplands Total Credits (T+U+V+W+X+Y ) N/A N/A 0.00 N/A 0.00 N/A N/A 0.00 N/A 0.00 0.00 N/A 0.00 N/A N/A N/A N/A 0.00 N/A N/A 0.00 N/A 0.00 N/A N/A 0.00 N/A 0.00 0.00 N/A 0.00 N/A N/A 0.00 0.00 /8/00

Spreadsheet 6c: Project Debit-Credit Balance Applicant: Name of Project to which Credits Apply: Q. R. Number of Credits by Project Type S. T. U. V. W. Debits Restoration Enhancement Establishment Preservation Total (S+T+U+V) 0.00 0.00 0.00 0.00 N/A 0.00 N/A 0.00 X. Net (W-R) Y. Redistribution of Excess Credits Z. Balance (X+Y) 0.00 Credits offset debits on a one-to-one basis, regardless of (or cost). Applying excess credits to net debits of a higher is contingent on a determination by the lead federal agency that the project that produced the excess credits constitutes appropriate compensatory mitigation for the debits. Positive numbers represent net credits and negative numbers net debits. /8/00