New Licensed Asbestos Manager Training

Similar documents
New Licensed Asbestos Operative Training

Refresher Licensed Asbestos Supervisor Training

Level 4 Certificate in Asbestos Removal for Contract Managers

Syllabus for Licensable Work with Asbestos (Category C)

SOUTHBANK PLACE Asbestos Removal (Brief Guide)

Site Details. Comments / Corrective Actions Required. Preliminary Requirements Y N N/A SITE MONITORING PROCEDURE ASBESTOS AUDIT FORM.

Introduction. B1) Initial training with NO previous asbestos awareness training undertaken;

UK ASBESTOS TRAINING ASSOCIATION GUIDANCE

SYLLABUS RESPIRATORY PROTECTIVE EQUIPMENT COMPETENT PERSON

Proficiency Module Syllabus. P601 - Thorough Examination and Testing of Local Exhaust Ventilation Systems

Estates & Facilities Management - Management and Control of Asbestos Policy and Procedures

Rainham Industrial Services Ltd. Plan of Works

New Asbestos Analyst Guide

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

Exposure Control Plan for Drilling/Grinding Concrete

OPERATIONAL GUIDELINE P R O C E D U R E

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Working safely in an engineering environment

ARCA Guidance Note. Guidance on Air Management in Asbestos Enclosures

The routine maintenance and inspection of local exhaust ventilation (LEV)

Abrasive Blasting Removal Systems

Asbestos Regulation and Compliance

R2D2P. Working group report

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra)

Safe Work Practices / Procedures / Instruction ASBESTOS. (See also Asbestos Exposure Control Plan )

BHC-P-07.2 Health Hazards in Construction

Understanding health and safety in gas utilisation

Training operatives and supervisors for work with asbestos insulation and coatings

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

RPE with a UK Standard Assigned Protection Factor 10 (APF10)

ASBESTOS STANDARD SYSTEMS OF WORK

Health & Safety Policy HSP 08 Control of Substances Hazardous to Health (COSHH) Version Status Date Title of Reviewer Purpose/Outcome

Personal Protective Equipment

WILL NOT DISTURB ASBESTOS CONTAINING MATERIAL!

Asbestos Operations and Maintenance Plan

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

UETTDRRF06B PERFORM RESCUE FROM A LIVE LV PANEL LEARNER GUIDE

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

NUS Safety & Health Guidelines Procedure No: OSHE/SOP/GL/08

THICKNESSER RISK ASSESSMENT (U003ra)

Personal Protective Equipment

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Sewage

A Checklist for a Health and Safety Risk Assessment

Contractor handbook. Purpose

Control of Allergies to Laboratory Animals

UNIT TITLE: CLEAN PUBLIC AREAS, FACILITIES AND EQUIPMENT NOMINAL HOURS: 60 hours

QCF Unit and Assessment Specification

Module: Permit to work System

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Cabinet. 1.0 POLICY It is the policy of Calvin College to comply with the MIOSHA Respiratory Protection Standard Part 451.

OPERATIONL RISK ASSESSMENTS

Asbestos Management Plan

In an emergency the safety of all personnel and the public is of priority.

FIRE HYDRANT TESTING METHOD STATEMENT.

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

Section1. Knowledge of RPE Sets out the minimum knowledge requirements in respect of respiratory protective equipment. [Mandatory] 1.

BEGINNING THE MEETING

Standards of Practice Personal Protective Equipment

PART 4: IMPLEMENTATION & OP

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2

PRESSURE SYSTEMS POLICY

LEGIONELLA CONTROL POLICY

LIFT MAINTENANCE POLICY

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT

List materials, trade names (if applicable), and where they are found on the site:

Hazardous Materials Management. Presented by. James E. Roughton, MS, CSP, CRSP, CHMM.

Recognition, Evaluation, and Control of Hazards

Bitumen Delivery Driver Inductions Eurobitume UK

T: E: W: Health Safety Quality Environment. Online training courses

Don t let a fall shatter your life!

SAFETY AND HEALTH IN THE USE OF CHEMICALS AT WORK

PLAN OF WORK. Site Address Block 1 4 to 21 Fountain Place Brixton Lambeth SW9 7RE INDEX

CSTMC Asbestos Management Policy and Procedures

HAZARDOUS INCIDENT SITE SAFETY PLAN

In addition to the responsibility for managing the elements of the respiratory protection program, he/she will be responsible for:

LONE WORKING HEALTH AND SAFETY GUIDANCE

RR988 Prepared by the Health and Safety Executive 2015

Laboratory Self Inspection Checklist LAB01

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

Compliance with Health & Safety legislation

ALBUQUERQUE PUBLIC SCHOOLS RESPIRATORY PROTECTION PROGRAM

Hot tubs for Business why you need the PWTAG publication. Janice Calvert MSc,CChem,FRSC,FRSPH,FPWTAG Chair PWTAG

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5

Work Equipment: LOCAL EXHAUST VENTILATION

TOOL BOX TALK NO3. Use of P.P.E

Managing worker exposure to dust in mines and quarries

PERSONAL PROTECTIVE EQUIPMENT GUIDANCE

Maintaining electrical equipment/systems

THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH) POLICY

RESPIRATORY PROTECTION PROGRAM

Control of Substances Hazardous to Health

Accident/Incident Reporting and Investigation Procedures

CONTRACTOR SAFETY INDUCTION HANDBOOK

Transcription:

TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Manager Training This unit has twenty-three learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials a) Describe the types of asbestos fibres including characteristics, uses, identification methods, nature and levels of risk for different groups of asbestos containing materials b) Outline history of import, manufacture and installation of different asbestos containing materials c) Explain the types of products that may contain asbestos and their likely locations d) Describe previous treatment methods covering old asbestos applications e) Describe asbestos containing materials friability, the conditions when they will release fibres and the need for control f) Evaluate the risks of emergency and remedial work

2. Recognise the health hazards of asbestos a) Describe how fibres cause disease b) Explain the types of asbestos-related diseases and how related to exposure c) Explain the requirements for medicals under CAR d) Describe the need for dust / fibre suppression to control exposure e) Explain the need for correct use / maintenance of RPE f) Describe the health effects of smoking and risks of taking home asbestoscontaminated equipment / clothing g) Explain the employers legal responsibilities including civil vs. criminal law Page 2 of 20

3. Demonstrate a knowledge of Asbestos Related Legislation a) Evaluate the duties of the individual b) Analyse the key duties of the employer c) Outline the licensing framework d) Describe the control of exposure e) Outline the Control of Asbestos Regulations 2006 f) Outline the requirements of the ACOP and associated guidance g) Outline the Waste Regulations and Environmental h) Protection Act (1990) i) Explain which work requires a licence j) Explain the types of insurance cover required k) Outline the sources on information available on asbestos containing materials and their removal and evaluate their application to specific tasks Page 3 of 20

4. Understand the requirements of site set up, maintenance and dismantling a) Evaluate the requirements for Site Set Up to include: I. Describe the need for pre-cleaning and the use of H-type vacuum cleaners II. Outline site layout including the citing of hygiene unit as close to enclosure as possible III. Describe the optimal positioning of air / baglocks and negative pressure unit and an explanation of how they work and the significance of the voltmeter and pressure gauges and what changes in the gauge readings mean IV. Identify when pre-filters should be changed V. Outline the strategy for calculating air changes VI. VII. VIII. IX. Describe the connection and testing of hygiene unit Describe the construction of enclosures, air / baglocks including possible weather protection Explain the positioning of clear viewing panels Explain the positioning and wording for warning notices and barriers X. Describe how to delineate work areas and transit routes XI. Explain smoke testing and need for witnessing Page 4 of 20

a) Evaluate the requirements for Site Maintenance: I. Explain the need for daily inspections of enclosure (start, middle and end of shift) and immediate rectification of defects II. Explain the strategy for negative pressure units to be kept running after stripping finishes for the day b) Evaluate the requirements for Site Dismantling: I. Describe actions once clearance achieved, spraying enclosure with sealant, bag and seal vacuum cleaners, bag other equipment, dismantle polythene and dispose of as asbestos waste II. Describe the final inspection of area once enclosure and all associated equipment have been removed Page 5 of 20

5. Understand the requirements of controlled stripping techniques a) Describe the principles of fibre suppression and control of exposure b) Explain the use, maintenance and cleaning of equipment c) Explain the use of wet injection and spraying techniques d) Explain the use of wrap and cut e) Explain the use of glove bags f) Explain the use of direct vacuuming g) Explain the use of LEV (shadow vacuuming) h) Explain the use of vacuum transfer i) Explain the use of air management j) Describe preparation time and testing of controls before removal k) Describe wetting agent selection, preparation and use l) Outline COSHH requirements m) Explain anticipated and desired fibre levels and comparison with RPE maximum exposure levels n) Analyse personal assessment monitoring (principles) and access to personal assessment information o) Explain the requirements for equipment inspections and record keeping p) Describe the monitoring arrangements for the effectiveness of fibre control techniques and the requirement of recording this information Page 6 of 20

q) Explain equipment and wetting agent selection r) Describe maintenance and training requirements 6. Understand the requirements of respiratory protective equipment a) Describe the circumstances when respiratory protective equipment must be worn b) Explain how to inspect, test and wear respirator c) Describe the need for quantitative face-fit test, a good face seal and the need to be clean shaven d) Explain correct storage, battery charging and keeping clean e) Explain the strategy for changing pre-filters and main filters 7. Understand the requirements of personal protective equipment and clothing a) Describe the use of the appropriate personal protective equipment including: overalls, headgear, footwear and gloves b) Assess the employer requirements to provide appropriate personal protective equipment and employees obligations to use it c) Explain the requirement for care, wearing, cleaning, decontamination and / or disposal of personal protective equipment and not taking contaminated personal protective equipment home d) Describe when and where personal protective equipment should be worn e) Explain the correct use and maintenance of personal protective equipment the practical difficulties of wearing personal protective equipment. Page 7 of 20

8. Understand the requirements of transit procedures and decontamination a) Explain personal decontamination procedures for directly connected and remote (transit) decontamination units and airlocks including: personal protective equipment changing and disposal, showering, colour coding of coveralls, respiratory protective equipment decontamination, cleaning, charging and storage b) Explain the use of towels c) Explain the changing and disposal of pre and main respiratory protective equipment filters d) Describe decontamination procedures where no enclosure or DCU is required (open sites) e) Assess common problems with decontamination and their remediation f) Describe cleaning of airlocks and decontamination units including air monitoring results in decontamination units g) Explain emergency decontamination in case of evacuation or accident h) State what should be in the decontamination unit i) Explain the requirements for the inspection of decontamination units and the keeping of records and the interpretation of audit and inspection results j) Describe the importance of making time available to allow adequate showering k) Describe the importance of ensuring that adequate equipment, materials and resources are made available to put the procedures in place Page 8 of 20

9. Understand the requirements of cleaning and clearance air testing a) Explain the cleaning and clearance requirements, including the need for the four-stage clearance process and associated certificate of reoccupation b) Describe visual cleanliness and air testing requirements c) State the methods of cleaning for enclosures, hygiene facilities and equipment d) Explain the requirement for re-cleaning in event of air test failure e) Explain the requirement for cleaning after enclosure dismantling f) Explain the requirement for cleaning in the event of an emergency or enclosure/equipment damage 10. Understand the requirements of plant and equipment a) Explain equipment components b) Explain equipment use and maintenance including: negative pressure units, monitors, Type H vacuums and injection equipment c) Explain the siting and daily maintenance of the decontamination unit d) Explain the requirement that all new equipment meets BS 8520: Equipment used in the controlled removal of asbestoscontaining materials Page 9 of 20

11. Understand the requirements of waste management and disposal a) Explain the waste regulations including the use of consignment notes, registration of carriers, the role and powers of environment agencies and transportation of hazardous goods b) Explain the requirements of bagging, sealing and cleaning c) Explain transportation through baglock and airlock d) Describe the requirements for storage of asbestos waste e) Describe the correct loading of skip / van Page 10 of 20

12. Understand the requirements of emergency procedures a) Describe what to do in the event of major and minor injuries or illnesses occurring inside live enclosures b) Evaluate procedures in the event of fire, or some other hazardous release such as toxic gas or radioactive dust occurring inside or outside enclosure c) Describe what to do a if leak of asbestos is found outside the enclosure d) Describe what to do if power on powerassisted respirator fails while inside a live enclosure e) Describe what to do if the NPUs (Negative Pressure Unit) stop working f) Describe what to do if there is complete loss of electrical power g) Describe what to do if loss of water supply to hygiene unit h) Explain the requirement of assessing the competence of operatives and supervisors i) Explain the importance of auditing and monitoring work activities j) Explain the notification of asbestos work k) Describe the requirements to confirm emergency procedures are in place and appropriate to specific sites and circumstances Page 11 of 20

13. Recognise potential non-asbestos hazards associated with asbestos removal a) Explain the requirements of site safety procedures b) Describe permit-to-work systems c) Explain entry and exit procedures in case of fire d) Describe the location of possible site hazards e) Explain emergency procedures in case of fire, electric shock, burns, hazardous substances, solvents etc f) Describe the care of an injured casualty g) Assess potential hazards such as manual handling, noise, vibration and falling object protection, slips, trips and falls 14. Recognise common faults associated with asbestos removal a) Evaluate how to spot problems with the wetting of asbestos containing materials, respiratory protective equipment, airlocks, enclosures and hygiene unit b) Evaluate problems with plans of work, risk assessments, signage, record keeping and fault finding procedures Page 12 of 20

15. Understand the roles and responsibilities within an asbestos removal company a) Explain the requirement to ensure everyone complies with regulations, approved codes of practice, guidance and follows the risk assessment and plan of work. b) Explain the requirement to ensure that if the work method has to change - work is stopped and reassessed. The risk assessment and plan of work are amended and personnel informed of the changes in writing c) Explain the requirement to ensure all personnel are instructed, face-fitted and have received a medical d) Explain the requirement that all equipment is inspected and tested e) Explain the requirement that all daily inspections are carried out f) Explain the importance that all documentation is available and up to date g) Explain the importance of a supervisor being on site for key stages of the work and their crucial role in directing the work and monitoring standards of work h) Explain the need to ensure that all activities and training meet the legal requirements Page 13 of 20

16. Recognise the need for site inspections and record-keeping a) Explain the need, purpose and criteria of site b) inspections, site auditing and record keeping c) Analyse the actions taken in the event of faults d) Describe the role of inspectors / auditors e) Explain the responsibilities of operatives f) Explain the requirement of reporting faults and other problems including the use of typical record and reporting systems g) Explain the requirements of retention of data and data handling including exposure and health surveillance h) Explain the methods and criteria for site inspections and audits i) Describe how to interpret and monitor results including fault finding and solutions Page 14 of 20

17. Understand the requirement for management systems and monitoring a) Explain the requirement for the maintenance and b) monitoring of control measures c) Describe the requirement for controlling exposure to asbestos d) Explain the requirement for ensuring that equipment functions correctly e) Explain the requirement for pre-start setting-up f) Explain the requirement for barriers and signs g) Explain the requirement for the construction and testing of enclosures and airlocks h) Outline the requirements of site monitoring i) Explain the use / testing of negative pressure equipment and ventilation and air management systems j) Describe the correct maintenance of all site equipment, following manufacturers operating instructions, including the correct maintenance and monitoring of the following control measures: enclosures, external services, negative pressure systems, wet strip units, mobile generators, water supply, heating appliances, PPE, RPE, dust suppression equipment, tools and DCUs k) Explain the requirements for site supervision and record keeping of work in progress including monitoring and auditing l) Describe the requirements for ensuring that the work matches the plan of work Page 15 of 20

18. Understand the requirements for risk assessments and plans of work a) Explain the process of carrying out risk assessments, b) describing the main points and stating the right to see significant findings c) Describe the requirements to follow risk assessments and the risks / penalties if they are not followed d) Explain the meaning of the control limits e) Explain the process of developing a plan of work f) Explain the requirements for changes and amendments to plans of works and risk assessments including seeking of advice and recording of changes g) Explain the requirements and process for notification to the enforcing authority when changes are significant including a definition of what is a significant change h) Describe the importance of reviewing risk assessments and plans of work i) Explain the requirements of record keeping and storage of risk assessments and plans of work 19. Understand the requirements for information, instruction & training a) Explain how to implement and monitor onjob training b) Describe how to assess the competence of employees c) State the types of training available and how to choose the right course d) Explain how training needs analysis works in practice e) Describe the requirement for additional training when new equipment or work methods are introduced Page 16 of 20

20. Understand correct decontamination and transit procedures a) Explain the design, connection and citing of a decontamination unit b) Demonstrate preliminary and full decontamination procedures and the se of personal protective equipment and respiratory protective equipment in a hygiene unit that is plumbed in and fully operational and mock airlock / enclosure 21. Understand use & maintenance of respiratory protective equipment a) Explain how to ensure the respiratory protective equipment is suitable for the user b) Demonstrate how to fit respiratory protective equipment on site c) Assess faulty respiratory protective equipment and explain what to do if a fault is found d) Identify the components of each type of respiratory protective equipment e) Explain the requirements of certification and documentation; f) Explain the requirements of suitable storage g) Explain the requirements of daily and monthly inspections Page 17 of 20

22. Understand the construction of enclosures and airlocks a) Explain the construction of an enclosure on a pre-erected 50 mm x 50 mm timber framework using 1000 gauge polythene sheeting, adhesive tape and staples b) Explain the construction of a three-stage airlock system on a pre-erected 50 mm x 50 mm timber framework using 1000 gauge polythene sheeting and adhesive tape c) Explain the construction of a three-stage airlock system using metal and / or plastic framework d) Explain the construction of a proprietary airlock system e) Explain the use and location of viewing panels f) Explain the use and location of warning signs g) Explain smoke testing to determine integrity h) Explain the construction and location of baglocks 23. Understand the use of controlled stripping techniques a) Explain the connection and use of an injection system to wet pipe insulation determining that needles are the only effective way to wet insulation b) Explain shadow or trace vacuuming through the removal of a tile or duct panel using this technique Page 18 of 20

Outline of Course Content This course provides the necessary knowledge, understanding and skills required of asbestos removal projects. Successful completion of the course will allow candidates to undertake asbestos licensed works in accordance with the Control of Asbestos regulations 2012 and all associated Codes of practice Training is in accordance with Regulation 10 of Work with materials containing asbestos, Control of Asbestos Regulations 2012, Approved Code of Practice and guidance (L143) and Chapter 4 of Asbestos: The licensed contractors guide (HSG247) Outline of Proposed Learning Activities / Approach to Delivery The training will cover the topics in appropriate detail, by means of both written and oral presentation, and by demonstration as necessary. Outline of Resources / Bibliography (as appropriate) Control of Asbestos Regulations 2012 Asbestos: The licensed contractors guide (HSG247) Asbestos: The survey guide (HSG264) Asbestos essentials: A task manual for building, maintenance and allied trades on non-licensed asbestos work (Second edition) (HSG210) A comprehensive guide to managing asbestos in premises (HSG227) Asbestos: The analysts guide (HSG247) Page 19 of 20

Assessment Methods / Tasks A question and answer session will be held at the end of each module to ensure each learner has reached the necessary level of understanding. Tutor assessment of learner performance during practical sessions with continual oral feedback. A timed, invigilated, closed-book written examination will be individually completed by each learner at the end of the course, with 80% being the pass mark. Assessment Evidence Written Assessment covering LO1-LO23 Grade Descriptors 80% pass mark (pass / fail) The end of course written paper will draw at least 40 short answer and multiplechoice questions from a module-based question bank, to include no less than three questions from each module. Completed exam papers are retained by the course provider. Page 20 of 20