PUBLIC LIGHTING APPROVALS NETWORK Assessment and approvals process for product suppliers

Similar documents
LED Lightsource-R High Bay - EU

LED Lightsource-R High Bay - EU

IMPACT IMPLEMENTATION REPORT (IIR) - AMENDMENT OF EXCHANGE AGREEMENT

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

SIROCCO. Robust high-pressure diecast aluminium housing. Computer aided design reflector. Graduated scale for accurate aiming.

gaf traffic 2015 capability statement

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

IECEx Certificate of Conformity

MARINE NOTICE MARINE NOTICE. Marine Notice 7/2012. Guidance on ECDIS for ships calling at Australian ports 7/2012

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

Specification For Water Meters. Pr10068

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

General Accreditation Guidance. User checks and maintenance of laboratory balances

SAFE WORK METHOD STATEMENT Part 1

AS/NZS :2010. Retroreflective materials and devices for road traffic control purposes AS/NZS :2010

National Standard for Commercial Vessels

Photometric Test Report

Australian/New Zealand Standard

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

First edition

Procedure: Pressure equipment safety

TEST REPORT. ACCORDING TO IES LM For. Samsung Electronics Co., LTD. 1,Samsung-Ro,Giheung-Gu,Yongin-City,Gyeonggi-Do 17113, Korea

23 November Exposure Scenario-related information for mixtures

AS/NZS :2017. Retroreflective materials and devices for road traffic control purposes AS/NZS :2017. Part 1: Retroreflective sheeting

GUIDE 2002 HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS

Industry Guidelines POLYETHYLENE (PE) PIPES AND FITTINGS FOR COMPRESSED AIR ISSUE 6.8

ChromaLit Extruded Linear

Planning for tennis in your Local Government Area. A resource from Tennis Australia

SPYDA TEMPORARY ANCHOR POINT

List all key terms and acronyms used in the procedure, and their definitions.

BCGA GUIDANCE NOTE 17

HAZARD MANAGEMENT PROCEDURE

Specific Accreditation Criteria Calibration ISO IEC Annex. Mass and related quantities

TECHNICAL MANUAL DHR60 LED. Den Haan Rotterdam MED96/98/EC

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

Procedure Instruction of program Pressurized Enclosure - Test Round 2017

Fiji Electricity Authority Transmission Unit 2 Marlow Street, Suva

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

Australian/New Zealand Standard

INSPECTION of PORTABLE and OXY FUEL GAS SYSTEMS

Netball Australia Bench Officials Accreditation Framework. Updated 2015

Safety Assessments Revised Toy Safety Directive 2009/48/EC

Slack adjuster setup and compliance to the NHVIM. Technical Advisory Procedure

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

Personal Protective Equipment

LM LUMEN MAINTENANCE TEST REPORT

Australian/New Zealand Standard

In Ground Buried Uplights

North Steyne SLSC Water Safety Policy

Netball Australia Bench Officials Accreditation Framework. Updated 2018

ISO INTERNATIONAL STANDARD. Natural gas Measurement of properties Volumetric properties: density, pressure, temperature and compression factor

GUIDANCE FOR THE APPLICATION OF EQUIPMENT CALIBRATION AND TRACEABILITY OF MEASUREMENTS ON INSPECTION BODIES

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

NOTES TO THE SPECIFICATION FOR RAISED PAVEMENT MARKERS. These notes are for guidance and are not to be included in the contract documents.

CLEANSPACE PRODUCT LIST

Australian Standard. Bourdon tube pressure and vacuum gauges AS

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

Football Lighting Policy & Requirements Season 2016

Removal of Lead-Based Paint

Height Safety Lifting Load Control

Maintaining electrical equipment/systems

Residential Road_Lighting Class S5

This document is a preview generated by EVS

NZQA registered unit standard version 3 Page 1 of 7. Plan electrical installations for explosive atmospheres

Use of Equipment to Undertake Work Over the Side on Yachts and Other Vessels

SLSA Policy Statement Water Safety

July Ballast Water Management FAQ

MARINE NOTICE MARINE NOTICE. Marine Notice 11/2012 Supersedes 15/2010 and 7/2012. Guidance on ECDIS for ships calling at Australian ports 11/2012

Operating instructions for variable area flow meter with needle valve. Model: UVR/UTR

PTB Ex PT Scheme. Procedure Instruction of program Explosion Pressure - Test Round 2017

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

Any use of this material except in accordance with a written agreement with Western Power is prohibited.

LED 14W POLO BULKHEAD WITH MICROWAVE SENSOR

SOLAS requirements for nonpassenger ships 300 or above but less than 500 gross tonnage

AWWF Policy Book V8. Modified. October S:\Policy_Operations\Policy Book\AWWF Policy V8 October 2014.doc

The routine maintenance and inspection of local exhaust ventilation (LEV)

TLILIC2001 Licence to Operate a Forklift Truck

SLSA Age Manager Course Participant Workbook. 2nd Edition

LED Wallpack 10 Series

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

TECHNICAL MANUAL DHR80 LED. Den Haan Rotterdam MED96/98/EC

Explosion Protection Technology Pty Ltd

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Instruction manual. HLSD-2 Circular Access Tank Cover IM-TE91K041-EN1 ESE Date of issue: August 29, 2012

TG GUIDELINES CONCERNING CALIBRATION INTERVALS AND RECALIBRATION

REFERENCE SPECIFICATION FOR END

Australian/New Zealand Standard

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Inspection Guide. Inspector Position Summary. Overview

Informal document regarding progress of CEN standards for reference in RID/ADR

AS/NZS :2013. Training and certification of occupational divers AS/NZS :2013. Part 2: Surface supplied diving to 30 m

TECHNICAL MANUAL DHR40 LED. Den Haan Rotterdam MED96/98/EC

Guidance on the Legal Obligations for Importers, Retailers and Distributors of Category 1 Fireworks

Elcometer Viscosity Cup. Operating Instructions

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

The Inspection and Maintenance of Gymnastics, Sports Hall, Fixed Play, Fitness and Sports Equipment

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Pressure Equipment Directive (PED) Directive 97/23/EC. Pressure Equipment (PED) --- Baltic Pressure Equipment Workshop Riga, November 2003

Transcription:

PUBLIC LIGHTING APPROVALS NETWORK Assessment and approvals process for product suppliers www.realaction.com.au 1 of 18

Prepared for Lighting Suppliers and Australia Public Lighting Approval Authorities Prepared by Ironbark Sustainability Suite 8, 70-80 Wellington St Collingwood 3066 ABN: 51 127 566 090 Ph. 1300 288 262 info@realaction.com.au www.realaction.com.au August 25, 2016 Ironbark Group Pty. Ltd. The information contained in this document produced by Ironbark Group Pty. Ltd is solely for the use of the Client identified on this page for the purpose for which it has been prepared and Ironbark Group Pty. Ltd undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of Ironbark Group Pty. Ltd. About this document This document provides suppliers of public lighting products with an overview of the processes and requirements involved in the assessment of their products as part of the Public Lighting Approvals Network (PLAN). PLAN is a service that Ironbark provides to assist Australian public lighting approval authorities and presents a centralised system for the assessment of new public lighting products and the sharing of information about these products. PLAN is facilitated by Ironbark Sustainability. For further questions relating to the Public Lighting Approvals Network, please contact PLAN@realaction.com.au, or Ironbark Sustainability on 1300 288 262. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 2 of 18

Contents 1 About PLAN... 4 2 What products can be submitted?... 4 3 The PLAN assessment process... 5 3.1 STEP 1: Preliminary Technical Assessment (PTA)... 7 3.2 STEP 2: Face-to-face meeting with approval authorities... 8 3.3 STEP 3: Independent Technical and Market Assessment (ITMA)... 9 3.4 STEP 4: Completed ITMA report distributed to approval authorities... 10 3.5 STEP 5: Approval discussions commence between supplier and approval authorities... 11 3.6 STEP 6: Product added to (AEMO) National Electricity Market Load Tables for Unmetered Connection Points... 11 3.7 STEP 7: Product approved for use... 11 4 Ironbark a NATA Accredited Inspection Body for Street Lighting... 12 5 Further Information... 13 6 Appendix 1 Further assessment details... 14 6.1 Required information... 14 6.1.1 PTA... 14 6.1.2 ITMA... 14 6.2 Details of assessment... 17 6.2.1 PTA... 17 6.2.2 ITMA... 17 6.3 Report generation... 18 6.3.1 PTA... 18 6.3.2 ITMA... 18 Tables & Figures Figure 1 - The PLAN assessment process... 6 PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 3 of 18

1 About PLAN The Public Lighting Approvals Network (PLAN) is a service that Ironbark provides to assist Australian public lighting approval authorities (typically Distribution Network Service Providers (DNSPs), councils and main road authorities). PLAN utilises a centralised system for the assessment of new public lighting products and the sharing of information about these products with these approval authorities. PLAN streamlines what was otherwise a time consuming and repetitive process for approvals bodies as well as lighting product suppliers. Where lighting suppliers in the past would be required to have their product assessed by each individual approval body, a single shared assessment is now generated and distributed to approval authorities for their consideration. As part of this process Ironbark offers high level advice and detailed technical assessments of new public lighting products. To support this process, Ironbark has sought and obtained National Association of Testing Authorities (NATA) accreditation as an Inspection Body, which means that we have been assessed by NATA and found to comply with the requirements of ISO/IEC 17020 (the International Standard governing the requirements of inspection bodies) and to be technically competent to inspect street lights against those requirements of AS/NZS 1158.6:2010 (this has recently changed to SA/SNZ TS 1158.6:2015) outlined in our Scope of Accreditation. As such, Ironbark can provide the NATA-endorsed Inspection Report that is required (as well as the range of other technical and market based assessments) to support submissions to the relevant approval authorities. Ironbark is also a member of the VicRoads Product Compliance Consultant Panel, and as such is approved to review a variety of products for VicRoads approval, including Category V LED road lighting luminaires. This document provides lighting suppliers with a detailed summary of the process involved in submitting a new product for assessment through PLAN. 2 What products can be submitted? Currently PLAN assesses and reports upon the following products. Luminaires Photo Electric Cells Lamps/light modules If you wish to submit a product not listed above please contact Ironbark to discuss. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 4 of 18

3 The PLAN assessment process Lighting products can be submitted for assessment as: 1. Non-standard (decorative) lighting (in which case only the technical requirements of an ITMA need to be met provided a client who wants to install the lights has been confirmed); or 2. Standard (non-decorative) lighting (in which case both the technical and broader market requirements of an ITMA need to be met) The typical process for assessing lighting products is illustrated in Figure 1 below and a more detailed description of each step of the process is outlined on the following pages. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 5 of 18

Figure 1 - The PLAN assessment process PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 6 of 18

3.1 STEP 1: Preliminary Technical Assessment (PTA) Step 1 of the assessment process is a Preliminary Technical Assessment (PTA). This is a visual assessment that gives an indication of the likelihood that a product will meet the Standard and the specific requirements of approval authorities. The results of the PTA identify where the product will not meet the Standard or the requirements of approval authorities, with advice on what should be done to meet these requirements. For standard lighting products, the key factors that determine whether it is worthwhile pursuing approval for a given luminaire include: 1. Does the product provide a benefit to the market? That is, does it improve on current products in terms of cost (operating) or energy efficiency, or does it increase competition for a particular product type? 2. Does the product provide suitable spacing (photometric performance) to replace one or more of the commonly used HID street lights used across Australia? Given 2. Above, as part of the PTA Ironbark recommend also undertaking spacing assessment to determine if the luminaire meets the minimum requirements of approval authorities. Depending on the outcomes of the PTA, Ironbark may recommend proceeding to Step 2 (below). A detailed report outlining the results of the PTA can be provided upon request. Undergoing NATA-approved testing is an expensive and time-consuming process, therefore a PTA seeks to ensure that time and money is not wasted on a product that clearly will not meet requirements. The PTA will not be able to provide the detail that laboratory testing can provide and is designed for guidance only. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 7 of 18

3.2 STEP 2: Face-to-face meeting with approval authorities Ironbark will organise a face-to-face meeting between the supplier, representatives from approval authorities (typically the Victorian DNSPs and VicRoads). Suppliers will be given 20 minutes to present their product, after which there will be a 40 minute period in which the approval authorities and Ironbark will inspect the product and provide comment. In order to road test the product installer's gloves, a standard supply cable, and spigots will be provided onto which luminaires can be installed. Suppliers will be expected to provide any tools necessary to install the product and access the control gear chamber. Approval authorities may request that the luminaire(s) be left with them for further analysis as part of this process. Written feedback in the form of brief minutes will be provided to the supplier after the meeting. It is recommended suppliers also take their own notes. Following the face-to-face meeting and implementation of any changes required by the approval authorities, suppliers may be invited to submit their product for a full Independent Technical and Market Assessment (ITMA). If however, there are significant design changes required, then suppliers may be asked to present to approval authorities again prior to submitting their product for an ITMA. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 8 of 18

3.3 STEP 3: Independent Technical and Market Assessment (ITMA) Following the PTA and road testing by approval authorities, the supplier will be required to submit the product for a full Independent Technical and Market Assessment (ITMA). A completed ITMA (that recommends the product for approval) provides a validation process to confirm relevant technical performance and market interest in new public lighting products prior to consideration of approval of the product by approval authorities. As outlined above, for standard lighting products the market assessment involves an assessment of whether or not the product will provide a benefit to the market. This takes into account the relative operating costs and energy efficiency of the product, whether or not the product would improve the level of competition in a given category of lighting, and also what type of incumbent lighting product the new product seeks to replace. For non-standard lighting products, the market assessment consists of confirming that there is an existing client committed to using the product. For both standard and non-standard lighting products, the technical assessment part of the ITMA is largely the same (spacing for non-standard lighting products will be assessed against already approved non-standard lighting products). This involves assessment of the product against the specific requirements of approval authorities. To confirm this, NATA-endorsed (or equivalent) reports will be required. The supplier may obtain the required reports from Ironbark or some other NATAaccredited facility (refer to Section 4 for details of the NATA-accredited services Ironbark offers). The following testing options are available: Option A - Ironbark or the supplier to obtain all necessary NATA-endorsed (or equivalent) test/inspection reports from 3rd party test/inspection facilities; Option B Obtain NATA-endorsed Inspection Report from Ironbark. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 9 of 18

3.4 STEP 4: Completed ITMA report distributed to approval authorities Once an ITMA has been completed, a report will be distributed to each of the approvals authorities associated with PLAN. The report will include a recommendation on whether approval authorities should consider the product for approval. Note that at any stage throughout the assessment process Ironbark will provide status updates to approval authorities, including draft assessment reports. Assessment status will be communicated as: 1. Under evaluation; or 2. Not recommended for approval at this time; or 3. Recommended for approval. As discussed above, Ironbark (having consulted with the supplier) may make a recommendation for a new light that is for: 1. Standard lighting 2. Non-standard (decorative) lighting Once a product is recommended for approval by Ironbark and the reports are provided to the relevant approval authorities, then the final approval rests with each individual approval authority. The PLAN process helps sift through the many lights on the market and provides a short list of the ones that are market ready to approval authorities. A recommendation from Ironbark does not mean the light will be approved by some or all approval authorities. At this stage different approval authorities will do different things depending on the product and their experience with the manufacturer. For example, it is common for some approval authorities to approve the product based on Ironbark s recommendation. Other approval authorities will further review the product and recommend changes to it. Others will complete a test installation. All approval authorities will need to consider their purchasing, maintenance and replacement processes in order to bring a new product into their system. All this can take some time and will vary by approval authority area and by product type. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 10 of 18

3.5 STEP 5: Approval discussions commence between supplier and approval authorities Usually suppliers will follow the Ironbark reports up to clarify the next steps for each approval authority and to identify whether there is anything the supplier can do to support these steps. Ironbark will sometimes follow up a particular recommendation with the approval authorities. We may choose to do this if it is something of particular importance to the sector. This is not part of the normal process and is not something Ironbark will commit to doing. 3.6 STEP 6: Product added to (AEMO) National Electricity Market Load Tables for Unmetered Connection Points If an approval authority decides to approve a particular product then the product s load value must be added to the National Electricity Market (NEM) Load Tables for Unmetered Connection Points (if it has not already done so). This will require the supplier to submit to AEMO a proposal that included a relevant unique description of the product, supporting statements from prospective users of the unmetered device (e.g. local government, distribution business, developer etc.) and evidence of the unmetered device load or energy consumption. Wherever possible, the unmetered device load should be derived from measurement tests conducted by a NATA accredited laboratory or overseas equivalent. Publication of the unmetered device load value in the NEM Load Table is not an approval to use the unmetered device and does not replace any obligation for an interested party, proposing to add an unmetered device to the NEM Load Table, to obtain appropriate approvals related to performance acceptance and acceptance of use for the unmetered device from Approval Authorities. For further information about the NEM Load Tables go to www.aemo.com.au/ 3.7 STEP 7: Product approved for use The final step before a product can be installed and used by an Approval Authority is to establish maintenance charges for the particular product. The ITMA report will be used to inform any decisions. Maintenance charges are usually established in consultation with the supplier, are based on capital costs, parts lifespan and parts costs, and are reviewed periodically to take into account the actual in situ performance of the product. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 11 of 18

4 Ironbark a NATA Accredited Inspection Body for Street Lighting Ironbark has sought and obtained National Association of Testing Authorities (NATA) accreditation as an Inspection Body, which means that we have been assessed by NATA and found to comply with the requirements of ISO/IEC 17020 (the International Standard governing the requirements of inspection bodies) and to be technically competent to inspect street lights against those requirements of AS/NZS 1158.6 outlined in our Scope of Accreditation (SoA). Our NATA accreditation has major implications for lighting suppliers, as we are now essentially a one-stop-shop for energy efficient lighting technology suppliers seeking approval. As an Accredited NATA Inspection Body Ironbark can now produce NATA-endorsed reports that cover all relevant clauses of AS/NZS 1158.6 as well as assess for the requirements of the DNSPs involved in PLAN. Ironbark s SoA permits us to perform inspection/testing against the following clauses of AS/NZS 1158.6: 1.5, 1.6, 1.7, 2.2.1, 2.4.1, 2.4.2, 2.4.3, 2.5.1, 2.5, 2.6, 2.7, 2.8, 2.9, 2.10, 3.7, 3.9, 3.10, 3.11, and 6.2. Mainly due to the need for specialist testing equipment (e.g. vibration testing), testing against the following clauses of AS/NZS 1158.6 will be subcontracted: 2.2.2, 2.3, 3.8, 3.12, 3.13, 5.3, 5.4, 5.5, 5.6, 5.7, 5.8, 5.9, 5.10, and 6.3. Ironbark will produce NATA-endorsed reports that cover all relevant clauses of AS/NZS 1158.6. In late 2015 the AS/NZS 1158.6 Standard was updated to become a Technical Specification. The PLAN process has been updated to include this change. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 12 of 18

5 Further Information If you have any questions relating the Public Lighting Approvals Network, the assessment process or Ironbark s NATA-accredited services described above, please contact Ironbark Sustainability on 1300 288 262 or PLAN@realaction.com.au. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 13 of 18

6 Appendix 1 Further assessment details 6.1 Required information 6.1.1 PTA For the PTA (Step 1 of the assessment process), the supplier must provide the following: Basic product details including: o Product name o Product code o Manufacturer and country of origin o Power consumption A production sample of the product for inspection Photometric files (if spacing assessment is required) 6.1.2 ITMA For an ITMA (Step 3 of the assessment process), the following information and materials must be provided by the supplier: Option A - ITMA report with separate NATA test reports provided to Ironbark 1. Production sample of luminaire 2. The following NATA-endorsed (or equivalent) test reports 1 : a. Compliance with all relevant clauses of SA/SNZ TS1158.6:2015 and AS/NZS 60598.2.3:2015 2 b. Vibration test report (to be carried out regardless of luminaire s weight, as per SA/SNZ TS 1158.6:2015 Section 5.4) c. Impulse voltage testing report (as per SA/SNZ TS 1158.6:2015 Section 5.5) d. Photometric test report (compliant with IESNA LM-79-08 or CIE S025/E:2015) and associated CIE and IES files e. LED lumen maintenance report (compliant with IES LM-80-08 or ANSI/IES LM-80-15) f. In-situ temperature measurement test (ISTMT) report conducted on one sample using Section 12.4.1 of IEC 60598.1 (or equivalent) or Clause 14 of ANSI/UL 1598. The ISTMT must be conducted in accordance with Annex A of IES LM-84-14. The ISTMT report must include: i. Statement that the ISTMT was conducted in accordance with Annex A of IES LM-84-14 ii. The brand and model of the LED chip(s) iii. The forward current of the LED chip(s) iv. Clear photos identifying the product and the exact position of the thermocouple. Note 1. ISTMT reports must be issued in the exact brand and model as the product applied for. Brand/model reconciliation documents are not accepted for ISTMT reports. 1 If any of these are not available, Ironbark can facilitate obtaining relevant testing and reports. An itemised quote can be provided for this service. 2 Note that LM-84-14 testing and TM-28-14 calculation (as per Cl 5.7 of SA/SNZ TS 1158.6:2015 is not required. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 14 of 18

2. Scope of Accreditation documents will need to be provided for all testing laboratories used. 3. Manufacturer s declaration stating the brand, model and forward current of the LED chip(s) when used under normal operating conditions in Australia 4. Data/specification sheets as evidence of: a. Driver and LED chip RoHS compliance b. Driver IEC 61000.3.2 compliance c. Surge Protection Device (SPD) d. Driver life/mortality data e. Where the LED chip lense material is polycarbonate, data/specification sheets as evidence of: i. Polycarbonate is UV stabilised ii. Yellowness index data iii. Light transmission data 5. Evidence of Lamp Circuit Power (as per AEMO requirements) 6. Evidence that module is multiple array 7. Details of warranties 8. ACMA Declaration of Compliance 9. Installation sheet/instruction booklet 10. Product specification sheet with a full description of the luminaire and dimensional drawing 11. Company history/details including "registered business" accreditation 12. PE Cell temperature testing (as per the requirements of the SSL Street Lighting Design and Performance Guidelines - Victoria) Option B - ITMA report with full NATA Inspection undertaken by Ironbark Note: The AS/NZS 1158.6:2010 has recently been updated to form SA/SNZ TS 1158.6:2015. Due to this update the costs for Ironbark testing is under review. For an updated price, please contact Ironbark. 1. 7 production samples of the luminaire each fitted with PE cell. One sample must be provided with an Australian Standard mains plug (tagged and tested by a qualified electrician) to allow connection of the luminaire to a general power outlet; 2. The following NATA-endorsed (or equivalent) test reports 3 : a. LED lumen maintenance report (compliant with IES LM-80-08 or ANSI/IES LM-80-15); Note - Scope of Accreditation documents will need to be provided for all testing laboratories used. 3. Manufacturer s declaration stating the brand, model and forward current of the LED chip(s) when used under normal operating conditions in Australia. 4. Data/specification sheets as evidence of: a. Driver and LED chip RoHS compliance b. Driver IEC 61000.3.2 compliance c. Surge Protection Device (SPD) d. Driver life/mortality data e. Where the LED chip lense material is polycarbonate, data/specification sheets as evidence of: i. Polycarbonate is UV stabilised ii. Yellowness index data iii. Light transmission data 5. Where the LED chip lense material is polycarbonate, data/specification sheets as evidence of: 3 If any of these are not available, Ironbark can facilitate obtaining relevant testing and reports. An itemised quote can be provided for this service. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 15 of 18

a. Polycarbonate is UV stabilised b. Yellowness index data c. Light transmission data 6. Evidence that module is multiple array 7. Details of warranties 8. ACMA Declaration of Compliance; 9. Data/specification sheets for the following components: a. Screws, nuts and washers (indicating the grade of steel used, if applicable); b. Seals and gaskets (indicating silicone rubber material); c. PE cell and base (for NEMA cells, indicating compliance with ANSI C136.41); d. Electronic control gear (indicating compliance with AS/NZS 61347.2.13, the immunity requirements of IEC 61547, and power factor of not less than 0.85); e. Metal Oxide Varistors (MOVs) (if applicable) (indicating compliance with IEEE/ANSI C62.41.2 and the appropriate part of IEC 61643-331). 10. Approval certificates as evidence of the following: a. If the luminaire body material consists of one of the following: i. Cast aluminium alloy - complies with AS 1874 and having a copper content of not more than 0.3%; ii. Extruded aluminium alloy - complies with EN 1090-3 b. That acrylic visors comply with Section 2.4.2.2 of SA/SNZ TS 1158.6:2015 when tested as per: i. ASTM E1348; and ii. ASTM D648-07 c. That borosilicate glass visors comply with ISO 3585; 11. Installation sheet/instruction booklet; 12. Evidence of Control Gear compliance with SA/SNZ TS 1158:6:2015 Section 3.2. 13. Product specification sheet with a full description of the luminaire and dimensional drawing; and 14. Company history/details including "registered business" accreditation PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 16 of 18

6.2 Details of assessment 6.2.1 PTA The PTA involves a visual inspection of a production sample of the product by Ironbark s technical staff against the specific requirements of approval authorities, and a cross check of its design and specifications against the requirements of AS/NZS 1158.6. The PTA may also include spacing assessment. 6.2.2 ITMA For a standard lighting product undergoing an ITMA, the assessment involves: 1. Verification that the product complies with all relevant approval authority requirements, as substantiated by the supplied NATA-endorsed reports or via Ironbark inspection (see Section 4 for details of the NATA-accredited services that Ironbark offers); 2. Verification that the photometric performance of the product makes it a suitable replacement for an existing lighting product; 3. Comparative analysis of the cost (operational) of the product with the incumbent product it seeks to replace; 4. Comparative analysis of the energy efficiency of the product with the incumbent product it seeks to replace; and 5. An assessment of the existing level of market competition for products of the same type. For non-standard lighting products undergoing an ITMA, review involves: 1. Points 1 and 2 above (spacing will be assessed against already approved non-standard lighting products); and 2. Verification that a client for the product exists (e.g. letter of commitment). PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 17 of 18

6.3 Report generation 6.3.1 PTA An assessment report comparing the product against the specific requirements of approval authorities can be provided by Ironbark upon request. 6.3.2 ITMA For ITMAs, a report is generated that either recommends or does not recommend the lighting product for approval. If the recommendation is that the lighting product not be approved, the reasons will be clearly outlined in the report. In the case of missing or inadequate information, Ironbark will provide the supplier with the opportunity to address these issues and resubmit the product for assessment. Similarly, where the reasons for the non-recommendation are technical or design related, then Ironbark will provide the supplier with advice on what can be done to address these issues, and the opportunity to have the product reassessed will be offered. PLN_SPL_001_PLAN_Process_Description_v15 www.realaction.com.au 18 of 18