Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN

Similar documents
Appendix A: Energized Work Permit

D Square Construction LLC

Electrical Safety Program

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6

Electrical & Arc Flash Safety Program 2007

Electrical Safety Program

Electrical Safety Program

2012 NFPA 70E: Electrical Safety In The Workplace

The Pennsylvania State University Energized Electrical Safety Program

Electrical Safety Program

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

SECTION 51 NFPA 70E POLICY. Health & Safety Policy and Procedures Manual

Leader s Guide ERI Safety Videos

IWU PHYSICAL PLANT SAFETY PROGRAM. Revision: 1 ELECTRICAL SAFETY Section: 4

Original Date of Issue: 04/09

Leader s Guide ERI Safety Videos

Selection of Electrical PPE Tables

2. The purpose of this program is to achieve the following objectives:

Definitions found in several locations:

Electrical Safety. Introduction

ARC FLASH INTRODUCTION. Injuries

Electrical Safety Work Practices

POWER DELIVERY. Contractor Health & Safety General Terms and Conditions. Appendix B Personal Protective Equipment

The following were determined to be confined spaces; they may not be permit required that employees of the Division of Facilities may encounter:

Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager

2017 NWHA TECHNICAL SEMINAR. Arc Flash Hazard Awareness MIKE BRENDLE LLC

Welcome to this training session about arc flash. In this session, we ll talk about the hazards and risks of working around exposed, energized

UNIVERSITY OF TOLEDO

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Electrical Safety Standard

Electrical Safety Program

Responsibilities / Accountability

Electrical Hazards: Overhead and underground power lines. tools. Ungrounded electrical systems and tools. in wet/damp environments

EVEREADY BATTERY BENNINGTON, VERMONT FACILITY SPECIFIC HOUSE RULES FOR OUTSIDE CONTRACTORS

PPE and Tools PPE and Tools

Arc Flash. Safety 21

USA Mobile, AL Electrical Safe Working Practices

ELECTRICAL SAFE WORK PRACTICES

Job Hazard Analysis Form (JHA)

Table of Contents. Note. Contents 1 through 13 are for non-authorized employees. Contents 14 through 16 are for authorized employees.

Campus Safety Procedure Electrical Safety

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

The following general approach will be used when conducting energized electrical work.

Electrical Safety Program February 2, 2016

By: Bruce Bowman, P.E.

ELECTRICAL SAFETY PROCEDURE

11/2/2017. Course Objectives. Overview

Management Plan for Electrical Safety ISD #535

KMU SUBSTATION WORKSHOP

This is (Enter Company Name Here) Arc Flash Prevention policy. (Enter Name Here) will be responsible for overall direction of the Safety Program.

Why do I need to do an Arc-Flash Analysis?

NECA Personal Protective Equipment (PPE) Selector

HSE Procedure Energized and Potentially Energized Electrical Equipment Issuing Department: Corporate HSE

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

Welding/Cutting/Brazing with Hot Work Permit

Health, Safety, Security and Environment

100 Questions on Electrical Safety Study Guide

CALIFORNIA STATE UNIVERSITY, LOS ANGELES ELECTRICAL SAFETY PROGRAM

MAINTENANCE MECHANIC RCF

Electrical. OSHA Office of Training and Education 1

Personal Protective Equipment (PPE) Hazard Assessment Certificate Instructions

Progressive Safety Services LLC - All Rights Reserved

Hot Work Program. University of Wisconsin-Platteville Reviewed 4/2016

NFPA 70E Policies and Best Practices

ARC FLASH HAZARD ANALYSIS

APPENDIX A. Appendix A: Fall Hazards Lesson Test Instructor Copy (answers bold/italic), Student copy to distribute follows

ANSI A Work Zone Safety for Highway Construction. Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America

Title: NFPA 70E Effective Date: 12/8/2014 Control Number: THG_0053 Revision Number: 1 Date: 10/26/2015 Annual Review Completed: 5/13/2015 NFPA 70E

Arc Flash 101. presented by Arc Flash Blaster LLC

14. Personal Protection Chapter , WAC

Electrical Safety Program

WHAT IS THE N.F.P.A. 70E

Personal Protective Equipment. Individual Unit Function: Safety Procedure No.: SOP-0147 Page: 1 of 9

Recent changes in workplace safety regulations have heightened the awareness of hazards associated with electrical arcs.

University of Vermont Department of Physical Plant Personal Protective Equipment Program

POLICY & PROCEDURE #502 EFFECTIVE DATE: 6/5/02 LAST REVISED: 7/12/12 LAST REVIEWED: 7/8/15

Safety Meeting Topic #6 Working Around /On Energized Equipment

Orchard Farm Fire Protection District Standard Operating Procedure

SECTION 10 ELECTRICAL SAFETY

arc flash hazard analysis

PERSONAL PROTECTIVE EQUIPMENT SAFETY PROGRAM

SUBJECT: SAFE WORK PRACTICES CHECKLIST FOR LOW VOLTAGE ELECTRICIANS REVISION September 15, Area Checklist Items 2600SEG131 Check ( or NA)

SAFE-WORK PRACTICES Working On Or Near Energized Electrical Equipment CAT A-1 SOP #4

POWER PLANT RELAY REPLACEMENT DELIVERABLE ARC FLASH

MAINTENANCE MECHANIC RCF

STReSS Laboratory Safety Training Memorandum

2. What is the definition of an electrocution hazard? a. Electrocution results when a person is exposed to a lethal amount of electrical energy

SPECIALIZED ONLINE TRAINING COURSE LIST

OSHA FIRE INVESTIGATOR OPERATIONS SAFETY CHECKLISTS GENERAL SCENE SAFETY PROCEDURES

Doc No: ELECTRIC Midland Engineering Co., Inc. Initial Issue Date 12/14/15 Safety Management System

New Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety.

Removing Yourself from Hazards During Equipment Operation

Duke University - Facilities Management Department Environmental Safety and Health Program ELECTRICAL SAFETY PROGRAM

Self Inspection Checklist

Electrical Safety Program

HIGH-IMPACT SAFETY TRAINING FOR QUALIFIED ELECTRICAL WORKERS

Electrical Safety PPT-SM-ELECTSFTY V.A.0.0

This training session covers electrical safety for unqualified persons. Unqualified persons are machine operators, operators of powered industrial

ELECTRICAL FLASHOVER HAZARDS AND SAFETY MEASURES REFERENCE TO DESIGN AND MAINTENANCE. Intrduction: B.MAHARANA, AGM(EM)/HOD NTPC,RAMAGUNDAM

Individual employees are responsible for their own and their co-workers' safety. This means:

Chapter 7 - Electrical Safety

Transcription:

Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN Section 1 - PROJECT INFORMATION Project Work Request No. Building Room/Location Equip. Serial No. Fed from Section 2 - HAZARD ANALYSIS Safety Hazard Review Checklist: SAFE ACCESS TO WORKSITE Name of Equipment Drawing No. Ladder Scaffolding Roof Sewer Catwalk/Landing Suspended Ceiling Pit or Tunnel POTENTIAL HAZARDS AND SAFEGUARDS Asbestos Biological Hazards Chemicals Compressed Gas Confined space or Permit required Confined Spaces Electrical Powerline Overhead Electrical: damp/wet environment Heat/cold stress Energized Equipment Mechanical Hydraulic Pneumatic Steam Excavation, Trenching, Shoring Fall Hazards (workplan may be required) Fire Hazard Lead Noise Materials handling (forklift, lift, hoist, etc.) Overhead Hazard (hard hat) PPE Ears Eyes Feet Hands Head Respiratory Radiation Scaffolding Welding/Cutting ELECTRICAL ENERGY SOURCES: Check all that apply 120 volts 277 volts Emergency Power 208 volts 480 volts Less than 50 volts (permit may not be required) 240 volts DC Other (describe) Work To Be Performed (and work practices to be used): 1

Justification for Energized work EXEMPTION 1 De-energizing introduces additional or increased hazards. Examples include interruption of life support equipment, deactivation of emergency alarm systems, shutdown of hazardous location ventilation equipment, or removal of illumination for an area. EXEMPTION 2 De-energizing is infeasible due to equipment design or operational limitations. Examples include testing of electrical circuits that can only be performed with the circuit energized, and work on circuits that form an integral part of a continuous industrial process in a chemical plant that would otherwise need to be completely shutdown in order to permit work on one circuit or piece of equipment. EXEMPTION 3 Live parts that operate at less than 50V to ground need not be de-energized if there will be no increased exposure to electrical burns or to explosion due to electric arcs. Explain specifics for this work: Special Instructions: 2

Approach Boundaries to Live Parts for Shock Protections (NFPA 70E, Table 130.2 (C) System Voltage Limited Approach (fixed circuit par ts) Boundary Restricted Approach Boundary Prohibited Approach Boundary Less than 50V 50V to 300V not specified 3 6 * not specified avoid contact not specified avoid contact 301V to 750V 3 6 * 1 0 0 1 751V to 15 kv 5 0 * 2 2 0 7 5.1kV to 35kV 6 0 * 8 0 * 36.1kV to 46kV 8 0 * 46.1kV to 72.5kV 8 0 ** 72.6kV to 121kV 10 0 *** 138kV to 145kV * If any conductors are moveable, the limited approach distance is 10. ** If any conductors are moveable, the limited approach distance is 10 8. *** If any conductors are moveable, the limited approach distance is 11 0. 2 7 2 9 3 2 3 3 3 7 0 10 1 5 2 1 2 8 3 1 Multiply single phase voltages by 1.73 to obtain correct voltage level to be used (NFPA 70E C.2.11) Limited Approach Boundary Approach limit at a distance from a live par t within which a shock hazard exists. Restricted Approach Boundary Approach limit at a distance from an exposed live par t within which there is an increased risk of shock, due to eletrical arc-over, combined with inadvertent movement, for personnel working close to the live par t. Prohibited Approach Boundary The approach limit at a distance from a live par t within which work is considered the same as making contact with the live par t. Flash Hazard Analysis (NFPA 70E.130.3 [A]) Contact Facilities Services Engineering Services to fill out this section if work does not meet the less than 600V or.1 sec. clearing time. Flash Protection Boundary (check method used to determine boundary) 4 0 (systems less than 600 volts, with 0.1 second clearing time; Ibf<50kA, or 5000 A-sec) Other (please state the source or attach the work performed to derive the boundary). Fault Clearing Device (name) Description Manufacturer/Model/Type Clearing time, seconds The person completing this section must complete the Authorization (Section 6) 3

Hazard/Risk Level Determination Method Used: Available short circuit fault current is less than 10,000 amps. (Identify source of calculated value) From NFPA 70E Table 130.7(C) (9) (A) Other (describe) Hazard/Risk Level: -1 0 1 2 3 4 At distance of: Section 3 - PERSONAL AND OTHER PROTECTIVE EQUIPMENT Personal Protective Equipment Use NFPA 70E Table 130.7(C) (10) and check all that apply: CAL RATING CAL RATING Pants FR Long Sleeve Shirt FR Flash Suit Pants Natural Fiber Clothing FR Pants FR Hard Hat Eye Protection FR Coverall FR Safety Goggles T-shir t (short) FR Jacket Arc-rated Face Shield Long Sleeve Shirt FR Flash Suit Jacket Flash Suit Hood Hearing Protection Leather Gloves Protective Footwear No jewelry or metal objects can be worn or carried in pockets while completing work requiring an energized work permit. This includes wedding rings, necklaces, watches, earrings, keys, coins, pocket knives, etc. Other Protective Equipment Insulated tools and equipment required per NFPA 70E Table 130.7(C) (9) (A) Insulated Tools Fiberglass-Reinforced Plastic Rods Rubber Insulating Equipment Fuse or Fuse Holding Equipment Portable Ladders Voltage Rated Plastic Guard Equipment Ropes and Hand Lines Protective Shields Physical or Mechanical Barriers Section 4 - SITE CONTROL AND SUPPORT Worksite Control Locked Access Electrical Hazard Signs Worker Support Required Safety Watch Required Barrier Tapes, Stanchions Attendant Other Means of emergency communication (check all that apply). Radio Cell Phone Phone 4

Section 5 - WORK SCHEDULE AND PERSONNEL Schedule mo. day y ear mo. day y ear (s) to Hours mo. day y ear Permit Expiration Personnel (not to exceed one year from star t date). s are not required until the work briefing is complete. QUALIFIED PERSON Performing Work Safety Watch Reviewed Hazard Analysis Completed Job Briefing Agrees to Requirements Yes No QUALIFIED PERSON Performing Work Safety Watch Reviewed Hazard Analysis Completed Job Briefing Agrees to Requirements SUPERVISOR Prepared Hazard Analysis Completed Job Briefing Verified Employees are qualified to do this work N OTE: If any unexpected energy is found, or equipment has been modified since the permit was issued, the permit is VOID. Section 6 - AUTHORIZATION OF ENERGIZED ELECTRICAL WORK PERMIT FMS Supervisor, Lead or Electrical Engineer Completed and/or reviewed Flash Hazard Analysis Comments: UoW 1393 (12/06)

Responsible Supervisor Authorizing Work Reviewed Flash Hazard Analysis Agreed to Justification Comments Manager Authorizing Work Reviewed Flash Hazard Analysis Agreed to Justification Comments Page 6.