REPORT. Engineering and Construction Department

Similar documents
CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

122 Avenue: 107 Street to Fort Road

Downey Road. Transportation Improvement Study

City of Margate, Florida. Neighborhood Traffic Management Manual

TOWN OF PAYSON TRAFFIC CALMING MANUAL

TOWN OF HALTON HILLS TRAFFIC CALMING PROTOCOL. Page 1 of 25

102 Avenue Corridor Review

Traffic Calming Rosemount Avenue, between Ralph Street and Queenslea Avenue

REPORT. RECOMMENDATION: 1. That the report on Pilot Results Free Transit for Seniors, dated October 25, 2012, from Oakville Transit be received.

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Tonight is for you. Learn everything you can. Share all your ideas.

Corporate Report. Recommendation

WELCOME Public Information Centre

City of Vestavia Hills Traffic Calming Policy for Residential Streets

5 Transit & Traffic. Overview

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Traffic Calming Policy

TRAFFIC CALMING TOOLBOX

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

Public Works and Infrastructure Committee. General Manager, Transportation Services

CITY OF ORILLIA POLICY MANUAL

Neighborhood Traffic Calming Policy & Guidelines

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Agenda Item # Page # RECOMMENDATION

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Cycling Network Plan Implementation in Thorncliffe Park and Flemingdon Park

Edenbrook Hill Drive Traffic Calming Study

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia

Transportation Impacts: Toronto York Spadina Subway Extension

WELCOME PETTIT AVENUE SPEED CONTROL REVIEW NIEGHBOURHOOD OPEN HOUSE. City of Niagara Falls Transportation Services

NEIGHBOURHOOD TRAFFIC CALMING PROCESS AND GUIDELINES

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

CORPORATE. Transportation Department Traffic Services Division Neighbourhood Traffic Management Policy. Revision Date January 24, 2006

and Members of Municipal Council City of Niagara Falls, Ontario Pettit Avenue Speed Control Review

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Public Information Centre

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

2. Executing a legal agreement with respect to (1) above.

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

POLICY: TRAFFIC CALMING

TRAFF IC CALMING POLICY

TOWN OF WASAGA BEACH TRAFFIC CALMING POLICY

THE CORPORATION OF THE CITY OF WINDSOR POLICY

Appendix A-2: Screen 1 Alternatives Report

Traffic Control Signals Review 4325 McCowan Road

CITY COUNCIL AGENDA REPORT

RESIDENTIAL TRAFFIC CALMING PROGRAM

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

City of Memphis On-Street Parking Modification Guidelines

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

3.1 TRAFFIC CALMING PROCESS SUMMARY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Woodward Hill Elementary School School Safety and Operation Review

Frequently Asked Questions (FAQ)

b. executing legal agreements with respect to the above.

Welcome. If you have any questions or comments on the project, please contact:

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Uptown West Neighbourhood Transportation Study

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Massey Place Neighbourhood Traffic Review

March 2011 Engineering Services

Having held a public hearing, that Council approve:

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

Board of Supervisors February 27, 2017

Pedestrian Crossing Guidelines 2016

CITY OF DUNWOODY PUBLIC WORKS DEPARTMENT

DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

2.0 LANE WIDTHS GUIDELINE

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Traffic Calming Review. Max Becker Drive. Thursday, November 30, 2017 Presentation at 7:00 p.m. WT Townshend Public School

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Glebe Neighbourhood Cycling Plan

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

10.0 CURB EXTENSIONS GUIDELINE

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required.

CITY OF ROCK HILL, SOUTH CAROLINA. Neighborhood Traffic Calming Program A Policy for Use of Traffic Calming on Local (Residential) Streets

Improve the livability of our streets by

TORONTO TRANSIT COMMISSION REPORT NO.

Transcription:

REPORT COMMUNITY SERVICES COMMITTEE MEETING DATE: JUNE 11, 2013 FROM: Engineering and Construction Department DATE: May 24, 2013 SUBJECT: Great Lakes Boulevard Mini Roundabout LOCATION: Great Lakes Boulevard and Timeless Drive WARD: 1 Page 1 RECOMMENDATION: 1. That the Great Lakes Boulevard Mini Roundabout staff report from the Engineering and Construction Department, dated May 24, 2013, be received; and 2. That retrofit mini roundabouts be added to the list of suitable physical traffic calming devices for major collector roads. KEY FACTS: The following are key points for consideration with respect to this report: Staff has previously provided Council with staff reports (December 2011 and May 2012) regarding speeding concerns along Great Lakes Boulevard. Council requested that staff carry out a pilot project to implement a mini roundabout at Great Lakes Boulevard and Timeless Drive; staff committed to report back to provide Council with an assessment of the pilot, including merits for potential further application. During the autumn of 2012, a design was prepared, stakeholders were consulted and the mini roundabout was substantially implemented prior to Christmas. Staff has observed the operation of the mini-roundabout during several occasions and has noted it can be suitably navigated by all types of vehicles (automobiles, trucks, buses, etc.). In the spring, a speed survey was undertaken and 85th percentile speeds were measured to be 33 km/h northbound and 40 km/h southbound; these measurements indicated a reduction of 24 km/h and 23 km/h respectively over previous speed surveys taken (prior to the implementation of the miniroundabout). Stakeholder requests for an extension of the curb on the south exit of the mini roundabout to further reduce speeds has been reviewed by staff and

From: Engineering and Construction Department Date: May 24, 2013 Subject: Great Lakes Boulevard Mini Roundabout COMMUNITY SERVICES COMMITTEE Page 2 the design consultant; while it is not necessary to further reduce speeds such an enhanced treatment may provide additional benefits for pedestrians (i.e. shorter crossing distance). Staff has concluded that retrofit mini roundabouts may be considered as effective traffic calming devices for major collector roadways. BACKGROUND: A staff report entitled Great Lakes Boulevard Roadway Review was presented to Community Services Committee (CSC) on May 23, 2012 (please refer to Appendix A to view a copy of the report). The report presented results of all-way stop warrants completed for the intersections of Great Lakes Boulevard at Milkweed Way, Timeless Drive and Raspberry Bush Trail. The report also provided some alternatives for speed mitigation measures along with those presented in an earlier report to CSC of December 13, 2011(also included in Appendix A). Several area residents attended the May 23, 2012 CSC meeting and made delegations to committee. CSC approved that a pilot project of a mini roundabout be implemented at the intersection of Great Lakes Boulevard and Timeless Drive. Following the CSC meeting, town Council authorized staff to proceed to design the mini roundabout, consult with adjacent property owners and implement the installation in 2012, and thereafter assess its merits for potential further application in the town as a means to address traffic speeds. This report has been prepared to address Council s direction and to provide a summary of the pilot project. COMMENT/OPTIONS: Design and Construction Staff retained a transportation consultant, Hatch Mott MacDonald (HMM) to complete a design for the mini roundabout. HMM prepared a preliminary design and it was presented at a Public Information Centre (PIC) meeting on September 11, 2012. Residents in the vicinity of the proposed mini roundabout (one block north and south of Timeless Drive) were invited to attend the PIC. In addition, the local ward councillors made arrangements to include information about the PIC in a community newsletter that was distributed to additional residents in the area. In the days following the PIC, staff received feedback from stakeholders who had attended the PIC. Staff and ward councillors also met separately with residents living immediately adjacent to the proposed mini roundabout as they were seeking clarity on the design and how it would impact their property frontage. Staff and

From: Engineering and Construction Department Date: May 24, 2013 Subject: Great Lakes Boulevard Mini Roundabout COMMUNITY SERVICES COMMITTEE Page 3 councillors addressed concerns raised by these residents and the design was finalized. The project was issued for tender, was awarded and work commenced in early November 2012. The majority of the work was completed by mid December 2012. During the course of the work, it was decided that landscaping of the centre island would be deferred until the spring of 2013. In addition, due to cold temperatures, the final course of asphalt pavement was deferred until 2013 to be implemented as part of the 2013 resurfacing program. It should be noted that a field adjustment was made to the sidewalk alignment during construction of the project; the sidewalk along the east side of the Great Lakes Boulevard was constructed flush alongside the curb as a means to lessen the impact to the sodded front/side yard area of the properties immediately north and south of Timeless Drive. Staff subsequently decided to modify this adjustment to the sidewalk alignment and relocate the sidewalk position per the original design (sidewalks set back from the curb radii in a diagonal direction to provide for a buffer area between the sidewalks and the curbs, thereby moving the pedestrians further away from vehicles travelling within the mini roundabout). As of the writing of this report, the landscaping for the centre island has been completed; the sidewalk modifications were scheduled to be completed in advance of the June 11 CSC meeting. Speed Mitigation Speeds collected in the immediate vicinity of Great Lakes Boulevard and Timeless Drive in 2012, prior to the installation of the mini roundabout, indicated that 85th percentile speeds (or the operating speed of the roadway) were 57 km/h in the northbound direction and 63 km/h in the southbound direction. New speed surveys were undertaken in May 2013 at the approaches to and within the mini roundabout. The 85th percentile speeds measured within the mini roundabout were found to be 33 and 40 km/h (rounded) in the northbound and southbound directions respectively. The results of the speed studies indicate a significant reduction in operating speeds of 24 km/h in the northbound direction and 23 km/h in the southbound direction. The achieved reductions in operating speeds are nearly as substantial as those that are experienced with speed cushions. The absolute speeds through the mini roundabout are higher in the southbound direction; however, the impact of the mini roundabout on reducing operating speeds has been effectively the same in both directions and staff would advise that, from a speed mitigation perspective, the results are satisfactory.

From: Engineering and Construction Department Date: May 24, 2013 Subject: Great Lakes Boulevard Mini Roundabout COMMUNITY SERVICES COMMITTEE Page 4 Southbound Exit Alignment of the Mini Roundabout Aside from comments received and addressed as part of the design phase of this project, there has been some concerns expressed with the southbound exit alignment and that it does not provide enough of a physical barrier to keep vehicles in line with the pavement marking alignment, and that as a result higher exit speeds can be achieved. A stakeholder has suggested that the curb at the southbound exit be extended to increase the deflection of traffic flow and further reduce speeds in the southbound direction. Staff has reviewed the suggestion with HMM during a debrief session. It is acknowledged the exit speeds could be further mitigated at the southbound exit by providing additional deflection (e.g. curb extension) and it would also reduce the crossing walking distance for pedestrians by approximately 2 metres in this area.. A full curb extension would require an additional road side drainage basin as surface runoff would be impeded. Another alternative reviewed with HMM in lieu of a full curb extension was a mountable island, separate from the existing curb, which would provide similar horizontal alignment deflection for automobiles but would not impede surface runoff. It could be designed similarly to the adjacent splitter island (mountable curb with patterned concrete inlay). A formal design has not been prepared for either a full curb extension or a mountable island. Staff would provide a preliminary estimate in the range of $10,000 20,000 to implement these options. While the operating speeds are higher through the mini roundabout in the southbound direction, the overall speed reduction that has been achieved is significant. Although additional physical modifications at the southbound exit could provide additional benefits at some additional cost, on balance the current configuration works satisfactorily from a speed mitigation point of view. Vehicular Movement through the Mini Roundabout In addition to performing speed surveys of vehicles travelling through the mini roundabout, staff has visited the mini roundabout on a number of separate occasions to observe different types of vehicles during various periods of the day. From these observations, staff witnessed a range of vehicles which were able to travel through the mini roundabout effectively and without difficulty. Smaller vehicles such as autos, SUV s and pick-up trucks stayed completely on the asphalt driving surface of the mini roundabout. Mid-sized vehicles such as school buses and Oakville Transit buses were observed travelling through the mini roundabout on the asphalt surface. Large sized vehicles such as tractor trailers were observed on a couple of occasions and they travelled on both the asphalt driving surface and on the mountable shoulder of the central island (as intended).

From: Engineering and Construction Department Date: May 24, 2013 Subject: Great Lakes Boulevard Mini Roundabout COMMUNITY SERVICES COMMITTEE Page 5 A stakeholder advised staff that he had witnessed a school bus stopping within the mini roundabout to load/unload children. Staff contacted the Halton Student Transportation Services (HSTS), who operate buses for both school boards, to advise that school bus drivers should not stop within the mini roundabout when picking up or dropping off students. The HSTS agreed this should be the practice. Project Costs The original cost was estimated to be approximately $50,000. There were items in the project that were not initially expected including the relocation of a drainage basin, relocation of sidewalks on both the east and west sides and patterned concrete inlays. In addition, the work was tendered very late in the construction season while the tendered unit rates were within an appropriate range for the work, it was at the higher end of the range (tendering this work out in the spring or early summer may have resulted in a 10-20 % reduction in labour/material costs). In addition, the consulting fees for the design were higher than what staff had envisioned. All these factors contributed to the project coming in at over $100,000. It is anticipated that, should Council decide to retrofit additional mini roundabouts in Oakville, staff can apply some of the knowledge gained at this pilot project location to achieve lower costs for any future installations. Conclusions 1. Great Lakes Boulevard Pilot Project The Great Lakes Boulevard/Timeless Drive mini roundabout has reduced the operating speed along Great Lakes Boulevard in the vicinity of Timeless Drive in the range of 23-24 km/h. The mini roundabout is very effective in mitigating operating speeds. Additional modifications at the southbound exit could further reduce operating speeds in the southbound direction and would reduce the pedestrian crossing distance by 2 metres in this area. However, the current configuration of the mini roundabout delivers satisfactory speed mitigation in both directions. The intent of the mini-roundabout from a traffic calming practice point of view has been achieved - it is not necessary to further reduce speeds. Should Council wish to implement the enhancement, it would cost in the range of $10,000-20,000 and it would have to be designed and implemented prior to the placement of the final course of asphalt it could be delivered by the late summer or early autumn.

From: Engineering and Construction Department Date: May 24, 2013 Subject: Great Lakes Boulevard Mini Roundabout COMMUNITY SERVICES COMMITTEE Page 6 2. Future Considerations for Mini Roundabouts in Oakville Conventional roundabouts such as the one at Great Lakes Boulevard and Nautical Boulevard South offer several benefits and are being used more in Ontario. They are effective in slowing operating speeds and thereby enhance safety while maintaining acceptable levels of traffic movement. Ideally, conventional roundabouts should be introduced at the design stage of a subdivision as they require substantial additional property requirements relative to a standard intersection with stop control. Mini roundabouts provide similar benefits but require less property and can be more easily introduced on a retrofit basis than conventional roundabouts (since they are smaller). The retrofitting of a mini roundabout at Great Lakes Boulevard/Timeless Drive has demonstrated that it is possible to design, build, and operate one. It clearly is effective in reducing speeds and can be utilized at other major collector road applications elsewhere in town where speed cushions are not appropriate. Staff endorses further application of mini roundabouts. However, the capital expense to build them is high and cannot be absorbed within the existing approved annual capital budget for the town s traffic calming program. Going forward, staff is recommending that mini roundabouts be added to the list of suitable physical traffic calming devices for major collector roads. As potential future locations for mini roundabouts are identified, staff will refer them to Budget Committee on an individual basis for consideration and funding approval. CONSIDERATIONS: (A) PUBLIC Area residents and stakeholders who expressed an interest in the pilot project were notified of this report and the June 11, 2013 Community Services Committee meeting. (B) FINANCIAL The additional funding to construct the pilot project has been approved in conformance with the town s financial control policy. Going forward, staff would refer any additional mini roundabout projects to the Budget Committee on an as needed basis.

From: Engineering and Construction Department Date: May 24, 2013 Subject: Great Lakes Boulevard Mini Roundabout COMMUNITY SERVICES COMMITTEE Page 7 (C) IMPACT ON OTHER DEPARTMENTS & USERS Emergency services, Oakville Transit and Roads and Works Operations were consulted on the implementation of the mini roundabout. (D) CORPORATE AND/OR DEPARTMENT STRATEGIC GOALS This report addresses the corporate strategic goal to: continuously improve our programs and services be innovative (E) COMMUNITY SUSTAINABILITY The appropriate operation of our road network is essential in meeting the transportation and property access needs of Oakville s communities and to support the delivery of services and commercial activity both social and economic pillars for sustainability. In addition, traffic calming initiatives support social sustainability, particularly in residential neighbourhoods. APPENDICES: Appendix A: Great Lakes Boulevard Roadway Review: May 23, 2012 Appendix B: Mini Roundabout Design Drawing Prepared by: Adam Bell, A.Sc.T. Traffic Technologist Engineering & Construction Dept. Submitted by: Dan Cozzi, P.Eng. Director Engineering & Construction Dept.

APPENDIX A

TRAIL RASPBERRY BUSH 281 285 309 305 DRIVE TIMELESS 297 293 289 GREAT LAKES BOULEVARD Engineering and Construction P.O. Box 310, 1225 Trafalgar Road Oakville, Ontario L6J 5A6 Tel. 905-845-6601 www.oakville.ca PEDESTRIAN REFUGE ISLAND OPTION Appendix A Scale 1:750 0 5 10 15 metres May, 2012 O:/Traffic/Great Lakes Blvd Pedestrian Island.dwg N

Appendix B

Appendix C

APPENDIX B