Installation of 2 Tier In Line Greeting Card Rack Material Sent to Store: Greeting Card Fixtures: 4ft Inline Tier Kit (1 per every 4ft based on planogram) 3ft endcap Tier Kit (will not receive if planogram does not call for it) (1) Side Panel Kit NOTE: Additional instructions are included in each kit Greeting Card Product: Greeting Cards Planogram Pocket stickers Pocket divider clips Boulevard Sign Holders Boulevard Signs Greeting Card Rack Sign Title Cards Premium Title Cards 3ft Endcap Tier Kit 4ft Inline Tier Kit Side Panel Kit Boulevard Signs and Sign Holders Planogram Pocket Stickers Greeting Card Rack signs Title Cards Premium Title Cards Pocket Divider Clips
Installing LOWER Frame: Locate the 4ft tier box, the top and bottom tier are included in the same box. Position lower frame so locator pins are along bottom. Insert locator pins into second row of holes of gondola base deck. Fit (1) left frame mount bracket and (1) right frame mount bracket onto wire loops protruding at upper corners of frame (behind upper extrusion). Left Mount Bracket Right Mount Bracket Once frame mount brackets are in place, lean frame toward gondola, and adjust brackets so each fits into upright slots. Press bracket down until frame secure. Repeat Steps above until all lower frames are installed
Installing UPPER Frame: NOTE: Verify gondola height for upper frame 60 GONDOLA 78 GONDOLA Locate 14 th slot above loop wire of lower frame Locate 18 th slot above loop wire of lower frame Hang upper frame on gondola by inserting its uppermost hook into 14 th slot. Lower hook will be in 11 th slot. Hang upper frame on gondola by inserting its uppermost hook into 18 th slot. Lower hook will be in 15 th slot. Press down to ensure frame is secure. Press down to ensure frame is secure. There should be 6 empty slots between wire loop and bottom of upper frame. There should be 10 empty slots between wire loop and bottom of upper frame. 72 GONDOLA Locate 16 th slot above loop wire of lower frame Hang upper frame on gondola by inserting its uppermost hook into 16 th slot. Lower hook will be in 13 th slot. Press down to ensure frame is secure. There should be 10 empty slots between wire loop and bottom of upper frame. Top of Loop Bottom of upper frame
After installing each frame, make sure all plastic excursions are securely attached to rack. If not, slide plastic excursion over tab on frame. Installing Side Panels: Side Panels will be used at the beginning and ending of greeting card set as well as endcap (if planogram calls for endcap) THEY ARE NOT USED ON EACH 4FT SECTION. Assemble LEFT Side panel o Position (1) large side panel so corner (with slotted holes) is at right. o Hold (1) mount bracket in front of slotted holes. o Insert (2) screws through holes from behind and fasten using (2) keps nut. IMPORTANT: Insert screws through holes on opposite face from where mount bracket will be fastened. Assemble RIGHT Side panel o Position (1) large side panel so corner (with slotted holes) is at left. o Hold (1) mount bracket in front of slotted holes. o Insert (2) screws through holes from behind and fasten using (2) keps nut. IMPORTANT: Insert screws through holes on opposite face from where mount bracket will be fastened. Once assembled, position (1) side panel with brackets on inside as shown above. Insert mount bracket in upright slots then fasten side panel to LOWER frame using (3) push pins. Use (3) push pins to fasten each small panel to UPPER frame.
NOTE: Repeat steps above for installing endcap if planogram calls for endcap.
SETTING RACK TO PLANOGRAM: Start by placing pocket divider clips approximately 6 apart. Clips point in towards the rack Once pocket divider clips have been placed, start stickering rack using the stickers shown below. Sticker sheets are separated by top and bottom sections and are laid out to planogram. Top row sticker sheets have (2) 4ft sections on each sheet. Bottom rows have their own sheets. This is noted in the upper left hand corner of sheet. Place stickers in center of pocket. Refer planogram if you have questions. Once racks are completely stickered start stocking product. Numbers on the back of the cards corresponds to the pockets stickers. After all cards have been stocked, insert corresponding title cards behind each card. Use planogram as reference. Note: Use NEW PREMIUM title cards for NEW $2 and $3 cards. These title cards will not have price points on title card. Before inserting PREMIUM title card fold wings in. Next insert boulevard sign holders in correct locations as shown on your planogram in red box. Refer to boulevard placement for signs to use in each location.
Insert Greeting Card Rack signs into clear front channel on the top and bottom of the on front of rack. These signs are numbered, set them up numerically. FINISHED RACK: STATIONERY SET UP: If you have a 72 or 78 gondola, you will place notes, invites and stationery above greeting card rack by using store supplied peg hooks into gondola. If you have a 60 gondola, notes and invites are on clip strips (move to station POG)