April 28, 2011 NYU Wagner Capstone: Rye YMCA

Similar documents
Bicycle Facilities Planning

Complete Streets 101: The Basics

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

COMPLETE STREETS PLANNER S PORTFOLIO

Lawrence Avenue Streetscape Concepts August 30, 2011

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

Safe Routes to School Action Plan Aberdeen, Idaho

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

SAFE ROUTES TO SCHOOL (SR2S)

Designing Complete Streets: What you need to know

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Boston Post Road Design Feasibility Study

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Complete Streets: Building Momentum in Connecticut

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Rightsizing Streets: The Seattle Experience

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

City of Coronado Bicycle Map, Schools, Traffic Signals and Crossing Guard Locations

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

About the Active Transportation Alliance

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Use this guide to learn more about walkability and how you can make your community safer to walk

Omaha s Complete Streets Policy

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Polk Streetscape Project

ITE Northeastern District Meeting

Summary of School Observations and Education and Encouragement Initiatives

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Complete Streets at CalPoly San Luis Obispo

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Franklin Parking Analysis

Vision Zero & ITE. April 11, Toole Design Group. Jason DeGray, P.E., PTOE. Vision Zero & ITE

City of Birmingham Draft Multi-modal Transportation Plan

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Creating Complete Streets to Accommodate All Users

Walkable Community Workshops

Cycle Track Design Best Practices Cycle Track Sections

City of Charlottesville Bicycle and Pedestrian Master Plan Update

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Chapter 5. Complete Streets and Walkable Communities.

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Prince George s County plans, policies, and projects

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Plant City Walk-Bike Plan

Highway School, Ithaca NY

Design Guidelines. Overview. Design Vision for Yellow Brick Road

CHAPTER 3: Vision Statement and Goals

By: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Ajax: The Road to Complete Streets

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Tonight is for you. Learn everything you can. Share all your ideas.

Monterey Road Complete Streets

Off-road Trails. Guidance

Multimodal Transportation Plan

EXECUTIVE SUMMARY. Vision

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Freeway ramp intersection study

Today. Develop Plans. Public Listening Session

Broad Street Bicycle Boulevard Design Guidelines

TRAFFIC CALMING PLANNER S PORTFOLIO

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

City of San Diego Vision Zero Draft Strategic Plan FY 2017

What Is a Complete Street?

IBI Group November 5, 2012

43 rd Avenue, Skillman Avenue Protected Bike Lanes

City of Novi Non-Motorized Master Plan 2011 Executive Summary

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Bay to Bay Boulevard Complete Streets Project

PEDESTRIAN ACTION PLAN

LANCASTER CITY BICYCLE NETWORK

PROPOSED HIGH STREET TRAFFIC CALMING PLAN

CURBSIDE ACTIVITY DESIGN

Arlington County, Virginia ~ National Capital Region Transportation Planning Board (TPB) Transportation and Land-Use Connections (TLC) Program

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Click to edit Master title style

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

NJDOT Complete Streets Checklist

The Wiggle Route in Context

C C C

Active Transportation Facility Glossary

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Transcription:

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 1

CAPSTONE OVERVIEW April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 2

WHY COMPLETE STREETS April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 3

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 4 4,092 U.S. Pedestrian Deaths in 2009 Source: NHTSA

Of the 27 pedestrians killed in Westchester County from 2005-2007 nearly 30% were 65 or older. Source: TSTC April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 5

States with the lowest levels of biking and walking have, on average, the highest rates of obesity, diabetes, & high blood pressure. Source: 2010 Benchmarking Report, Alliance for Biking and Walking

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 7 COMPLETE STREETS OVERVIEW STREETS AS COMMUNITY ASSETS To implement design features and policy measures that make streets safe and accessible for multiple users, regardless of age, ability, or mode of transportation.

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 8 OBJECTIVES SAFETY FITNESS AND RECREATION ECONOMIC DEVELOPMENT INTERMODAL CONNECTIVITY ENVIRONMENTAL

Dry Run Presentation: March 29, 2011 NYU Wagner Capstone::Rye YMCA Slide 9 COMPLETE STREETS HISTORY Complete Streets term coined Complete Streets Coalition formed Over 200 Complete Streets policies Source: The Complete Streets Coalition (TCSC)

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 10 COMPLETE STREETS POLICY Pennsylvania DOT Design Manual State Bill 735, An Act Improving Bicycle and Pedestrian Access Department of Transportation Policy No. 703 BILL PENDING

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 11 DESIGN INTERVENTIONS DESIGN INTERVENTIONS PEDESTRIANS BICYCLES VEHICLES ENVIRONMENT

Dry Run Presentation: March 29, 2011 NYU Wagner Capstone::Rye YMCA Slide 12 PEDESTRIAN INTERVENTIONS CURB EXTENSION REFUGE ISLAND CROSSWALK

Dry Run Presentation: March 29, 2011 NYU Wagner Capstone::Rye YMCA Slide 13 BICYCLE INTERVENTIONS SHOULDER SHARROW BIKE LANE

Dry Run Presentation: March 29, 2011 NYU Wagner Capstone::Rye YMCA Slide 14 BICYCLE INTERVENTIONS EASTCHESTER, NY California Road Sharrows 2010 In Austin, TX, 74% of drivers yielded to cyclists after installation when previously it was 38%. - KVUE ABC News

Dry Run Presentation: March 29, 2011 NYU Wagner Capstone::Rye YMCA Slide 15 VEHICLE INTERVENTIONS SIGNAGE SPEED HUMPS BACK-IN ANGLE

Dry Run Presentation: March 29, 2011 NYU Wagner Capstone::Rye YMCA Slide 16 COMPLETE STREETS DESIGN CITY OF RYE, NY Boston Post Road Road-Diet 2008 Reduced travel lanes: calm traffic widen shoulder improve pedestrian crossing

Dry Run Presentation: March 29, 2011 NYU Wagner Capstone::Rye YMCA Slide 17 ENVIRONMENTAL INTERVENTIONS PERMEABLE PAVEMENT STREET TREES BIOSWALES IN ONE YEAR, ONE TREE Removes of 26 pounds of CO 2 from the atmosphere, equal to 11,000 miles of car emissions Intercepts 1,525 gallons of storm water runoff

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 18 COMPLETE STREETS EXAMPLE Source: Seattle Department of Transportation, N 130 th Street

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 19 CASE STUDIES NYC City of Rye Village of Mamaroneck Town of Mamaroneck Village of Larchmont 1 mile N

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 20 CITY OF RYE between Grace Church St & Van Wagenen Ave 2000 ft N

UNDEFINED CITY OF RYE PEDESTRIAN AND BICYCLE SPACE April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 21

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 22 CITY OF RYE Where: NO SIDEWALKS Where: SIDEWALKS 2000 ft N

UNDEFINED CITY OF RYE PEDESTRIAN AND BICYCLE SPACE April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 23 NO SHOULDER ON PUBLIC RIGHT-OF-WAY

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 24 UNDEFINED CITY OF RYE PEDESTRIAN AND BICYCLE SPACE REMOVE ROCKS AND PAVE SHOULDER WHERE FEASIBLE

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 25 INEFFECTIVE CROSSINGS NEAR SCHOOLS EXISTING: EVE LANE CROSSWALK Eve Lane Near Midland School Hewlett Ave Near Milton School

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 26 INEFFECTIVE CROSSINGS NEAR SCHOOLS PROPOSED: RAISED CROSSWALK Eve Lane Near Midland School Hewlett Ave Near Milton School

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 27 CASE STUDIES City of Rye Village of Mamaroneck Town of Mamaroneck Village of Larchmont 1 mile N

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 28 VILLAGE OF MAMARONECK between Hunter St & Richbell Road 1000 ft N

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 29 METRO NORTH STATION EXIT How do I get across the street? N

PEDESTRIAN WALKWAY April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 30

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 31 PEDESTRIAN WALKWAY WALKWAY

CENTRAL SHOPPING DISTRICT Where is it? April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 32

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 33 WAYFINDING Good for shoppers and businesses

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 34 MAMARONECK AVENUE Parking in Downtown N 1000 ft

BACK-IN ANGLE PARKING April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 35

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 36 25% REDUCTION IN ACCIDENTS - Pennsylvania DOT Improved safety Increased visibility Fewer collisions Easier loading & unloading

NORTH BARRY & HALSTEAD Thinking Beyond Crosswalks April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 37

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 38 CURB EXTENSIONS LESS SAFE MORE SAFE

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 39 ON-STREET CROSSWALK SIGN A street safe for kids

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 40 CASE STUDIES City of Rye Village of Mamaroneck Town of Mamaroneck Village of Larchmont 1 mile N

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 41 TOWN OF MAMARONECK between Richbell Road & Depot Way E 1000 ft N

MAMARONECK CENTRAL SCHOOL Insufficient Crosswalk April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 42

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 43 SAFER CROSSING CURB EXTENSION

PALMER AVENUE Unsafe for bicyclists April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 44

DEFINE PARKING LANE & SHARROWS Safe for bicyclists April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 45

WALTER S HOTDOG STAND A Local Culinary Destination April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 46

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 47 GREAT DESTINATIONS MADE BETTER Bike Parking Pop-Up Cafe

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 48 CASE STUDIES City of Rye Village of Mamaroneck Town of Mamaroneck Village of Larchmont 1 mile N

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 49 VILLAGE OF LARCHMONT between Palmer Ave & Boston Post Road between Palmer Ave & Magnolia Avenue 1000 ft N

LARCHMONT AVENUE @ Willow Underutilized & Underused April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 50

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 51 VILLAGE OF LARCHMONT Photos courtesy of Larchmont Historical Society

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 52 EXISTING: Larchmont Avenue (South of Boston Post Road) PROPOSED: Sharrow & Bike Lane

LARCHMONT AVE @ Willow Ave Existing Conditions April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 53

LARCHMONT AVE @ Willow Ave Proposed: Sharrow & Bike Lane April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 54

EXISTING: Chatsworth Avenue @ Summit April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 55 PROPOSED: Bike Lanes & Buffers

CHATSWORTH AVE @ Summit Existing Conditions April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 56

CHATSWORTH AVE @ Summit Proposed: Bike Lanes & Buffers April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 57

TRANSITION AT INTERSECTION April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 58

IMPLEMENTATION April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 59

IMPLEMENTATION STRATEGY: POLICY April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 60

IMPLEMENTATION STRATEGY: FUNDING April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 61

April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 62 FUNDING SOURCES Safe, Accountable, Flexible, Efficient Transportation Equity Act Safe Routes to Schools (SRTS) Transportation Enhancement Program (TEP) SAFETEA-LU EXPIRED MARCH 2011 Capital Improvement Plan

THANK YOU! April 28, 2011 NYU Wagner Capstone: Rye YMCA Slide 63