PRESSURE SYSTEMS POLICY

Similar documents
E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

Examples of pressure systems and equipment are:

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

GUIDELINES. Systems. Pressure

Procedure: Pressure equipment safety

Wilkins Safety Group

Annex B To Loughborough University Facilities Management Health and Safety Policy

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Accreditation for In-Service Inspection of Pressure Systems/Equipment

Gas Safety Code of Practice

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

BCGA GUIDANCE NOTE 17

Gas Safety Management Policy

Health and Safety Inspection Procedure

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

HS26 Working at Height Policy and Procedure

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

Contractor handbook. Purpose

Pressure Systems Safety Regulation

Pressure Vessel Program

Health, Safety and Welfare Policy

SOP. Working in Confined Spaces

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

LEGIONELLA MANAGEMENT PROCEDURE

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

Work Health and Safety Risk Management Procedures

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998

Compliance with Health & Safety legislation

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

LADDERS FIXED AND PORTABLE

Method Statement: Testing Dry Riser System

PLANT AND EQUIPMENT SAFETY

Hazardous Energy Control

Health & Safety Policy & Plan. Rightway Roofing.

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

Geotechnics, Face and Stockpile Operations

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

Do you Operate or Own a Scissor Lift Table?

Safety Services Guidance. Guidance on Statutory Inspections

GUIDE YVL 3.7 / 26 Se p t e m b e r 2008

Policy Redesign Project. Plant Safety Policy. Table of Contents

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment

To comply with the OHS Act, the responsible manager must carry out and document the following:

July Ballast Water Management FAQ

BOC Healthcare Training

HEALTH & SAFETY GUIDANCE

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING

Health & Safety Policy HSP 07 Legionella Management Version Status Date Title of Reviewer Purpose/Outcome

CONTRACTOR SAFETY INDUCTION HANDBOOK

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

IHEA HFMC Stuart Lloyd. Managing Legionella: Achieving Best Practice. Legionella background

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

Your water byelaws explained

Legionella Management Policy

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Lifting Operation & Lifting Equipment Procedure

Australian/New Zealand Standard

Competency type. positions. All workers (including contractors), higher degree students and volunteers

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Control of Allergies to Laboratory Animals

Isolation Standard - Tags

Lifting Equipment Protocol

AED Program 2017 January 2017

SOP #: Pressure Vessels

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Introduction. Legal Duties. Risk Assessment

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

LIFT MAINTENANCE POLICY

Emergency Situation Assessment

Standards of Practice Personal Protective Equipment

Work at height Policy

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

GUIDANCE IN-SERVICE INSPECTION PROCEDURES. Status: Issue: 01 Date: 05/12/07

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

Legionella Policy. Policy Ref: PS08. Prepared By. Georgina Kent, Operations Director. Date of Current Review August 2018

3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals.

Significant Change to Dairy Heat Treatment Equipment and Systems

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

Annex 1 to Decision 2009/007/R

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

LEGIONELLA CONTROL POLICY

Suitability of Work Equipment

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version

Vessel Code of Practice

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

LOCKOUT SYSTEM AND POLICIES

BOC Healthcare training

WILTSHIRE POLICE FORCE PROCEDURE

EUSCS04 Overseeing work in confined spaces

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Project & Task Work Health and Safety Risk Management Procedure

Transcription:

PRESSURE SYSTEMS POLICY

PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review

1. Introduction The Kilmarnock Leisure Centre Trust (KLCT) has responsibility for compliance with the Health and Safety at work etc. Act 1974 and all associated legislation to ensure the safety of all visitors to the Galleon Centre including all employees, contractors and customers. The associated legislation includes specific legislation relating to the safe use of pressure systems and pressure vessels. Failure to follow appropriate guidelines and adopt adequate safe working practices, in accordance with the Health and Safety at work etc Act 1974, The Pressure Equipment Regulations 1999 and the Pressure Systems Safety Regulations 2000 is likely to lead to prosecution. This policy has been developed to ensure awareness of what pressure systems and equipment are and the risks involved in working with it. The purpose of this policy is to create a safe working environment that ensures that the pressure systems in use are maintained and operated within the requirements of The Pressure Equipment Regulations 1999 and the Pressure Systems Safety Regulations 2000 and so ensuring the safety of all employees, customers and contractors whilst minimising the risk of danger in working in and around pressure systems. 2. Policy Statement 2.1 The Policy will apply, without exception, to the Centre as a whole and all individuals employed or contracted by KLCT. 2.2 Responsibility for the implementation of this Policy will rest with the General Manager. 2.3 This Policy will follow the guidance and recommendations in the ACoP L122 (second edition) issued by the Health and Safety Executive. 2.4 KLCT will also: Clearly define the organisational arrangements for achieving compliance Maintain records and check that procedures are being carried out properly and effectively Ensure resources are made available to achieve compliance Ensure records are kept of maintenance, testing and written statements of examination for all pressure vessels.

3. Scope This policy applies to the Galleon Centre at Titchfield Street, Kilmarnock, KA1 1QY and takes into account all pressure vessels, equipment and systems including: boilers and steam heating systems; pressurised process plant and piping; compressed air systems (fixed and portable); pressure cookers, autoclaves and retorts; heat exchangers and refrigeration plant; valves, steam traps and filters; pipework and hoses; and pressure gauges and level indicators. 4. Background Since 2002, most pressure equipment placed on the market has had to meet the requirements of the Pressure Equipment Regulations 1999. For pressure equipment not covered by the Pressure Equipment Regulations 1999, the more general requirements of the Pressure Systems Safety Regulations 2000 apply. The Regulations require KLCT to: Establish the safe operating limits of the system. Have suitable Written Schemes drawn up or certified by a Competent person for the examination at appropriate intervals for each Pressure System Ensure those parts of the pressure system in which a defect may give rise to danger shall be identified in the scheme Check operation of all safety devices. Identify any pipework which is potentially dangerous. The Written Scheme is a working document produced and maintained by a Competent Person, who determines the frequency and nature of the examinations needed on each of the pressure systems and specifies any special measures needed to prepare the system for safe examination The Competent Person is the company contracted to carry out the duties under the Regulations. KLCT contract HSB Engineering Insurance Services Limited to undertake the role of Competent Person; this role has two distinct functions: Drawing up and certifying schemes of examination. Carrying out these examinations according to the Written Scheme.

The Written Scheme should include: Identification of the plant or equipment. Those parts of the system to be examined. The nature of the examination required. The frequency of examination. Preparatory work needed to enable item to be examined safely. Inspection and testing of any protection devices. Date of certification. Name of person certifying the written scheme. Repair and modification testing process and certification. The Trust should maintain a register of all assets covered under the written scheme. 5. Roles and Responsibilities 5.1 General Manager: Responsible for: (i) Ensuring that all senior personnel (Duty Manager & above) are provided with the necessary information, instructions and training to be able to fulfil their roles and responsibilities under this Policy. (ii) Reporting to the Kilmarnock Leisure Centre Trust any incident which may lead to investigation by the Local Authority or enforcement action or criminal prosecution/civil action being raised. (iii) Ensuring a Competent Person is appointed to undertake statutory insurance inspections and to prepare a written scheme for each pressure system. (iv) Ensuring all routine planned maintenance and statutory inspections are carried out in accordance with the statutory requirements. (v) Ensuring there is a current asset register of Pressure Vessels. 5.2 Deputy General Manager: Responsible for: (i) Implementing the Policy in full and ensuring all other personnel are fulfilling their responsibilities in relation to pressure systems. (ii) The analysis of inspection results and taking action to ensure recommendations are complied with. (iii) Reporting to the General Manager any incident which may lead to investigation by the Local Authority or enforcement action or criminal prosecution/civil action being raised. (iv) Taking any measures necessary to ensure that the Policy is implemented and fully complied with. (v) Liaising with the Competent Person to ensure inspections are completed in a timely manner. (vi) Identifying and ensuring corrective actions are completed.

(vii) Ensuring that all personnel are provided with the necessary information, instructions and training to be able to fulfil their roles and responsibilities under this Policy. (viii) Ensuring all routine planned maintenance and statutory inspections are carried out in accordance with the statutory requirements. (ix) Informing the Competent Person of any changes to the systems to allow the Pressure Systems Written Scheme to be updated. 5.3 Operations Manager: Responsible for: (i) (ii) All aspects of the Policy in the absence of the Deputy General Manager. Reporting any concerns to the Deputy General Manager 5.4 Duty Manager: Responsible for: (i) Liaising with Contractors and reporting any concerns to the Deputy General Manager or Operations Manager. 6. Training The General Manager will ensure that all staff with a technical role to play will be given the opportunity to attend training to equip them with the appropriate knowledge information and instruction as detailed in the Health and Safety Executives documentation. Training needs will be reviewed on a regular basis. 7. Contractors Only Contractors with system knowledge, experience and relevant training will be allowed to operate and maintain pressure systems. They should ensure that the pressure systems are operated safely and that: Safe operating limits of the plant/equipment are observed. Appropriate actions are taken in the event of any emergency. The user of the pressure system is operating the system correctly in accordance with the instructions provided in respect of that system. Contractors may have to assist the Competent Person whilst on site undertaking testing and examination of pressure systems. Any remedial repairs will be undertaken by an approved contractor and may possibly be verified by the competent person. 8. Policy Review This policy will be reviewed every 3 years or earlier if research, evidence or a change in practice or legislation requires a review to be undertaken.