MSC Guidelines for Compressed Air Systems

Similar documents
MSC Guidelines Potable Water Systems

MSC Guidelines for Pressure Vessels

MSC Guidelines for Sanitary & Sewage Systems

MSC Guidelines for Refrigeration Machinery

MSC Guidelines for Review of Inland Tank Barge Stability Procedure Number: C1-13 Revision Date: May 13, 2016

MSC Guidelines for Vents, Fills and Sounds

MSC Guidelines for Gas Carrier Barge Cargo Authority Procedure Number: C1-41 Revision Date: January 27, 2012

MSC Guidelines for Engine Cooling Systems

MSC Guidelines for the Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: March 30, 2012

MSC Guidelines for Independent Fuel Tanks

MSC Guidelines for Review of Vapor Control Systems Procedure Number: C1-46 Revision Date: 01/08/2018

T. O. PHILLIPS, CDR, Tank Vessel and Offshore Division

MSC Guidelines for Review of Cargo and Miscellaneous Vessel Stability (Subchapter I)

MSC Guidelines for Bilge and Ballast Systems

MSC Guidelines for Review of General Arrangements (Subchapters H, I, K, R, & U)

MSC Guidelines for the Review of Mobile Offshore Drilling Unit (MODU) General Arrangement Plans Procedure Number: C2-36 Revision Date: 10/18/2016

Guidelines for Clean Agent Fire Suppression Systems

MSC Guidelines for Review of Passenger Vessel Stability (Subchapters K & H)

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

MSC Guidelines for Review of Stability for Towing Vessels (M)

MSC Guidelines for Carbon Dioxide Fire Suppression Systems

MSC Guidelines for Tank Barge General Arrangements Procedure Number: C1-16 Revision Date: June 1, 2017

MSC Guidelines for Liquefied Gas Barge General Arrangements

MSC Guidelines for Review of General Arrangement Plans for Small Passenger Vessels (T)

MSC Guidelines for the Review of OSV Stability

MSC Guidelines for Review of Gas Carrier Stability (Intact, Damaged, Lightship, and Special Loading Authorization)

MSC Guidelines for Review of Emergency Evacuation Plans (Subchapter K)

MSC Guidelines for the Review of Oil Spill Response Vessels (OSRV), Lightship and Stability

Marine Safety Center Technical Note

MSC Guidelines for the Submission of Stability Test (Deadweight Survey or Inclining Experiment) Results

MSC Guidelines for Review of Emergency Evacuation Plans (NVIC 8-93)

MSC Guidelines for Review of Rigging Systems for Sailing Vessels

MSC Guidelines for Review of Gas Carrier/Barge Structures

U.S. COAST GUARD MARINE SAFETY CENTER PLAN REVIEW GUIDELINE

MSC Guidelines for Fire Main Systems Procedure Number: E1-09 Revision Date: 04/16/2018

MSC Guidelines for Commercial Fishing Vessel Stability Procedure Number: H2-20 Revision Date: 06/17/2013

Horizontal Bladder Tanks

Vertical Bladder Tanks

The capacity of the cargo tank venting system (46 CFR );

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION)

Limited quantities of compressed gases.

Model MTB-ASME Vertical Bladder Tanks

Series 58 SAFETY VALVES 312

Model MTB-ASME Horizontal Bladder Tanks

Model MTB-ASME Vertical Bladder Tanks

SOP #: Pressure Vessels

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

PIP PNE00012 Piping Examination and Leak Test Guide

Regulations Respecting Compressed Gas Pressure Vessels

ocr o12011

Subj: PIPELINE AND HOSE TESTING GUIDANCE FOR MARINE TRANSPORTATION RELATED FACILITIES HANDLING OIL OR HAZARDOUS MATERIAL IN BULK

SLOP RECEPTION AND PROCESSING FACILITIES

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

DESIGN DATA. Dry 105a. September 5, 2008

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

ACCU-PULSE Installation and Operation Instructions

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C EXPIRATION DATE: June 30, 2015

Pressure Vessel Design

29 SERIES - SAFETY VALVE

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

Testing Procedures of Watertight Compartments

Hockema & Whalen Associates

22. Specialty Valves.

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR ) 1. GRANTEE: Structural Composites Industries (SCI) Pomona, CA

SECTION DOMESTIC WATER PIPING

DOT-SP 8391 (FIFTHTEENTH REVISION) EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR )

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Pressure Vessel Program

Standard Pneumatic Test Procedure Requirements for Piping Systems

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

GAS SAFETY Information Bulletin

THE PRESSURE NEWS GASKET FAILURE DURING HYDROSTATIC TEST IN THIS ISSUE: OVERPRESSURE PROTECTION FOR FIRE PROTECTION SYSTEMS SPRINKLER TANKS

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

What is pressure relief valve? Pressure relief valve

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

Type 3 - PSA Nitrogen Generation System

SECTION BUTTERFLY VALVES

EXPIRATION DATE: October 31, 2018 (FOR RENEWAL, SEE 49 CFR )

GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS

Pressure and/or Temperature Pilot Operated Steam Regulators Series 2000

PRESSURIZED EQUIPMENT AND SYSTEMS

CAST IRON SAFETY VALVE TYPE 6301

HANDBOOK. Squeeze Off Unit SOU 400. Please refer any queries to:

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

Sizing Pulsation Dampeners Is Critical to Effectiveness

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (FOURTH REVISION)

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

STS 650 PRESSURE EQUIPMENT

An Urgent Bulletin from CSA Group

Introduction. Part one: Identify the Hydraulic Trainer Components

Vertical and Horizontal Bladder Tanks

Type 1 - Nitrogen Generation System. Designed for: Dry or Pre-Action Fire Protection Systems (FPS) with a total capacity up to 750 gallons

Transcription:

Procedure Number: E1-04 Revision Date: 12/16/2013 References: a. 46 CFR 54 Pressure Vessels (Subchapter F) P. W. Gooding, CDR, Chief, Engineering Division b. 46 CFR 56 Piping Systems & Appurtenances (Subchapter F) c. 46 CFR 58.30 Fluid Power & Control Systems (Subchapter F) d. 46 CFR 119.700 Piping Systems (Subchapter K) e. 46 CFR 182.700 Piping Systems (Subchapter T) f. 46 CFR 128 Marine Engineering: Systems & Equipment (Subchapter L) g. 46 CFR 32.35-15 Installation of Air Compressors (Subchapter D) h. 46 CFR 32.50-3 Cargo Discharge (Subchapter D) i. 46 CFR 197.310 Diving Air Compressor System (Subchapter V) j. ASTM F1155-98, Standard Practice for Selection and Application of Piping System Materials Contact Information: If you have any questions or comments concerning this document, please contact the Marine Safety Center (MSC) by e-mail or phone. Please refer to the Procedure Number: E1-04 E-mail: MSC@uscg.mil Phone: 703-872-6729 Website: http://homeport.uscg.mil/msc Responsibilities: Using applicable portions of references (a) through (j), the submitter shall provide sufficient documentation and plans to indicate compliance with the applicable requirements. The submission shall be made in triplicate. To facilitate plan review and project management, all plans and information specified in these guidelines should be submitted as one complete package through a single point of contact for the project. U. S. Coast Guard Marine Safety Center 1

: To assist in applying the correct regulations, first determine the type and class of the compressed air system: Vital/non-vital (46 CFR 56.07-5, 119.710, 128.130, 182.710) Class I or II (46 CFR 56.04) Vessels Subject to Subchapter F The guidelines in this section are provided specifically for vessels subject to regulation under 46 CFR Subchapter F. However, following these guidelines for any compressed air system will facilitate and expedite the plan review process. Specific guidelines for various classes of vessels can be found in subsequent sections below. Are the plans complete and suitable for submission to the Coast Guard for review (46 CFR 56.01-10) to include the following? a. Piping diagram b. List of materials c. Pipe diameters d. Wall thicknesses e. Design pressure/temperature f. ASTM material and ANSI component specifications g. Type, size, design standard and rating of valves, flanges, and fittings h. Bulkhead & watertight boundary penetration details i. Calculations required by 46 CFR 50.20-25 (MAWP, minimum thickness) j. Calculations for all pressure containment components (46 CFR 54.01-18) or acceptable evidence of industry standard (i.e. ASME U or UM stamp) (46 CFR 54.01-5) Materials used in the manufacture of tubing, pipes, valves, flanges, and fittings shall be selected from those specifications which appear in 46 CFR Table 56.60-1(a) or Table 56.60-2(a), or they may be selected from the applicable material specifications of sections I, III, and VIII of the ASME Code. (46 CFR 58.30-15(b)) Flexible nonmetallic hose shall meet SAE J-1942 and may be used only where flexibility is required, in lengths not exceeding 30 inches and limited to the manufacturer s recommended MAWP. Hose fittings shall comply with SAE J1475. Unreinforced hoses are limited to a maximum service pressure of 50 psi, reinforced hoses are limited to a maximum pressure of 150 psi. (46 CFR 56.60-25(b)) 2

Bolting shall meet the requirements of 46 CFR 56.25-20 except that regular hexagon bolts conforming to SAE J429, Grades 2 through 8, or ASTM A-193 may be used in sizes not exceeding 1 ½ inches. (46 CFR 58.30-15(c)) Nonferrous materials may only be used in accordance with 56.60-20 and reference (j). Piping systems shall be designed, constructed, and inspected in accordance with ANSI B31.1, as limited, modified, or replaced in 46 CFR Part 56. All fluid power and control systems listed in 46 CFR 58.30-1(a) shall comply with the requirements of 46 CFR 58.30-5 through 58.30-40. The design, construction, and testing of unfired pressure vessels, such as accumulators, shall meet the applicable requirements of 46 CFR 54.01-5 (c)(3), (c)(4), and (d) or the remaining requirements in Part 54. (46 CFR 58.30-25). Those systems not listed in 46 CFR 58.30-1(a) shall meet the requirements of 46 CFR 58.30-50. Pressure piping calculations must be submitted which show that the compressed air system is designed in accordance with ANSI B31.1. Unless stamped with an ASME U or UM stamp, pressure vessels must be designed to the ASME Boiler and Pressure Vessel Code, Section VIII (or other appropriate reference). Detailed calculations must be submitted to verify compliance. Pneumatic systems with a maximum allowable working pressure in excess of 150 psi shall be designed with a surge tank or other acceptable means of pulsation dampening. (46 CFR 58.30-5(c)) Each pneumatic system must minimize the entry of oil into the system and must drain the system of liquids. (46 CFR 58.30-5(d)) Pneumatic cylinders consisting of a container and a movable piston rod extending through the containment vessel, converting pressure to work, shall comply with 46 CFR 58.30-30. Where pipes are carried through bulkheads, decks, or tank tops, the integrity of the structure shall be maintained. (46 CFR 56.50-1) 3

The following guidelines may be in addition to the requirements of 46 CFR Subchapter F. Vessels Subject to Subchapter D Use of compressed air as a means of discharging cargo from gravity type cargo tanks is prohibited. (46 CFR 32.50-3) Installation of air compressors in cargo areas is restricted for those areas listed in 46 CFR 32.35-15. Vessels Subject to Subchapters T or K Applicability of the following guidelines is denoted by (T), (K) or (T/K) (T) Flexible nonmetallic hose shall meet SAE J-1942 and is subject to the limitations of 46 CFR 182.720(d)(1) through (d)(4). Unreinforced hoses are limited to a maximum service pressure of 50 psig, reinforced hoses are limited to a maximum service pressure of 150 psig. Hose fittings shall comply with SAE J1475. (T/K) Unfired pressure vessels (accumulators, flasks, receivers, etc.) must meet the applicable requirements of 46 CFR Subchapter 54. Piping used in vital systems (i.e. propulsion or steering control systems): a. (K) Must meet 46 CFR 56.60 (piping materials) with the exception of nonferrous metallic piping, which must meet 46 CFR 119.730 or reference (j). or reference (j) b. (T) Must be composed of ferrous materials except when nonferrous metallic piping materials are permitted by 46 CFR 182.730 or reference (j). (K) Nonmetallic piping materials in both vital and non-vital systems must meet 46 CFR 56.60-25. (T/K) Piping subject to more than 1,034 kpa (150 psig) in a non-vital system shall be designed, constructed, and inspected in accordance with ANSI B31.1 (46 CFR 119.715 and 182.715) 4

Vessels Subject to Subchapter L Pressure design must meet the standards in 46 CFR Subchapter F (46 CFR 128.210). For Class II non-vital systems, materials and design need not meet 46 CFR Subchapter F. The submitter must certify in writing that the system, as designed, is suitable for the intended service (46 CFR 128.220). Penetrations of hulls and watertight bulkheads must be to 46 CFR Subchapter F standards for materials and design in both vital and nonvital systems. (46 CFR 128.230) Non-standard hydraulic or pneumatic component (such as control valves, check valves, relief valves, and regulators) may be accepted by the cognizant OCMI or the Commanding Officer, Marine Safety Center, if the component is certified by the manufacturer as suitable for marine service and if: a. The component meets each of the requirements for materials and pressure design of 46 CFR 56.60 and 46 CFR 58.30 and if its service is limited to the manufacturer's rated pressure; or b. The service of the component is limited to 1/2 the manufacturer's recommended maximum allowable working pressure (MAWP) or 1/10 the component's burst pressure. Burst-pressure testing is described in ANSI B 31.1, Paragraph 104.7.A, and must be conducted to comply with Paragraph A-22, Section I, ASME Boiler and Pressure Vessel Code. Written certification of results of burst-pressure testing must be submitted with the plans required by 46 CFR 127.110(d). (46 CFR 128.240) Commercial Diving Operations (Subchapter V) Air compressor systems installed onboard for commercial diving operations shall comply with 46 CFR 197.310. Disclaimer This guidance is not a substitute for applicable legal requirements, nor is it itself a rule. It is not intended to nor does it impose legally-binding requirements on any party. It represents the Coast Guard s current thinking on this topic and may assist industry, mariners, the general public, and the Coast Guard, as well as other federal and state regulators, in applying statutory and regulatory requirements. You can use an alternative approach for complying with these requirements if the approach satisfies the requirements of the applicable statutes and regulations. If you want to discuss an alternative, you may contact the Marine Safety Center, the unit responsible for implementing this guidance. 5